Equinix Begins Construction on DB7x Data Center in Dublin
March 30, 2026
Equinix
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
▪ ISO 22301
▪ ISO 27001
▪ ISO 9001
▪ PCI DSS
▪ SOC 1 Type II
▪ SOC 2 Type II
▪ ISO 14001
▪ ISO 45001
▪ ISO 50001
| Distance | Site | About |
|---|---|---|
| 0.42 miles | Netia Warszawa WARSC006 | |
| 2.21 miles | Atman: Warsaw-2 |
|
| 3.61 miles | EdgeConnex: Warsaw 2 |
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
|
| 3.77 miles | Equinix: WA4x |
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
|
| 4.27 miles | Equinix WA3 |
The Warsaw WA3 data center is located in the Salomea District of Poland.
|
| 4.89 miles | Netia WARSC001 | |
| 5.07 miles | EdgeConnex Warsaw |
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
|
| 5.13 miles | Equinix Warsaw WA1 |
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
| 5.13 miles | LIM Warsaw | |
| 5.17 miles | T-Mobile Warszawa-Piasecznie | |
| 5.64 miles | Hyperscale Data Center Request Dataset | |
| 5.66 miles | Hyperscale Data Center Request Dataset | |
| 5.68 miles | Hyperscale Data Center Request Dataset |
Microsoft launched Polish Azure region in 2023.
|
| 5.72 miles | Hillwood: Reguły 2 |
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
| 5.84 miles | Hillwood: Reguły 4 |
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
| 5.92 miles | Hillwood: Reguły 3 |
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
| 5.92 miles | Hillwood: Reguły Campus |
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
|
| 5.98 miles | Greykite: Warsaw |
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
|
| 6.02 miles | EdgeConneX: Warsaw 4 |
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
|
| 6.03 miles | EdgeConnex: Warsaw 3 |
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
|
| 7.51 miles | Data4: Warsaw 1 DC3 |
|
| 7.52 miles | Data4: Warsaw 1 DC4 |
|
| 7.53 miles | Atman: Warsaw-1 |
|
| 7.53 miles | Aruba Poland PL1 |
|
| 7.56 miles | Data4: Warsaw 1 |
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
|
| 7.63 miles | Data4: Warsaw 1 DC2 |
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
|
| 7.64 miles | Orange: Warsaw |
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
|
| 7.75 miles | Hyperscale Data Center Request Dataset | |
| 8.16 miles | Switch Datacenters: Warsaw 1 |
|
| 8.98 miles | Atman: Warsaw-3 Campus |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 9.01 miles | Atman: WAW-3 Bldg2 |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 9.02 miles | Atman: WAW-3 Bldg3 |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 9.05 miles | OVH Warsaw WAW1 | |
| 9.28 miles | FR Investment: Kajetany |
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
|
| 10.12 miles | 3S Warszawa, Annopol | |
| 10.18 miles | Vantage: WAW12 |
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
| 10.26 miles | Vantage Warsaw WAW1 |
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
| 11.22 miles | T-Mobile Warszawa-Szlachecka |
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
|
| 15.67 miles | Hyperscale Data Center Request Dataset |
March 30, 2026
Equinix
January 29, 2026
Equinix
January 26, 2026
Equinix
December 19, 2025
Equinix
December 06, 2025
Equinix
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas