Equinix: WA4x

Year Built: 2024
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.

Space


  • Colocation Space: 63,235ft2 (5,875m2)
  • Building Type: Concrete foundations, pre-cast reinforced concrete frame/columns with steel beams
  • Floor Type: Slab
  • Floor Load Capacity: 250.6 psf (12.0 kN/m2)

Power


  • Utility Feeders: 2N 15kV supplies. Stepped to 11kV
  • UPS Configuration: Block redundant
  • UPS Redundancy: N+1
  • Standby Power Configuration: MV Emergency Standby Power Generators direct coupled to each primary and redundant power string
  • Standby Power Redundancy: N+1

Certifications


▪ ISO 9001
▪ ISO 22301
▪ ISO 27001
▪ ISO 45001
▪ PCI DSS
▪ SOC 1 Type II (target Dec 2024)
▪ SOC 2 Type II (target Dec 2024)
▪ ISO 14001
▪ ISO 50001

Map and Nearby Locations

Krakowiaków 91/101
Equinix Sites
Nearby Facilities

Equinix: WA4x Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix: WA4x

Distance Site About
0.20 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
0.62 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
2.27 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
2.31 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
2.33 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
2.67 miles Atman: Warsaw-2
2.94 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
3.01 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
3.11 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
3.18 miles Hillwood: Reguły Campus
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
3.68 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
3.77 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
3.85 miles Data4: Warsaw 1 DC3
3.86 miles Data4: Warsaw 1 DC4
3.88 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
3.88 miles LIM Warsaw
3.90 miles Data4: Warsaw 1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
3.97 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
4.06 miles HubInterested in this information?Contact us
4.09 miles Netia Warszawa WARSC006
4.22 miles Netia WARSC001
4.60 miles Switch Datacenters: Warsaw 1
5.44 miles Point OneInterested in this information?Contact us
5.45 miles ValleyInterested in this information?Contact us
5.55 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
5.56 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
5.56 miles Atman: WAW-3 Bldg2
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
5.57 miles Global TowerInterested in this information?Contact us
Microsoft launched Polish Azure region in 2023.
5.57 miles OVH Warsaw WAW1
5.85 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
7.11 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
7.14 miles Vantage: WAW13
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
7.18 miles Vantage Warsaw WAW1
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
8.25 miles T-Mobile Warszawa-Piasecznie
8.31 miles Aruba Poland PL1
8.31 miles Atman: Warsaw-1
8.34 miles 3S Warszawa, Annopol
8.38 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
9.11 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
9.38 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
15.10 miles Campus ThreeInterested in this information?Contact us

Equinix: WA4x Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

318
Facilities
84
Markets
2093MW
Megawatts

News See all

Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read Equinix Begins Construction on DB7x Data Center in Dublin
Equinix Begins Construction on DB7x Data Center in Dublin

Equinix Begins Construction on DB7x Data Center in Dublin

March 30, 2026 Equinix

Equinix has begun construction on a new $92 million data center in Dublin, Ireland. The DB7x facility will be located in Blanchardstown, near the company’s existing sites in the city. Equinix is allocating $78 million toward high-performance infrastructure for AI workloads and $14 million for its...

Read more
Read EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape
EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

January 29, 2026 Equinix

EuroCTP, a new provider of an EU real-time pre and post-trade Consolidated Tape (CT) for financial equity trades, has selected Equinix's FR2 data center to host its 'tape' in Frankfurt, Germany.“Equinix FR2 provides EuroCTP with the ideal foundation to drive growth, ensuring we can reliably meet...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?