Netia Warszawa WARSC006

Latest Podcast Poleczki 13
Operational
Fully operational facility
Operated by:

Netia Warszawa WARSC006

Map and Nearby Locations

Poleczki 13
Netia S.A. Sites
Nearby Facilities

Sites within 15 miles of Netia Warszawa WARSC006

Distance Site About
0.42 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
2.28 miles Atman: Warsaw-2
3.93 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
4.09 miles Equinix: WA4x
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
4.61 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
4.84 miles Netia WARSC001
5.09 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
5.14 miles LIM Warsaw
5.14 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
5.18 miles T-Mobile Warszawa-Piasecznie
6.02 miles East RidgeInterested in this information?Contact us
6.04 miles Valley OneInterested in this information?Contact us
6.06 miles GammaInterested in this information?Contact us
Microsoft launched Polish Azure region in 2023.
6.12 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
6.24 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
6.32 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
6.32 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
6.33 miles Hillwood: Reguły Campus
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
6.36 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
6.38 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
7.27 miles Atman: Warsaw-1
7.27 miles Aruba Poland PL1
7.86 miles Data4: Warsaw 1 DC3
7.87 miles Data4: Warsaw 1 DC4
7.92 miles Data4: Warsaw 1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
7.94 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
7.98 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
8.10 miles North PointInterested in this information?Contact us
8.23 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
8.53 miles Switch Datacenters: Warsaw 1
9.36 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
9.39 miles Atman: WAW-3 Bldg2
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
9.40 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
9.43 miles OVH Warsaw WAW1
9.63 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
10.09 miles 3S Warszawa, Annopol
10.32 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
10.36 miles Vantage: WAW13
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
10.40 miles Vantage Warsaw WAW1
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
11.19 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
16.03 miles Station OneInterested in this information?Contact us

Netia Warszawa WARSC006 Data Center Photos See all

Netia Warsaw
Source: Baxtel

Operating Company

Operated by:
2
Facilities
2
Markets

News See all

Read Korbank's Data Center Development in Warsaw Delayed Due To Specification Change
Baxtel

Korbank's Data Center Development in Warsaw Delayed Due To Specification Change

March 18, 2022 Warsaw

Polish telecommunications company, Korbank has revealed that it won’t be completing the construction of its Wroclaw data center till later. The data center was scheduled to be completed this month, but the date has been shifted to June of this year. The delay is happening because Korbank wants to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?