0.95 miles
|
European Liquidity Center (EULC)
|
ICE Data Services’ state-of-the-art Tier 4 data center in Basildon, Essex, serves as a premier hub for colocation and supporting services.
|
|
1.69 miles
|
ChunkyChips: Essex DC1
|
|
|
7.23 miles
|
DARE DC: St Cleres, Stanford-le-Hope
|
DARE DC proposes a 14 MW data center on a 3.9 ha greenfield site at St Cleres on Stanford Road, Stanford-le-Hope, in Thurrock, Essex, with a UK Power Networks connection targeted for 2030.
|
|
8.73 miles
|
Digital Reef: East Havering Campus
|
Digital Reef proposes a data center campus of up to 340,000 m2 on Green Belt land at Fen Lane near Upminster in the London Borough of Havering, with a 600 MVA grid connection from Warley substation. Havering Council consulted on a draft Local Development Order for the scheme in 2026.
|
|
10.42 miles
|
Statera: Thurrock Data Centre
|
Statera Energy proposes a data center campus of about 500 MW with battery storage and a 42 ha ecology park on farmland between Dock Road and Marshfoot Road at Tilbury in Thurrock, Essex, connected through its Thurrock power and storage site.
|
|
11.03 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
11.66 miles
|
Tritax: Blackwater BW1
|
Tritax Big Box is planning to develop a new hyperscale data center campus in Essex, located approximately 35 miles northeast of London.
|
|
11.74 miles
|
Tritax: Blackwater BW2
|
This facility is part of Tritax's Blackwater project in Chelmsford, UK.
|
|
11.86 miles
|
East StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.69 miles
|
Fujitsu: London East (SDC01)
|
Fujitsu's London East (SDC01) data center on Weston Avenue in West Thurrock, Essex, is one of the company's UK service data centers and is staffed around the clock.
|
|
14.23 miles
|
Clearstone Energy: Ebbsfleet Campus
|
Clearstone Energy proposes a 300 MW AI data center campus of four buildings on about 58.5 ha off New Barn Road near Southfleet, in the Borough of Dartford, Kent. The government directed in 2026 that the project be consented as a nationally significant infrastructure project.
|
|
14.33 miles
|
Custodian Dartford DA2
|
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
|
|
14.34 miles
|
Green Mountain: London East Bldg2
|
Green Mountain holds planning permission for a second London East building at 5 King George Close, Romford, with eight 2 MW data halls.
|
|
14.41 miles
|
Green Mountain: London East Bldg1
|
Green Mountain's LON1-East data centre in Romford, formerly Infinity SDC, completed a 14 MW expansion inside the existing building in September 2026.
|
|
14.47 miles
|
NTT London 1 (Dagenham)
|
NTT London 1 is a data center campus on Yew Tree Avenue in Dagenham, east London. At full build NTT plans 64 MW of critical IT load across 25,600 square meters.
|
|
16.11 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
|
16.26 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans two Tier III data centers on a brownfield site on Norman Road North in Belvedere, in the London Borough of Bexley, with private-wire power from the neighbouring Riverside energy-from-waste plant. Bexley approved the scheme in 2020.
|
|
17.11 miles
|
North CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.13 miles
|
Nscale: Loughton, Essex
|
Nscale plans an AI data centre on Langston Road, Loughton, with 50 MW of AI capacity. Microsoft withdrew as anchor tenant in October 2026 after the grid connection slipped into the 2030s.
|