|
0.00 miles
|
Equinix Warsaw WA1
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
|
0.22 miles
|
EdgeConnex Warsaw
|
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
|
|
0.72 miles
|
Netia WARSC001
|
|
|
2.93 miles
|
Atman: Warsaw-2
|
|
|
3.88 miles
|
Equinix: WA4x
|
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
|
|
3.97 miles
|
EdgeConnex: Warsaw 2
|
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
|
|
4.33 miles
|
Equinix WA3
|
The Warsaw WA3 data center is located in the Salomea District of Poland.
|
|
4.82 miles
|
Aruba Poland PL1
|
|
|
4.83 miles
|
Atman: Warsaw-1
|
|
|
5.00 miles
|
3S Warszawa, Annopol
|
|
|
5.13 miles
|
Equinix Warsaw WA2
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
|
5.14 miles
|
Netia Warszawa WARSC006
|
|
|
5.19 miles
|
Greykite: Warsaw
|
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
|
|
5.22 miles
|
EdgeConneX: Warsaw 4
|
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
|
|
5.26 miles
|
EdgeConnex: Warsaw 3
|
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
|
|
5.63 miles
|
Vantage: WAW12
|
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
|
5.68 miles
|
Vantage: WAW13
|
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
|
|
5.72 miles
|
Vantage Warsaw WAW1
|
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
|
6.10 miles
|
T-Mobile Warszawa-Szlachecka
|
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
|
|
6.54 miles
|
Data4: Warsaw 1 DC4
|
|
|
6.56 miles
|
Data4: Warsaw 1 DC3
|
|
|
6.59 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
6.59 miles
|
Data4: Warsaw 1
|
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
|
|
6.64 miles
|
Data4: Warsaw 1 DC2
|
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
|
|
6.70 miles
|
Hillwood: Reguły 2
|
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
|
6.75 miles
|
Hillwood: Reguły 4
|
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
|
6.86 miles
|
Hillwood: Reguły 3
|
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
|
6.94 miles
|
Hillwood: Reguły Campus
|
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
|
|
7.43 miles
|
Switch Datacenters: Warsaw 1
|
|
|
8.43 miles
|
OVH Warsaw WAW1
|
|
|
8.43 miles
|
Atman: WAW-3 Bldg3
|
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
|
8.48 miles
|
Atman: WAW-3 Bldg2
|
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
|
8.51 miles
|
Atman: Warsaw-3 Campus
|
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
|
9.14 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
9.15 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
9.25 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft launched Polish Azure region in 2023.
|
|
9.68 miles
|
VOLT: Warsaw 1
|
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
|
|
10.30 miles
|
T-Mobile Warszawa-Piasecznie
|
|
|
11.89 miles
|
Orange: Warsaw
|
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
|
|
12.90 miles
|
FR Investment: Kajetany
|
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
|
|
18.97 miles
|
Hyperscale Data Center
Request Dataset
|
|