Nabiax: Alcalá de Henares

Av. Punto Com

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.

Telefónica's data center opened late in 2012. and Built out in five phases, with a total of 23 server IT rooms. The first phase entails the design and construction of a 24,700 square meter building containing seven server rooms each measuring 680 square meters. The project was built to meet the Uptime Institute's Tier IV standard.

The server rooms are cooled using Free Cooling technology, which uses external ambient air when the temperature is lower than inside the room; this greatly reduces power consumption and will enable the center to attain a PUE of 1.3.

ADC1 Features


  • Start of operations: 2013
  • IT Rooms: 7
  • Surface: 4.800 m2
  • Generators’ topology: 2N
  • Cooling systems: Chiller 2N / AHUs N+2
  • Fiber entries: 3

Map and Nearby Locations:

Av. Punto Com
Click Map to begin Search

Sites within 15 miles of Nabiax: Alcalá de Henares

Show SqM
Distance Site About
0.09 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
0.36 miles Adam MAD Alcala
9.30 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
12.01 miles Microsoft: MAD01
13.06 miles IPCore Madrid
13.19 miles Verizon Nap of Madrid
13.19 miles Level3 Madrid
13.19 miles Global Switch Madrid
15.21 miles Microsoft: San Sebastian
Microsoft is constructing new data center in Madrid, Spain. The facility will be constructed in the San Sebastian de los Reyes area of Madrid and will aim for LEED Gold certification.
15.21 miles Cogent Madrid
15.70 miles Digital Realty: MAD2
15.72 miles Digital Realty: MAD1
15.89 miles Hispaweb Miguel Yuste
16.00 miles Digital Realty: MAD3
16.09 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
16.14 miles Digital Realty: MAD4
16.17 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
16.19 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
16.19 miles Equinix Madrid MD1
16.27 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
16.74 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
16.83 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
16.85 miles Equinix MD3x
16.91 miles Equinix MD6
17.16 miles AtlasEdge: Madrid MAD001
17.30 miles Produban Mesena 80
17.34 miles Equinix Madrid MD2
17.36 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
17.43 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
17.44 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
17.45 miles Ibercom Madrid
17.49 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
18.49 miles nLighten Madrid-Lezama
18.75 miles inAsset NixMad
19.69 miles BBVA CPD Tres Cantos

Nabiax: Alcalá de Henares Data Center Photos


Alcala CDG

Outside of Telefonica Alcala
The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Interxion's Data Centers in Madrid
Posted in Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Source: Silicon Alley Madrid

Operating Company

Nabiax, a data center provider, was created in 2019 when Asterion Industrial Partners acquired certain Telefonica data centres in Spain and Latin America.

In 2021, it bought two more Telefonica facilities on the Julián Camarillo campus

11 Facilities Owned
7 Markets Served
49.7 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
cdg-alcala-de-henares April 2019

PDF data sheet (in Spanish)