Atman: WAW-3 Bldg2

Latest Podcast Ożarowska 66B
Under Construction
New facility under construction
Operated by:

Atman: WAW-3 Bldg2

Short Code: Building 2
Year Planned: 2027

Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE.

WAW-3 Campus Features


  • Location: a 30-minute drive from downtown Warsaw; a walking distance from the Ozarow train station
  • IT floor space per building: 68,071 sq ft / 6,324 sq m (target: 204,213 sq ft / 18,972 sq m)
  • Gross space: 41,751m² (449,403 ft²)
  • Fit-out: turnkey & built-to-suit
  • Floor load: 2,400 kN/m² (50,125 lb/ft²)
  • Power density: up to 50 kW per rack
  • 43 diesel gensets
  • 99.999% SLA for power, guaranteed power supply system with 2N redundancy
  • Highly effective CRACs with N+2 redundancy
  • Carrier neutrality, redundant links, express routes to global clouds, IX access node

Certifications planned for 2025:


  • ISO 9001:2015 for quality management
  • ISO/IEC 27001:2013 for information security management
  • EPI DCOS:2021 level 4 for data center operations, procedures and maintenance
  • European Code of Conduct for Energy Efficiency in Data Centre participant and endorser
  • SOC 1, SOC 2, PCI DSS
  • Tier III+ standard requirements compliant

Map and Nearby Locations

Ożarowska 66B
Atman Sites
Nearby Facilities

Atman: WAW-3 Bldg2 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Atman: WAW-3 Bldg2

Distance Site About
0.09 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
0.10 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
0.17 miles OVH Warsaw WAW1
1.04 miles Switch Datacenters: Warsaw 1
1.84 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
1.89 miles Data4: Warsaw 1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
1.92 miles Data4: Warsaw 1 DC3
1.93 miles Hyperscale Data Center Request Dataset
1.94 miles Data4: Warsaw 1 DC4
3.29 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
3.33 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
3.34 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
3.34 miles Hillwood: Reguły Campus
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
3.37 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
3.41 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
3.46 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
4.11 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
4.95 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
5.56 miles Equinix: WA4x
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
5.65 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
6.73 miles Hyperscale Data Center Request Dataset
6.79 miles Hyperscale Data Center Request Dataset
6.92 miles Hyperscale Data Center Request Dataset
Microsoft launched Polish Azure region in 2023.
7.79 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
7.79 miles Vantage: WAW13
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
7.80 miles Vantage Warsaw WAW1
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
8.22 miles Atman: Warsaw-2
8.26 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
8.48 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
8.48 miles LIM Warsaw
8.74 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
9.01 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
9.08 miles Netia WARSC001
9.39 miles Netia Warszawa WARSC006
9.50 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
11.08 miles 3S Warszawa, Annopol
11.83 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
12.15 miles T-Mobile Warszawa-Piasecznie
12.96 miles Hyperscale Data Center Request Dataset
13.29 miles Aruba Poland PL1
13.30 miles Atman: Warsaw-1
17.72 miles DL Invest: Teresin, Poland
A highly resilient data infrastructure asset located in Teresin, Poland, positioned on a flood-free terrain near Warsaw to serve as a high-density regional cloud hub and specialized disaster recovery site.

Atman: WAW-3 Bldg2 Data Center Photos See all

Rendering of Atman Warsaw-3 Campus in Poland
Source: Atman

Operating Company

Operated by:
5
Facilities
1
Markets
87MW
Megawatts

News See all

Read Atman announces offsetting efforts
Atman announces offsetting efforts

Atman announces offsetting efforts

January 18, 2023 Atman

Recently data center firm Atman outlined that from January 1st, its entire facility footprint’s energy use would be offset with renewable energy via guarantees of origin from energy firm RES. The Polish firm outlined that this includes: Equipment of colocation customers, Its farm of 3,000...

Read more
Read Atman To Develop a 43MW Campus in Warsaw, Poland
Atman To Develop a 43MW Campus in Warsaw, Poland

Atman To Develop a 43MW Campus in Warsaw, Poland

December 16, 2022 Atman

Atman has announced its plan for a third data center campus in Warsaw. The Polish data center company bought a 5.5-hectare land in Duchnice to the west of Warsaw to develop the new facility. The Atman Data Center Warsaw-3 data center campus will feature three buildings with a total of 36 data...

Read more
Read Atman expands its Warsaw campus
Atman expands its Warsaw campus

Atman expands its Warsaw campus

September 06, 2022 Atman

Atman, a Polish data center operator, has announced that it is expanding one of its campuses in Warsaw. This expansion will take place at its Warsaw-1 campus at 21a Grochowska Street, with the addition of the F7 building. Atman F7 will reportedly offer 7.2MW of capacity across 2,916 sqm (31,390...

Read more
Read Korbank's Data Center Development in Warsaw Delayed Due To Specification Change
Baxtel

Korbank's Data Center Development in Warsaw Delayed Due To Specification Change

March 18, 2022 Warsaw

Polish telecommunications company, Korbank has revealed that it won’t be completing the construction of its Wroclaw data center till later. The data center was scheduled to be completed this month, but the date has been shifted to June of this year. The delay is happening because Korbank wants to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?