Viasat launches new headquarters in London
April 15, 2024
London
KeySource built the data center facility in 2012, and it uses adiabatic cooling. According to Datum, the adiabatic cooling allows it to achieve a PUE of 1.25. Datum also signed Renewable Energy Guarantees of Origin to counterbalance its energy use. UBS revealed that it would be pursuing site expansion and opportunities in the future.
| Distance | Site | About |
|---|---|---|
| 0.28 miles | Ark: Cody Park |
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
|
| 0.96 miles | Asanti: Farnborough |
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
|
| 3.90 miles | Gravity Edge: London LDN1 |
Located in Camberley, Gravity Edge LDN1 is a mission-critical data center flagship that bridges the gap between traditional enterprise hosting and the high-density demands of modern AI.
|
| 9.25 miles | Hyperscale Data Center Request Dataset |
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
|
| 9.38 miles | Level3 Bracknell | |
| 9.44 miles | Hyperscale Data Center Request Dataset | |
| 9.47 miles | Vodafone: London Bracknell |
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
|
| 9.49 miles | Keppel: London Bracknell |
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
|
| 9.55 miles | Digital Realty Woking |
|
| 9.55 miles | CyrusOne London Woking |
|
| 9.56 miles | CentriLogic Berkshire |
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
| 9.64 miles | Stellanor: Woking TC3 |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 9.64 miles | NaviSite Woking | |
| 9.81 miles | Smallworld: Guildford |
|
| 11.12 miles | Ark: Longcross |
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
|
| 11.14 miles | Ark: Longcross 2 |
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
|
| 11.46 miles | Centersquare: Reading LHR3 |
Southern Electric provides power feeds
Power density minimum(W/sf) = 150
|
| 12.42 miles | Stellanor: Reading |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 12.57 miles | Asanti: Reading |
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
|
| 12.85 miles | Pulsant: Reading SE-3 |
|
| 12.88 miles | Amito Reading | |
| 13.71 miles | Pulsant: Reading SE-4 |
|
| 14.42 miles | Stellanor: Byfleet |
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
|
| 15.68 miles | Pulsant: Maidenhead SE-2 |
|
| 17.45 miles | iomart DC5 Maidenhead |
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
|
| 17.88 miles | CyrusOne LON5 | |
| 17.93 miles | Segro: Slough 2 |
This planned facility will be part of Segro's London Slough Campus.
|
| 17.93 miles | Segro: London Slough Campus |
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
|
| 18.02 miles | Tritax: London Slough (Phase 1) |
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
| 18.02 miles | Kao Data Slough |
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
| 18.05 miles | Digital Realty: LHR27 |
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
|
| 18.05 miles | Digital Realty: LHR26 |
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
|
| 18.07 miles | Tritax: London Slough (Phase 2) |
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
| 18.08 miles | China Mobile Slough | |
| 18.08 miles | VIRTUS London 11 | |
| 18.08 miles | Gravity Edge: London LDN2 | |
| 18.10 miles | NTT Slough 2 |
|
| 18.11 miles | GTR: Slough 3 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 18.11 miles | GTR: Slough 2 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 18.11 miles | GTR: Slough |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 18.12 miles | NTT Slough 3 |
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
| 18.13 miles | Equinix LD11x | |
| 18.17 miles | Equinix LD4 |
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
| 18.19 miles | VIRTUS LONDON9 | |
| 18.23 miles | Equinix LD5 |
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
| 18.24 miles | Virgin Media O2 Slough |
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
| 18.25 miles | Iron Mountain London LON-2 | |
| 18.25 miles | Iron Mountain: LON3 |
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
|
| 18.26 miles | Logicalis Slough | |
| 18.26 miles | GoDaddy Slough (HEG) | |
| 18.26 miles | Equinix Slough Campus LD4, LD5, LD6, LD10 |
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
| 18.26 miles | Equinix LD6 | |
| 18.28 miles | Rackspace London Slough (LON3) |
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
| 18.29 miles | VIRTUS LONDON10 | |
| 18.30 miles | Equinix LD10 |
|
| 18.31 miles | Equinix LD13x | |
| 18.36 miles | Equinix LD7 |
|
| 18.36 miles | Equinix LD14 | |
| 18.37 miles | Equinix LD12 | |
| 18.39 miles | VIRTUS Slough London 3 and 4 |
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
| 18.41 miles | CyrusOne London I |
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
| 18.43 miles | Iron Mountain London LON-1 |
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
| 18.45 miles | Lumen Slough |
|
| 18.49 miles | CyrusOne London III |
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
| 18.50 miles | Equinix: Wexham Road |
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
| 18.57 miles | Yondr: Slough Campus |
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
|
| 18.63 miles | Yondr: Slough 2 |
This facility is part of Yondr's London Slough Campus.
|
| 18.68 miles | Yondr: Slough 3 |
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
|
| 18.72 miles | DataBank: London Heathrow |
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
|
| 18.73 miles | ServerFarm London |
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
|
| 19.83 miles | Thorney: Iver DC-D |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 19.87 miles | Thorney: Iver DC-E |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 19.92 miles | Thorney: Iver DC-F |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 19.97 miles | Segro: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 19.99 miles | Thorney Lane LLP: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
April 15, 2024
London
March 29, 2024
London
February 29, 2024
London
January 10, 2024
London
November 18, 2023
London
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas