Netia WARSC001

Latest Podcast Piękna 11
Operational
Fully operational facility
Operated by:

Netia WARSC001

Map and Nearby Locations

Piękna 11
Netia S.A. Sites
Nearby Facilities

Sites within 15 miles of Netia WARSC001

Distance Site About
0.72 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
0.72 miles LIM Warsaw
0.90 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
2.77 miles Atman: Warsaw-2
4.22 miles Equinix: WA4x
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
4.22 miles Aruba Poland PL1
4.23 miles Atman: Warsaw-1
4.29 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
4.73 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
4.84 miles Netia Warszawa WARSC006
4.89 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
5.26 miles 3S Warszawa, Annopol
5.75 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
5.78 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
5.82 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
6.28 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
6.32 miles Vantage: WAW13
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
6.35 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
6.37 miles Vantage Warsaw WAW1
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
7.12 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
7.15 miles Data4: Warsaw 1 DC4
7.16 miles Data4: Warsaw 1 DC3
7.18 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
7.20 miles Data4: Warsaw 1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
7.22 miles HubInterested in this information?Contact us
7.25 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
7.28 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
7.36 miles Hillwood: Reguły Campus
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
8.04 miles Switch Datacenters: Warsaw 1
9.04 miles OVH Warsaw WAW1
9.04 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
9.08 miles Atman: WAW-3 Bldg2
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
9.11 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
9.30 miles EdgeInterested in this information?Contact us
9.31 miles Prime RidgeInterested in this information?Contact us
9.40 miles East StationInterested in this information?Contact us
Microsoft launched Polish Azure region in 2023.
10.02 miles T-Mobile Warszawa-Piasecznie
10.06 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
11.95 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
13.08 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
19.24 miles BetaInterested in this information?Contact us

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Data Center Planned Near Warsaw, Poland, Sparks Local Protests
A data center planned for a Warsaw suburb has sparked concerns among local residents over its potential impact on water supplies. Developed by Sien Real, a joint venture between Budimex and Ferrovi...

Data Center Planned Near Warsaw, Poland, Sparks Local Protests

August 14, 2026 Poland

A data center planned for a Warsaw suburb has sparked concerns among local residents over its potential impact on water supplies. Developed by Sien Real, a joint venture between Budimex and Ferrovial, the project will include four buildings on a 45,305-square-meter site between Piaseczno and...

Read more
Read Citylink to Supply Data Center Waste Heat to Wrocław District Heating Network
Property developer Citylink has signed an LOI with a local power plant to supply waste heat from its 24MW Wrocław Stadion data center to Wrocław’s district heating network. The system would capture...

Citylink to Supply Data Center Waste Heat to Wrocław District Heating Network

August 07, 2026 Poland

Property developer Citylink has signed an LOI with a local power plant to supply waste heat from its 24MW Wrocław Stadion data center to Wrocław’s district heating network. The system would capture heat from the facility, which is still under construction, and feed it into the municipal network....

Read more
Read Polish Operator Emitel Acquires 2MW Data Center Outside Poland
Polish Operator Emitel Acquires 2MW Data Center Outside Poland

Polish Operator Emitel Acquires 2MW Data Center Outside Poland

May 26, 2026 Poland

Polish tower operator Emitel has acquired a 2MW data center located just outside Warsaw. The Cordiant-owned company is entering the data center market with plans to offer colocation, cloud computing, and data processing services. The facility is reportedly built to Tier III standards and has...

Read more
Read 260MW Data Center Planned for Konin, Poland
260MW Data Center Planned for Konin, Poland

260MW Data Center Planned for Konin, Poland

April 16, 2026 Poland

Property developer Central Energy Group (CGE) has announced plans for a 260MW AI data center in Konin, in central Poland. The facility is expected to cost €3 billion ($3.5 billion). CGE has secured the necessary power connection and environmental permits for the project, according to Konin...

Read more
Read Data4 Opens Second Data Center in Poland Near Warsaw
Data4 Opens Second Data Center in Poland Near Warsaw

Data4 Opens Second Data Center in Poland Near Warsaw

April 09, 2026 Poland

European data center firm Data4 has launched a new facility outside Warsaw, Poland. The company this week announced the inauguration of the second data center at its campus in Jawczyce, within the municipality of Ożarów Mazowiecki near Warsaw. Data4 commissioned the first building at the site in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?