Aruba announces launch date for delayed Rome data center
July 22, 2022
Aruba S.p.A.
The data center has two independent power generators with enough fuel storage to supply the whole data center with energy power at full capacity for 48 hours. These generators guarantee the running of the data center beyond the duration of the UPS system batteries.
The air-conditioning system for the data rooms and technological systems is made up of multiple redundant modules.
The data center is equipped with a flood detection, automatic fire detection and fire extinguishing system, which is harmless to humans and IT systems. The site is also installed with a security perimeter system with CCTV video surveillance, 24/7 active security and access control using security passes.
There is also a CCTV system monitoring the whole facility.
The data center is monitored by a technical team 24 hours a day, 365 days a year, and through remote management by staff at the Aruba NOC.
The data center has been awarded ISO 9001:2008 and ISO 27001:2013 certifications
| Distance | Site | About |
|---|---|---|
| 0.01 miles | Atman: Warsaw-1 |
|
| 4.22 miles | Netia WARSC001 | |
| 4.82 miles | LIM Warsaw | |
| 4.82 miles | Equinix Warsaw WA1 |
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
| 5.04 miles | EdgeConnex Warsaw |
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
|
| 5.99 miles | 3S Warszawa, Annopol | |
| 6.14 miles | Atman: Warsaw-2 |
|
| 6.77 miles | T-Mobile Warszawa-Szlachecka |
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
|
| 7.27 miles | Netia Warszawa WARSC006 | |
| 7.53 miles | Equinix Warsaw WA2 |
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
| 8.31 miles | Equinix: WA4x |
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
|
| 8.34 miles | EdgeConnex: Warsaw 2 |
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
|
| 8.86 miles | Equinix WA3 |
The Warsaw WA3 data center is located in the Salomea District of Poland.
|
| 9.05 miles | Vantage: WAW12 |
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
| 9.13 miles | Vantage Warsaw WAW1 |
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
| 9.97 miles | Greykite: Warsaw |
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
|
| 10.00 miles | EdgeConneX: Warsaw 4 |
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
|
| 10.04 miles | EdgeConnex: Warsaw 3 |
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
|
| 11.24 miles | Hillwood: Reguły 2 |
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
| 11.31 miles | Hillwood: Reguły 4 |
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
| 11.36 miles | Data4: Warsaw 1 DC4 |
|
| 11.37 miles | Data4: Warsaw 1 DC3 |
|
| 11.41 miles | Data4: Warsaw 1 |
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
|
| 11.41 miles | Hyperscale Data Center Request Dataset | |
| 11.42 miles | Hillwood: Reguły 3 |
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
| 11.46 miles | Data4: Warsaw 1 DC2 |
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
|
| 11.48 miles | Hillwood: Reguły Campus |
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
|
| 11.90 miles | T-Mobile Warszawa-Piasecznie | |
| 12.25 miles | Switch Datacenters: Warsaw 1 |
|
| 12.88 miles | Hyperscale Data Center Request Dataset | |
| 12.89 miles | Hyperscale Data Center Request Dataset | |
| 12.95 miles | Hyperscale Data Center Request Dataset |
Microsoft launched Polish Azure region in 2023.
|
| 13.24 miles | OVH Warsaw WAW1 | |
| 13.25 miles | Atman: WAW-3 Bldg3 |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 13.29 miles | Atman: WAW-3 Bldg2 |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 13.32 miles | Atman: Warsaw-3 Campus |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 15.16 miles | Orange: Warsaw |
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
|
| 16.65 miles | FR Investment: Kajetany |
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
|
Aruba S.p.A., founded in 1994, is the largest Web service company in Italy. Aruba offers 4 main services: Hosting and Domains, e-Security, Cloud and Data Center services. The company is also active within major European markets such as the French, UK and German market, and claims leadership in the Czech Republic and Slovakia and a consolidated presence in Poland and Hungary.
Aruba manages over 2.1 million domains, over 7.4 million email accounts, over 4.1 million PEC accounts, 31.000 servers and a total of over 4.7 million customers. In addition, Arbua provides dedicated server, housing and colocation services, managed services, digital signature, digital preservation and smart cards. In 2011 the company began offering Cloud services. Aruba has extensive experience in managing data centers with a European network capable of hosting over 60.000 servers.
July 22, 2022
Aruba S.p.A.
March 18, 2022
Warsaw
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas