E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastThe Chiba AI data center campus, developed under a partnership between JERA, Dell Technologies, and Rhaelm, is a behind-the-meter AI infrastructure project planned at JERA’s Chiba Thermal Power Station.
It will deliver large-scale AI compute capacity using Dell’s standardized rack-scale infrastructure, powered directly by the adjacent 4.38 GW LNG-fired plant. Targeting operations around 2028 with an estimated total investment of $15 billion, the facility is designed as a model for sovereign AI infrastructure that can be replicated across other JERA sites, aiming for a multi-gigawatt footprint in Japan by the 2030s.
| Distance | Site | About |
|---|---|---|
| 14.99 miles | ADA: Tokyo East 2 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
| 15.20 miles | Japan Display: Mobara, Chiba |
Japan Display Inc. (JDI) plans to convert its Mobara Plant, a display manufacturing site located east of Tokyo in Mobara City, into an AI data center.
|
| 15.71 miles | NTT: Shiroi SHR1 |
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
|
| 16.06 miles | ADA: TKE1 Bldg1 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
|
| 16.09 miles | Carrier-Neutral Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 16.12 miles | Carrier-Neutral Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 16.16 miles | IIJ: Shiroi Bldg 1 |
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
|
| 16.17 miles | IIJ: Shiroi Bldg 2 |
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
|
| 16.21 miles | IIJ: Shiroi Bldg 3 |
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
|
| 16.26 miles | IIJ: Shiroi Bldg 4 |
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
|
| 16.47 miles | Colt: Inzai 5 |
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
|
| 16.57 miles | INAP Edogawa-ku | |
| 16.64 miles | North StationInterested in this information?Contact us | |
| 16.64 miles | SoftBank: Tokyo 4 |
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
|
| 16.67 miles | STACK: TKY01A |
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
|
| 16.67 miles | STACK: TKY01B |
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
|
| 16.73 miles | Equinix: TY13x |
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
|
| 16.77 miles | Equinix TY12x |
|
| 16.77 miles | Colt: Inzai 1 |
The Colt campus in Chiba was opened in 2011 and hosts three facilities
|
| 16.78 miles | MC Digital Realty (NRT12) |
NRT12 is designed to offer high-density power of up to 70kW per rack
|
| 16.80 miles | Colt: Inzai 2 |
This facility is a part of Colt's Inzai campus in Tokyo.
|
| 16.83 miles | Colt: Inzai 3 |
This facility is a part of Colt's Inzai campus in Tokyo.
|
| 16.85 miles | MC Digital Realty: NRT14 |
Digital Realty’s NRT14 is a 31MW data center at its Inzai campus near Tokyo, marking the third building in the development and bringing the site to ~104MW as an AI-optimized facility that became operational in April 2026.
|
| 16.88 miles | Colt: Inzai 4 |
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
|
| 16.96 miles | MC Digital Realty-Inazi (NRT10) |
|
| 17.09 miles | Hub GammaInterested in this information?Contact us | |
| 17.09 miles | Campus BetaInterested in this information?Contact us | |
| 17.14 miles | NTT TK2 | |
| 17.31 miles | NTT TK9 | |
| 17.32 miles | Goodman: Shirakami |
The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.
|
| 17.44 miles | AirTrunk: TOK1 DC7 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.52 miles | STT Tokyo 1 |
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
|
| 17.53 miles | AirTrunk: TOK1 DC3 |
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.53 miles | Flow Digital: TK8 |
This facility will be part of Flow Digital's Tokyo Data Center Campus.
|
| 17.54 miles | AirTrunk: TOK1 DC6 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.54 miles | AirTrunk: TOK1 DC5 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.58 miles | Flow Digital: Tokyo TK7 |
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
|
| 17.63 miles | STT Tokyo 2 |
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
|
| 17.64 miles | UltraInterested in this information?Contact us | |
| 17.66 miles | AirTrunk: TOK1 DC2 |
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.67 miles | AirTrunk Tokyo TOK1 |
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
|
| 17.67 miles | AirTrunk: TOK1 DC4 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.84 miles | INAP Koto-ku | |
| 17.87 miles | Colt Shiohama |
|
| 18.01 miles | Empyrion: Tokyo JP1 |
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
|
| 18.06 miles | Equinix Tokyo TY5 | |
| 18.09 miles | SKYY: Koto City |
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
|
| 18.14 miles | Equinix Tokyo TY3 | |
| 18.16 miles | SoftBank: Tokyo Ariake |
SoftBank data center in the Ariake Park Building in Tokyo Waterfront City, a district built for disaster resilience.
|
| 18.22 miles | ESR Group: Ariake |
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
|
| 18.34 miles | Carrier-Neutral Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 18.36 miles | Equinix Tokyo TY11 | |
| 18.53 miles | @Tokyo Chuo Center (CC1 & CC2) |
|
| 18.66 miles | Telecom Center Building | |
| 18.66 miles | TISI: Tokyo 1st DC |
TISI data center space in Toyosu, Koto Ward, Tokyo, marketed as Tokyo 1st DC.
|
| 19.28 miles | NTT TK4 | |
| 19.64 miles | NTT TK3 |
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast