Ark: Cody Park

Operational
Fully operational facility
Operated by:

Ark: Cody Park

Short Code: A9, A101, A102, A103, A104, A105
Lot Size: 36 acres
░░░░ Request Dataset MW
Total Power

29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.

10,000 to 13,000 rack positions. 16 diverse fibre operators, numerous telecommunication companies.

Data Centre building names = A9, A101, A102, A103, A104, A105 Each of these buildings has multiple customer data suites/halls/rooms. Each of these buildings has multiple diverse fibre entry points, multiple shared MMR, plus private MMR.

Map and Nearby Locations

Ively Rd
Ark Data Centres (UK) Sites
Nearby Facilities

Sites within 15 miles of Ark: Cody Park

Distance Site About
0.28 miles Datum FRN1
1.04 miles Asanti: Farnborough
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
1.43 miles Kyndryl: Farnborough
3.92 miles Gravity Edge: London LDN1
Located in Camberley, Gravity Edge LDN1 is a mission-critical data center flagship that bridges the gap between traditional enterprise hosting and the high-density demands of modern AI.
9.27 miles Hyperscale Data Center Request Dataset
AWS data center on the former HP campus at Amen Corner, Cain Road, Bracknell - a single-storey, four-data-hall building (~27 MW total design capacity), operational since 2023.
9.35 miles Level3 Bracknell
9.43 miles Vodafone: London Bracknell
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
9.44 miles Keppel: London Bracknell
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
9.54 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
9.78 miles CyrusOne London Woking
9.78 miles Digital Realty Woking
9.87 miles Stellanor: Woking TC3
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
9.87 miles NaviSite Woking
10.09 miles Smallworld: Guildford
11.28 miles Ark: Longcross
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
11.30 miles Centersquare: Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
11.30 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
12.19 miles Stellanor: Reading
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
12.34 miles Asanti: Reading
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
12.62 miles Pulsant: Reading SE-3
12.65 miles Amito Reading
13.52 miles Pulsant: Reading SE-4
14.65 miles Stellanor: Byfleet
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
15.67 miles Pulsant: Maidenhead SE-2
17.42 miles iomart DC5 Maidenhead
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
17.92 miles CyrusOne LON5
17.98 miles Segro: Slough 2
This planned facility will be part of Segro's London Slough Campus.
17.98 miles Segro: London Slough Campus
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
18.06 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
18.09 miles Digital Realty: LHR27
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
18.09 miles Digital Realty: LHR26
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
18.11 miles China Mobile Slough
18.12 miles VIRTUS London 11
18.14 miles Tritax: London Slough (Phase 1)
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
18.15 miles Gravity Edge: London LDN2
18.15 miles GTR: Slough 3
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
18.15 miles GTR: Slough 2
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
18.15 miles NTT Slough 2
18.15 miles GTR: Slough
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
18.17 miles Equinix LD11x
18.17 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
18.19 miles Tritax: London Slough (Phase 2)
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
18.20 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
18.23 miles VIRTUS LONDON9
18.27 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
18.27 miles Virgin Media O2 Slough
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
18.29 miles Iron Mountain London LON-2
18.30 miles Iron Mountain: LON3
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
18.30 miles Equinix LD6
18.30 miles Logicalis Slough
18.30 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
18.31 miles GoDaddy Slough (HEG)
18.33 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
18.33 miles VIRTUS LONDON10
18.34 miles Equinix LD10
18.35 miles Equinix LD13x
18.39 miles Equinix LD7
18.39 miles Equinix LD14
18.40 miles Equinix LD12
18.43 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
18.45 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
18.47 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
18.49 miles Lumen Slough
18.52 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
18.57 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
18.64 miles Yondr: Slough Campus
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
18.70 miles Yondr: Slough 2
This facility is part of Yondr's London Slough Campus.
18.75 miles Yondr: Slough 3
Yondr’s Slough 3 data center is the third facility on the company’s London campus, expanding its hyperscale presence on a former industrial site in one of the UK’s main data center markets.
18.89 miles DataBank: London Heathrow
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
18.89 miles ServerFarm London
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
19.93 miles Thorney: Iver DC-D
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
19.97 miles Thorney: Iver DC-E
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.

Ark: Cody Park Data Center Photos See all

Campus layout
Source: Baxtel

Operating Company

Operated by:
17
Facilities
4
Markets

News See all

Read Mayor of London Commits to Joint Effort on Data Center Growth Challenges
London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A re...

Mayor of London Commits to Joint Effort on Data Center Growth Challenges

June 17, 2026 London

London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A report commissioned by the Greater London Authority and prepared by Buro Happold found that while...

Read more
Read Ark DC Adds New Building to Longcross Data Center Campus in UK
UK data center firm Ark is expanding its Longcross Park campus in Surrey to support AI cloud provider Nebius. The company has committed £807 million ($1bn) to the site, where Nebius will lease the ...

Ark DC Adds New Building to Longcross Data Center Campus in UK

June 09, 2026 Ark Data Centres (UK)

UK data center firm Ark is expanding its Longcross Park campus in Surrey to support AI cloud provider Nebius. The company has committed £807 million ($1bn) to the site, where Nebius will lease the entire existing facility. Expansion plans include vertical upgrades to current buildings, a new 36MW...

Read more
Read Viasat launches new headquarters in London
Viasat launches new headquarters in London

Viasat launches new headquarters in London

April 15, 2024 London

Satellite firm Viasat last week officially launched its new office, at 50 Finsbury Square in London, as the combined offices of both Viasat and Inmarsat, the rival vendor it acquired last year. The new 121,000 square feet site includes new satellite, network, and cyber operations centers for the...

Read more
Read Oriole Networks raises £10 million in seed funding
Oriole Networks raises £10 million in seed funding

Oriole Networks raises £10 million in seed funding

March 29, 2024 London

University College London (UCL) spinout Oriole Networks has raised £10 million ($12.6m) in a seed funding round co-led by UCL Technology Fund, Clean Growth Fund, XTX Ventures, and Dorilton Ventures, with support from Innovate UK Investor Partnership. “As the demand for compute continues to...

Read more
Read Segro to develop new data centers after £900 million share issue
Segro to develop new data centers after £900 million share issue

Segro to develop new data centers after £900 million share issue

February 29, 2024 London

Property investor Segro has raised £900 million ($1.1 billion) in a share issue and intends to use this funds to develop its portfolio across the UK and Europe. The London-listed business had initially been hoping to raise £800 million ($1.01bn), but on Tuesday evening its directors said strong...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?