Atman's Warsaw-3 (WAW-3) campus at Ożarowska 66B in Duchnice, west of Warsaw, is planned for three data center buildings. The first opened in 2025.
Atman bought almost 6 ha in Duchnice, in the Ożarów Mazowiecki commune, in January 2023 and began construction in October 2023. Each building takes two independent 20 MW power lines, with diesel generators for backup. The campus is a 30-minute drive from central Warsaw and within walking distance of the Ożarów Mazowiecki train station. A PLN 1.35 billion loan from six lenders finances the build.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Atman: WAW-3 Bldg1 | Atman |
Operational
|
░░░░ Request Dataset MW | — | 2025 |
| Atman: WAW-3 Bldg2 | Atman |
Planned
|
— | — | — |
| Atman: WAW-3 Bldg3 | Atman |
Planned
|
— | — | — |
Atman Sp. z o.o., formerly ATM S.A., is a Warsaw-based colocation and interconnection operator seated at Grochowska 21A. Global Compute Infrastructure funds have controlled it since January 2021, with Goldman Sachs Asset Management as co-investor. Global Compute Poland holds all of its shares, directly and through AAW III.
Atman runs the Warsaw-1 and Warsaw-2 interconnection hubs in Warsaw, the Warsaw-3 campus in Duchnice near Ożarów Mazowiecki, and Katowice-1 in Katowice. Its Warsaw sites host the THINX, EPIX and TPIX internet exchanges.