Netia: MIND Jawczyce

Operational
Fully operational facility
Operated by:

Netia: MIND Jawczyce

Year Built: 2021
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Netia, part of the Cyfrowy Polsat group, designed MIND from the ground up as its newest data center in the Warsaw area, in the municipality of Ożarów Mazowiecki. It has four server rooms with space for about 520 racks, plus office space, and meets the EN 50600 class 3 requirements. Press reports put the cost at PLN 70 million to 80 million.

Two independent lines from Warsaw supply the building, and the electrical design gives customers 2N power across three paths. One path uses a conventional battery UPS. The other two use diesel rotary UPS (DRUPS) units of 2,000 kW each, which store energy in a flywheel instead of batteries and start their 16-cylinder diesel engines within seconds of a grid fault. The facility runs on renewable electricity, uses inert-gas fire suppression, and has two diverse fiber routes. Cloud provider CloudFerro was the first customer, followed by financial and logistics firms. A second plot on the site is held for expansion.

Site History

  • June 21, 2021: Netia held the official opening. More than 40% of the space was already sold.
  • April 2021: Three weeks after launch, Netia reported 32% of the space sold, with CloudFerro as the first customer.
  • April 1, 2021: The data center entered service.
  • August 2020: Netia announced the facility, then under construction, with service planned for early 2021.

Map and Nearby Locations

Sadowa 5
Netia S.A. Sites
Nearby Facilities

Netia: MIND Jawczyce Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Netia: MIND Jawczyce

Distance Site About
0.06 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
0.09 miles Data4: Warsaw 1 DC1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
0.14 miles Data4: Warsaw 1 DC3
0.15 miles Data4: Warsaw 1 DC4
0.29 miles PointInterested in this information?Contact us
0.75 miles Switch Datacenters: Warsaw 1
1.67 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
1.69 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
1.73 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
1.74 miles OVH Warsaw WAW1
1.75 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
1.79 miles Atman: WAW-3 Bldg2
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
1.83 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
2.61 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
2.62 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
2.71 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
2.72 miles Hillwood: Reguły 1
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
3.41 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
3.99 miles Equinix: WA4x
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
4.11 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
4.67 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
6.47 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
6.47 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
6.48 miles Vantage: WAW13
WAW13 is the third planned data center on Vantage's Warsaw campus in the Bielany district.
6.50 miles Vantage: WAW11
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
6.51 miles Ridge OneInterested in this information?Contact us
6.56 miles BetaInterested in this information?Contact us
6.60 miles Atman: Warsaw-2
6.69 miles LIM Warsaw
6.69 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
6.70 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.30 miles Netia WARSC001
7.64 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
7.99 miles Netia Warszawa WARSC006
9.21 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
9.46 miles 3S Warszawa, Annopol
9.51 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
10.27 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
11.33 miles T-Mobile Warszawa-Piasecznie
11.36 miles Sien Real: Piaseczno Józefosław
Real estate developer Sien Real is planning to construct a major data center campus outside Warsaw, Poland, designed to span roughly 45,000 square meters across four facilities.
11.50 miles Aruba Poland PL1
11.51 miles Atman: Warsaw-1
14.08 miles CenterInterested in this information?Contact us
19.49 miles DL Invest: Teresin, Poland
A highly resilient data infrastructure asset located in Teresin, Poland, positioned on a flood-free terrain near Warsaw to serve as a high-density regional cloud hub and specialized disaster recovery site.

Operating Company

Operated by:

Netia S.A. is a subsidiary of Cyfrowy Polsat S.A. and part of the Polsat Plus Group. It was registered in Poland in 1990, became a joint-stock company in 1992, and has its head office at ul. Poleczki 13 in Warsaw. Netia sells through a B2B division that serves corporate customers, small and medium businesses, and other operators, and a B2C division that serves households and small offices. Its services include data transmission, internet access, voice, TV, mobile, colocation, data center and cloud services, and the lease of dark fiber and ducts.

Its subsidiaries include TK Telekom and the cloud computing platform Oktawave. Its data center portfolio includes the Netia Data Center Mind in Jawczyce near Warsaw, which has more than 1,000 square meters of server space in four rooms. In 2025, Netia reported revenue of PLN 1.43 billion and employed 1,672 full-time equivalents.

Netia S.A. History:

  • In 2021, Cyfrowy Polsat acquired the remaining Netia shares, and Netia's shares stopped trading on the Warsaw Stock Exchange at the end of that year.
  • In June 2021, Netia opened the Netia Data Center Mind in Jawczyce, less than 10 km from central Warsaw.
  • In October 2018, Cyfrowy Polsat raised its stake in Netia to 65.98 percent.
  • In May 2018, Cyfrowy Polsat took a 43.33 percent stake in Netia through a tender offer.
  • In 2011, Netia acquired Telefonia Dialog.
  • In 2008, Netia acquired the Polish operations of Tele2.
  • In July 2000, Netia listed its shares on the Warsaw Stock Exchange.
  • Founded in 1990 in Poland.
0
Facilities
0
Markets

News See all

Read Korbank's Data Center Development in Warsaw Delayed Due To Specification Change
Baxtel

Korbank's Data Center Development in Warsaw Delayed Due To Specification Change

March 18, 2022 Warsaw

Polish telecommunications company, Korbank has revealed that it won’t be completing the construction of its Wroclaw data center till later. The data center was scheduled to be completed this month, but the date has been shifted to June of this year. The delay is happening because Korbank wants to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.