The Caineal Wickford Data Center is a £1.3 billion high-performance artificial intelligence facility located on a 1.8-hectare site in Wickford, Essex, spearheaded by the London-based developer Caineal LLP. The project features a 27,000 m² multi-level structure designed by Arc:MC Architects, consisting of two floors of dedicated IT data halls and three floors of office space, supported by a specialized 4,500 m² on-site substation with underground high-voltage cabling to meet intense AI power demands.
To address environmental concerns, the facility will utilize an advanced closed-loop cooling system to recycle water and includes the creation of a 34.5-acre nature reserve extending the Nevendon Wetlands. The project is split into a £500 million construction phase and a £500 million+ hardware integration phase, with construction expected to begin in early 2026 and full operational status targeted for Summer 2028.
| Distance | Site | About |
|---|---|---|
| 0.95 miles | European Liquidity Center (EULC) |
ICE Data Services’ state-of-the-art Tier 4 data center in Basildon, Essex, serves as a premier hub for colocation and supporting services.
|
| 1.69 miles | ChunkyChips: Essex DC1 |
|
| 8.73 miles | Digital Reef: East Havering Campus |
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
|
| 11.86 miles | Hyperscale Data Center Request Dataset |
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
|
| 12.69 miles | Fujitsu: London East (SDC01) |
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
|
| 14.33 miles | Custodian Dartford DA2 | |
| 14.34 miles | Green Mountain: London East Bldg 2 |
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
| 14.41 miles | Green Mountain: London East |
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
| 14.41 miles | Infinity Romford North and South |
|
| 14.47 miles | NTT London 1 (Dagenham) |
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
| 16.11 miles | OVH London LON-1 |
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
| 16.26 miles | Stratus: Belvedere |
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
|
| 17.11 miles | Hyperscale Data Center Request Dataset |
Epping Forest District Council has granted planning permission for Google’s new data center campus at North Weald Airfield, moving the project forward despite local objections.
|
| 19.15 miles | Nscale: Loughton, Essex |
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
|
| 20.00 miles | Kao Data: KLON-08 |
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 20.00 miles | Kao Data: KLON-07 |
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
April 15, 2024
London
March 29, 2024
London
February 29, 2024
London
January 10, 2024
London
November 18, 2023
London
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas