0.77 miles
|
ChunkyChips: Essex DC1
|
|
|
0.95 miles
|
Caineal: Wickford
|
The Caineal Wickford Data Center is a £1.3 billion high-performance artificial intelligence facility located on a 1.8-hectare site in Wickford, Essex, spearheaded by the London-based developer Caineal LLP.
|
|
7.81 miles
|
Digital Reef: East Havering Campus
|
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
|
|
10.23 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
10.91 miles
|
West StationInterested in this information?Contact us
|
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
|
|
11.74 miles
|
Fujitsu: London East (SDC01)
|
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
|
|
12.26 miles
|
Tritax: Project Blackwater
|
Tritax Big Box is planning to develop a new hyperscale data center campus in Essex, located approximately 35 miles northeast of London.
|
|
12.34 miles
|
Tritax: Blackwater BW2
|
This facility is part of Tritax's Blackwater project in Chelmsford, UK.
|
|
13.38 miles
|
Clearstone Energy: Ebbsfleet Campus
|
UK developer Clearstone Energy has proposed the Ebbsfleet AI Data Centre Campus on 145 acres near Dartford, Kent.
|
|
13.40 miles
|
Custodian Dartford DA2
|
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
|
|
13.54 miles
|
Green Mountain: London East Bldg 2
|
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
|
13.59 miles
|
NTT London 1 (Dagenham)
|
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
|
13.61 miles
|
Infinity Romford North and South
|
|
|
13.61 miles
|
Green Mountain: London East
|
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
|
15.18 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
|
15.33 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
|
|
16.71 miles
|
West CenterInterested in this information?Contact us
|
Epping Forest District Council has granted planning permission for Google’s new data center campus at North Weald Airfield, moving the project forward despite local objections.
|
|
18.50 miles
|
Nscale: Loughton, Essex
|
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
|
|
19.70 miles
|
Kao Data: KLON-08
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.70 miles
|
Kao Data: KLON-07
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.78 miles
|
Kao Data: KLON-03
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.78 miles
|
Kao Data: Harlow KLON-01
|
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
|
19.78 miles
|
ServerChoice: Harlow
|
|
|
19.82 miles
|
Kao Data: KLON-02
|
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.83 miles
|
Kao Data: KLON-04
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|