OVHcloud Aims for Annual Revenue of €2bn
January 09, 2026
OVH Group
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity. It is also close to OVH’s point of presence and is directly connected to the company’s global network of data centres. It houses 40,000 servers as well as custom engineered components such as a water-cooling system.
| Distance | Site | About |
|---|---|---|
| 0.93 miles | Stratus: Belvedere |
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
|
| 3.83 miles | NTT London 1 (Dagenham) |
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
| 4.56 miles | Fujitsu: London East (SDC01) |
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
|
| 4.80 miles | Custodian Dartford DA2 | |
| 4.89 miles | Hyperscale Data Center Request Dataset |
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
|
| 5.79 miles | Six Degrees: Anchorage Point |
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
|
| 6.32 miles | ADA: LCY03 |
This building is the third facility in Ada Infrastructure's Docklands campus, East London.
|
| 6.44 miles | ADA: LCY02 |
This building is the second facility in Ada Infrastructure's Docklands campus, East London.
|
| 6.46 miles | Infinity Romford North and South |
|
| 6.48 miles | Green Mountain: London East Bldg 2 |
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
| 6.48 miles | ADA: East London Docklands |
The project's first phase includes a 64,245-square-meter (691,530 sq ft) data center building (LCY01) with a substation.
|
| 6.56 miles | Green Mountain: London East |
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
| 7.21 miles | Kao Data: Bidder Street, Newham |
The Bidder Street Data Center has received planning approval from local councilors in the Newham area of East London. The facility is expected to begin operations by 2027.
|
| 7.22 miles | IP House: London |
|
| 7.34 miles | Telehouse South |
Telehouse is expanding its Telehouse South facility in London, UK.
|
| 7.36 miles | Verizon London THW | |
| 7.37 miles | Telehouse London Docklands (North, East, West) |
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
| 7.39 miles | Global Switch: London East |
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
| 7.40 miles | GTT London GS2 |
|
| 7.42 miles | Netwise London East (NLE) |
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
| 7.44 miles | Digital Reef: East Havering Campus |
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
|
| 7.47 miles | Global Switch: London South |
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
| 7.48 miles | Global Switch: London North |
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
| 7.50 miles | Lumen London 3 (E India Dock) | |
| 7.61 miles | Digital Sovereign House (227 Marsh Wall) |
|
| 7.65 miles | Digital Meridian Gate (215 Marsh) |
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
|
| 7.75 miles | Equinix London LD8 Harbour Exchange (Docklands) |
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
| 7.76 miles | TeliaSonera HEX/A | |
| 7.76 miles | Wavenet: Harbour Exchange | |
| 7.90 miles | Digital Docklands: Cloud House | |
| 7.91 miles | City Reach London Docklands |
|
| 7.92 miles | Fibroptic: City Reach, Docklands |
Since its opening in 2011, this Tier 2 data centre has provided secure, high-performance colocation at City Reach, Isle of Dogs.
|
| 7.93 miles | Echelon LCY10 |
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
|
| 7.93 miles | Keppel GV7 London |
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
| 7.93 miles | Centersquare: Docklands LHR2 |
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
|
| 7.93 miles | DDCL: London |
London’s Docklands site provides approximately 23,160 sq. ft. of net technical space divided into two primary data halls with a combined capacity for over 320 cabinets.
|
| 7.95 miles | DRT London (Bonnington House) |
|
| 7.95 miles | nLighten: London Citi |
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
| 8.05 miles | AIMES DC3 Mastmaker Road | |
| 8.63 miles | Coreix Docklands | |
| 9.00 miles | Infinity SDC HereEast |
|
| 9.68 miles | AtlasEdge: London LCY001 |
|
| 9.68 miles | LeaseWeb: London LON-12 |
Leaseweb's LON-12 data center is a Tier III facility strategically located in the heart of London’s Docklands, offering approximately 3,700 m² (nearly 40,000 sq ft) of secure technical space.
|
| 10.17 miles | Netwise London Central |
Netwise has officially closed its "London Central" data center facility, which was a key part of their operations in London; the closure happened in June 2024,
|
| 10.35 miles | Stellanor: London East |
It was originally a Lumen (formerly Level 3) data center.
|
| 10.42 miles | Digital Realty: LON2 | |
| 10.42 miles | Internap London | |
| 10.46 miles | Six Degrees: London (Interxion LON3) | |
| 10.48 miles | Digital Realty: LON1 LON3 |
|
| 10.77 miles | Colt House London | |
| 10.90 miles | Stellanor: London City |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 10.91 miles | Telehouse London Metro |
|
| 10.97 miles | iomart DC2 London |
|
| 10.99 miles | Epsilon London Telephone House | |
| 11.08 miles | 1 Olivers Yard - Digital Realty |
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
| 11.67 miles | Verne: London EC1 |
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
|
| 11.69 miles | Lumen: 10 Fleet Pl | |
| 11.74 miles | Stellanor: London North |
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
|
| 11.86 miles | Lumen: Goswell Rd |
|
| 12.06 miles | Nscale: Loughton, Essex |
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
|
| 12.32 miles | aptum London | |
| 12.51 miles | Ark: Meridian Park | |
| 12.66 miles | Carrier-Neutral Data Center Request Dataset | |
| 12.66 miles | NTT: London LON2 |
NTT Data has acquired a 26.3-acre plot of land in London, UK, for its eighth data center in the market.
|
| 13.18 miles | Verizon London UK5 | |
| 13.50 miles | Zenium London One |
|
| 14.43 miles | ChunkyChips: Essex DC1 |
|
| 14.55 miles | Wavenet: Enfield |
Wavenet’s Enfield facility is not a stand-alone data centre – it is “Data Hall 4” inside the Virtus LONDON1 campus.
|
| 14.57 miles | VIRTUS London1 Enfield |
|
| 15.00 miles | CapitaLand: Croydon |
Croydon is a two-storey colocation data centre located 19 km south of Central London on the Prologis industrial estate.
|
| 15.00 miles | Visa United Kingdom | |
| 15.08 miles | DRT London (Croydon) | |
| 15.18 miles | European Liquidity Center (EULC) |
ICE Data Services’ state-of-the-art Tier 4 data center in Basildon, Essex, serves as a premier hub for colocation and supporting services.
|
| 15.24 miles | Coreix Enfield | |
| 15.56 miles | Pulsant: Croydon LN–1 |
|
| 15.69 miles | Hyperscale Data Center Request Dataset |
Epping Forest District Council has granted planning permission for Google’s new data center campus at North Weald Airfield, moving the project forward despite local objections.
|
| 16.11 miles | Caineal: Wickford |
The Caineal Wickford Data Center is a £1.3 billion high-performance artificial intelligence facility located on a 1.8-hectare site in Wickford, Essex, spearheaded by the London-based developer Caineal LLP.
|
| 16.84 miles | Hyperscale Data Center Request Dataset |
As part of a £5 billion two-year commitment to the UK, Google has opened a new data centre in Waltham Cross, Hertfordshire.
|
| 17.83 miles | iomart: DC12 North London |
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
|
| 18.19 miles | Pure DC: Brent Cross |
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
|
| 18.27 miles | Vantage London I Campus |
Vantage's LHR-1 data center spans 430,000 sq ft (40,000 sqm) across two multi-story data centers.
|
| 18.36 miles | Hyperscale Data Center Request Dataset |
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
| 18.38 miles | Colt Powergate |
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
| 18.38 miles | Equinix London LD9 Powergate |
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
| 18.51 miles | Vantage London II |
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
|
| 18.57 miles | Options West London | |
| 18.90 miles | Vision247: London |
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
|
| 18.98 miles | Segro Pure Premier Park |
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
|
| 19.04 miles | Equinix London LD3 | |
| 19.18 miles | ServerChoice: Harlow |
|
| 19.20 miles | Kao Data: Harlow KLON-01 |
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
| 19.22 miles | Ark: Alliance Park |
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
| 19.22 miles | Kao Data: KLON-08 |
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.22 miles | Kao Data: KLON-07 |
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.26 miles | Kao Data: KLON-03 |
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.26 miles | Kao Data: KLON-02 |
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.33 miles | Kao Data: KLON-04 |
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.88 miles | Exa: Hoddesdon |
|
January 09, 2026
OVH Group
November 20, 2025
OVH Group
October 21, 2025
OVH Group
October 28, 2024
OVH Group
May 30, 2024
OVH Group
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas