|
0.00 miles
|
Gravity Edge: London LDN1
|
Gravity Edge LDN1 is a 145,585 sq ft, 5.4-acre freehold data center campus in Yorktown Business Park, Camberley, west of London, with 36 MVA of secured SSEN grid supply, 8 MW operating and a brownfield expansion to 22 MW underway.
|
|
2.94 miles
|
Asanti: Farnborough
|
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
|
|
3.69 miles
|
Kyndryl: Farnborough
|
|
|
3.90 miles
|
Datum FRN1
|
|
|
3.92 miles
|
Ark: Cody Park
|
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
|
|
5.60 miles
|
Level3 Bracknell
|
|
|
5.67 miles
|
Central ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.75 miles
|
Vodafone: London Bracknell
|
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
|
|
5.76 miles
|
CentriLogic Berkshire
|
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
|
5.77 miles
|
Keppel: London Bracknell
|
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
|
|
7.76 miles
|
Digital Realty Woking
|
|
|
7.76 miles
|
CyrusOne London Woking
|
|
|
7.85 miles
|
NaviSite Woking
|
|
|
7.85 miles
|
Stellanor: Woking TC3
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
8.07 miles
|
Ark: Longcross 1
|
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
|
|
8.08 miles
|
Ark: Longcross 2
|
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
|
|
8.78 miles
|
Centersquare: Reading LHR3
|
Southern Electric provides power feeds
Power density minimum(W/sf) = 150
|
|
10.45 miles
|
Smallworld: Guildford
|
|
|
10.85 miles
|
Stellanor: Reading
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
10.92 miles
|
Asanti: Reading
|
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
|
|
11.24 miles
|
Pulsant: Reading SE-3
|
|
|
11.27 miles
|
Amito Reading
|
|
|
11.33 miles
|
Thames Valley Park DC
|
A data center has been proposed to redevelop office space previously used by Microsoft at Thames Valley Park in Reading, UK.
|
|
11.40 miles
|
Pulsant: Reading SE-4
|
|
|
11.81 miles
|
Pulsant: Maidenhead SE-2
|
|
|
12.37 miles
|
Stellanor: Byfleet
|
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
|
|
13.62 miles
|
iomart DC5 Maidenhead
|
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
|
|
13.99 miles
|
CyrusOne LON5
|
|
|
14.06 miles
|
Segro: 200 Bath Road
|
Planned three-storey powered-shell data center by Segro at 200 Bath Road, Slough, on the site of the former Unatrac, Ipsen and BlackBerry offices. Full planning permission granted in 2024.
|
|
14.07 miles
|
Segro: 210 Bath Road
|
Planned data center by Segro at 210 Bath Road, Slough, on the site of the former UCB and Black & Decker offices. Outline planning permission granted in 2024; detailed design to follow.
|
|
14.14 miles
|
Kao Data Slough
|
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
|
14.17 miles
|
VIRTUS: London 11
|
|
|
14.17 miles
|
Digital Realty: LHR27
|
LHR27 is building B of Digital Realty's Slough campus at 631 Ajax Avenue, Slough Trading Estate, 15 minutes from London Heathrow.
|
|
14.17 miles
|
Digital Realty: LHR26
|
LHR26 is building A of Digital Realty's Slough campus at 630 Ajax Avenue, Slough Trading Estate. Digital Realty acquired the former Cyxtera LHR1 site in 2024.
|
|
14.19 miles
|
China Mobile Slough
|
|
|
14.23 miles
|
NTT Slough 2
|
|
|
14.24 miles
|
GTR: Slough 1
|
Building 1 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The western block, and the first one GTR fitted out.
|
|
14.24 miles
|
GTR: Slough 2
|
Building 2 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The middle block.
|
|
14.24 miles
|
Equinix LD11x
|
|
|
14.24 miles
|
GTR: Slough 3
|
Building 3 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The eastern block.
|
|
14.25 miles
|
NTT Slough 3
|
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
|
14.28 miles
|
Equinix LD4
|
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
|
14.31 miles
|
VIRTUS: London 9
|
|
|
14.34 miles
|
Equinix LD5
|
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
|
14.34 miles
|
Virgin Media O2 Slough
|
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
|
14.37 miles
|
Iron Mountain: LON-2
|
LON-2 is a 269,000 square foot data center at 110 Buckingham Avenue in the Slough Trading Estate.
|
|
14.37 miles
|
Iron Mountain: LON-3
|
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
|
|
14.37 miles
|
Equinix LD6
|
|
|
14.37 miles
|
Logicalis Slough
|
|
|
14.38 miles
|
GoDaddy Slough (HEG)
|
|
|
14.40 miles
|
Rackspace London Slough (LON3)
|
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
|
14.41 miles
|
Equinix LD10
|
|
|
14.42 miles
|
Equinix LD13x
|
|
|
14.42 miles
|
VIRTUS: London 10
|
|
|
14.45 miles
|
VIRTUS: London 3
|
LONDON3 is a SEGRO-built extension next to VIRTUS's LONDON4 on Liverpool Road, Slough, linked directly to it. VIRTUS signed a 20-year lease in 2017 and completed the fit-out in December 2018.
|
|
14.46 miles
|
VIRTUS: London 12
|
LONDON12 is VIRTUS's newest operating building on its Slough campus, at 485 Berkshire Avenue on the Slough Trading Estate. Fit-out finished in early 2026.
|
|
14.46 miles
|
Equinix LD7
|
|
|
14.47 miles
|
Equinix LD14
|
|
|
14.47 miles
|
Tritax: Manor Farm (Phase 1)
|
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
|
14.47 miles
|
CyrusOne London I
|
CyrusOne London I (LON1) is the former Zenium London One at 12 Liverpool Road on the Slough Trading Estate: one two-storey building with about 4,300 sq m of technical space. CyrusOne acquired it with Zenium in 2018.
|
|
14.47 miles
|
Equinix LD12
|
|
|
14.50 miles
|
VIRTUS: London 4
|
LONDON4 is the former Infinity SDC Slough data centre on Liverpool Road, which VIRTUS bought in 2015. It anchors the VIRTUS Slough campus and hosts the Jisc Shared Data Centre.
|
|
14.51 miles
|
Tritax: Manor Farm (Phase 2)
|
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
|
14.52 miles
|
VIRTUS: London 19
|
VIRTUS Data Centres plans to add a new high-density, carrier-neutral facility at the Slough Trading Estate. SEGRO will develop the powered-shell building, while VIRTUS will complete the specialist data-centre fit-out and operate the facility.
|
|
14.54 miles
|
Iron Mountain London LON-1
|
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
|
14.57 miles
|
Lumen Slough
|
|
|
14.60 miles
|
CyrusOne London III
|
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
|
14.68 miles
|
Equinix: Wexham Road
|
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
|
14.75 miles
|
Yondr: Slough 1
|
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
|
|
14.82 miles
|
Yondr: Slough 2
|
This facility is part of Yondr's London Slough Campus.
|
|
14.87 miles
|
Yondr: Slough 3
|
Yondr’s Slough 3 data center is the third facility on the company’s London campus, expanding its hyperscale presence on a former industrial site in one of the UK’s main data center markets.
|
|
15.34 miles
|
Plaza PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.56 miles
|
DataBank: London Heathrow
|
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
|
|
15.57 miles
|
ServerFarm London
|
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
|
|
16.15 miles
|
Thorney: Iver DC-D
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
16.19 miles
|
Thorney: Iver DC-E
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
16.24 miles
|
Thorney: Iver DC-F
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
16.30 miles
|
Segro: Iver Campus
|
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
|
16.32 miles
|
Thorney Lane LLP: Iver Campus
|
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
|
16.37 miles
|
Thorney: Iver DC-B
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
16.42 miles
|
Thorney: Iver DC-C
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
16.64 miles
|
North CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.72 miles
|
DRT London (West Drayton)
|
|
|
16.83 miles
|
Link Park Heathrow Data Center
|
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
|
|
16.92 miles
|
CorScale: Court Lane 2
|
This is the second building at CorScale's Court Lane Campus in Iver, Buckinghamshire.
|
|
16.95 miles
|
CorScale: Court Lane 1
|
In December 2024, Corscale Data Centers secured planning approval for its first UK project, the Corscale Court Lane Data Center in Iver, Buckinghamshire.
|
|
17.00 miles
|
Thorney: Iver DC-A
|
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
17.76 miles
|
Verizon London UK4
|
|
|
17.78 miles
|
Pinewood South: Buckinghamshire Campus
|
The Pinewood South Data Centre is a planned £1 billion ($1.3bn) hyperscale-ready campus located on a 19.5-hectare site directly south of Pinewood Studios in Iver Heath, Buckinghamshire.
|
|
18.05 miles
|
VIRTUS: London 8
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
|
18.07 miles
|
CyrusOne London II (Stockley Park)
|
The London II datacenter was originally built by Infinity SDC.
|
|
18.11 miles
|
West London Tech Bldg2
|
This facility is part of Greystoke's West London Tech Park.
|
|
18.12 miles
|
VIRTUS: London 7
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
|
18.14 miles
|
VIRTUS: London 5
|
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
|
18.16 miles
|
West London Tech Bldg1
|
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
|
|
18.18 miles
|
Brixton Heathrow Estate DC
|
Heathrow Estate Data Centre is a planned facility at Haslemere Heathrow Estate in Cranford, Hounslow.
|
|
18.20 miles
|
VIRTUS: London 6
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
|
18.20 miles
|
Sequence: Iver, Buckinghamshire
|
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
|
|
18.25 miles
|
VIRTUS: London 14
|
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
|
|
18.37 miles
|
CyrusOne: LON6 Bldg1
|
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
|
|
18.37 miles
|
CyrusOne: LON6 Bldg2
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
18.38 miles
|
CyrusOne: LON6 Bldg3
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
18.38 miles
|
CyrusOne: LON6 Bldg5
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
18.38 miles
|
CyrusOne: LON6 Bldg4
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
18.38 miles
|
CyrusOne: LON6 Bldg6
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
18.43 miles
|
Stellanor: Hounslow
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
18.60 miles
|
Rackspace: LON8
|
|
|
18.64 miles
|
QuickHostUK: High Wycombe
|
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
|
|
19.03 miles
|
Wycombe Air Park
|
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
|
|
19.06 miles
|
SDC: M40 Campus
|
The SDC M40 Campus is a planned £2 billion hyperscale data center development in Buckinghamshire, UK, backed by a partnership between US-based SDC Capital Partners and environmental utilities giant Veolia.
|
|
19.20 miles
|
VIRTUS Hayes London2
|
|
|
19.21 miles
|
EastInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.23 miles
|
Marvel: Hayes
|
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
|
|
19.28 miles
|
Ark: Union Park
|
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
|
19.37 miles
|
GTR: Southall 4
|
Data Centre 4 of GTR's GB Two campus in Southall, the south-west half of the large southern building it shares with Data Centre 3, near Bulls Bridge, in the second build phase.
|
|
19.40 miles
|
GTR: Southall 3
|
Data Centre 3 of GTR's GB Two campus in Southall, the north-east half of the large southern building it shares with Data Centre 4, in the second build phase.
|
|
19.45 miles
|
GTR: Southall 2
|
Data Centre 2 of GTR's GB Two campus in Southall, a four-storey building matching Data Centre 1 in the middle of the plot along the Grand Union Canal, in the first build phase.
|
|
19.51 miles
|
GTR: Southall 1
|
Data Centre 1 of GTR's GB Two campus in Southall, a four-storey building at the north end of the data centre plot next to the campus substations, in the first build phase.
|
|
19.80 miles
|
CapitaLand: Cressex Business Park
|
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
|
|
19.82 miles
|
DRT London (Cresses Business Park)
|
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
|
|
19.84 miles
|
Mulberry: Denham, Uxbridge
|
Developer Mulberry Commercial Developments II is planning to build a hyperscale data center on a greenbelt site near the village of Denham in Buckinghamshire, UK.
|