Sien Real: Piaseczno Józefosław

Latest Podcast Energetyczna
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned

Sien Real: Piaseczno Józefosław

Site planned for 2028 and has expansions through 2029
Lot Size: 11 acres

Real estate developer Sien Real is planning to construct a major data center campus outside Warsaw, Poland, designed to span roughly 45,000 square meters across four facilities.

The proposal has generated pushback from nearby residents, who have organized protests over potential strains on local utility networks, particularly regarding municipal water pressure and noise. In response to community concerns, the developer has highlighted planned mitigation measures, including low-noise engineering, high-efficiency equipment, and on-site rainwater retention systems intended to limit the development's impact on public infrastructure.

Map and Nearby Locations

Energetyczna
Sien Real Sp. z o. o. Sites
Nearby Facilities

Sien Real: Piaseczno Józefosław Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Sien Real: Piaseczno Józefosław

Distance Site About
1.27 miles T-Mobile Warszawa-Piasecznie
4.46 miles Netia Warszawa WARSC006
4.54 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
6.50 miles PrimeInterested in this information?Contact us
Microsoft launched Polish Azure region in 2023.
6.56 miles Plaza ThreeInterested in this information?Contact us
6.60 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
6.61 miles Plaza PlusInterested in this information?Contact us
6.73 miles Atman: Warsaw-2
7.78 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
7.97 miles Equinix: WA4x
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
8.33 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
8.89 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
8.92 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
9.01 miles Hillwood: Reguły Campus
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
9.02 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
9.06 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
9.24 miles Netia WARSC001
9.55 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
9.58 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
9.58 miles LIM Warsaw
9.77 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
9.91 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
9.95 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
9.96 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
10.80 miles Atman: Warsaw-1
10.80 miles Aruba Poland PL1
11.26 miles Data4: Warsaw 1 DC3
11.27 miles Data4: Warsaw 1 DC4
11.31 miles Data4: Warsaw 1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
11.37 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
11.54 miles Core PlazaInterested in this information?Contact us
11.71 miles Switch Datacenters: Warsaw 1
12.29 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
12.35 miles Atman: WAW-3 Bldg2
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
12.38 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
12.44 miles OVH Warsaw WAW1
14.49 miles 3S Warszawa, Annopol
14.71 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
14.75 miles Vantage: WAW13
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
14.79 miles Vantage Warsaw WAW1
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
14.95 miles Edge CampusInterested in this information?Contact us
15.58 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.

Operating Company

Sien Real is a Budimex–Ferrovial venture developing a staged data-center campus on ul. Energetyczna in Piaseczno, on the former Unitra-Polkolor site.

0
Facilities
0
Markets

News See all

Read Korbank's Data Center Development in Warsaw Delayed Due To Specification Change
Baxtel

Korbank's Data Center Development in Warsaw Delayed Due To Specification Change

March 18, 2022 Warsaw

Polish telecommunications company, Korbank has revealed that it won’t be completing the construction of its Wroclaw data center till later. The data center was scheduled to be completed this month, but the date has been shifted to June of this year. The delay is happening because Korbank wants to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?