3.25 miles
|
Statera: Thurrock Data Centre
|
Statera Energy proposes a data center campus of about 500 MW with battery storage and a 42 ha ecology park on farmland between Dock Road and Marshfoot Road at Tilbury in Thurrock, Essex, connected through its Thurrock power and storage site.
|
|
4.89 miles
|
Digital Reef: East Havering Campus
|
Digital Reef proposes a data center campus of up to 340,000 m2 on Green Belt land at Fen Lane near Upminster in the London Borough of Havering, with a 600 MVA grid connection from Warley substation. Havering Council consulted on a draft Local Development Order for the scheme in 2026.
|
|
5.60 miles
|
CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.87 miles
|
ChunkyChips: Essex DC1
|
|
|
6.19 miles
|
Fujitsu: London East (SDC01)
|
Fujitsu's London East (SDC01) data center on Weston Avenue in West Thurrock, Essex, is one of the company's UK service data centers and is staffed around the clock.
|
|
6.36 miles
|
European Liquidity Center (EULC)
|
ICE Data Services’ state-of-the-art Tier 4 data center in Basildon, Essex, serves as a premier hub for colocation and supporting services.
|
|
7.02 miles
|
Clearstone Energy: Ebbsfleet Campus
|
Clearstone Energy proposes a 300 MW AI data center campus of four buildings on about 58.5 ha off New Barn Road near Southfleet, in the Borough of Dartford, Kent. The government directed in 2026 that the project be consented as a nationally significant infrastructure project.
|
|
7.23 miles
|
Caineal: Wickford
|
Caineal: Wickford is a planned AI data centre on Nevendon Road, Wickford, Essex, developed by Caineal LLP with outline planning permission granted in November 2026.
|
|
7.45 miles
|
Custodian Dartford DA2
|
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
|
|
8.81 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
10.37 miles
|
NTT London 1 (Dagenham)
|
NTT London 1 is a data center campus on Yew Tree Avenue in Dagenham, east London. At full build NTT plans 64 MW of critical IT load across 25,600 square meters.
|
|
10.45 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
|
10.91 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans two Tier III data centers on a brownfield site on Norman Road North in Belvedere, in the London Borough of Bexley, with private-wire power from the neighbouring Riverside energy-from-waste plant. Bexley approved the scheme in 2020.
|
|
11.56 miles
|
Green Mountain: London East Bldg2
|
Green Mountain holds planning permission for a second London East building at 5 King George Close, Romford, with eight 2 MW data halls.
|
|
11.66 miles
|
Green Mountain: London East Bldg1
|
Green Mountain's LON1-East data centre in Romford, formerly Infinity SDC, completed a 14 MW expansion inside the existing building in September 2026.
|
|
16.22 miles
|
Six Degrees: Anchorage Point
|
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
|
|
16.64 miles
|
Nscale: Loughton, Essex
|
Nscale plans an AI data centre on Langston Road, Loughton, with 50 MW of AI capacity. Microsoft withdrew as anchor tenant in October 2026 after the grid connection slipped into the 2030s.
|
|
16.68 miles
|
ADA: LCY13
|
LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.
|
|
16.77 miles
|
ADA: LCY12
|
LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.
|
|
16.83 miles
|
ADA: LCY11
|
LCY11 is the first of three buildings on Ada Infrastructure's Docklands campus in West Silvertown: a seven-storey, 64,203 m2 data center facing the Thames, with ten data halls on floors 2 to 6. McLaren Construction broke ground in February 2026.
|
|
16.91 miles
|
Custodian Data Centres (Kent)
|
|
|
17.41 miles
|
L&G: Bidder Street, Newham
|
A consented hyperscale data center site on a former scrap yard in Bidder Street, Canning Town. Legal & General and Goldacre Ventures developed it with sineQN; Newham approved 80 MW of IT in December 2024, and the site was sold to an unnamed buyer in October 2026.
|
|
17.44 miles
|
Dare DC: Orpington, UK
|
Dare DC proposes a 50 MW data center campus on Green Belt farmland at Charmwood Farm, Charmwood Lane, near Orpington in the London Borough of Bromley. Bromley ruled in 2026 that the scheme needs an environmental impact assessment before an application is filed.
|
|
17.44 miles
|
IP House: London
|
|
|
17.58 miles
|
Netwise London East (NLE)
|
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
|
17.61 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
|
17.62 miles
|
Verizon London THW
|
|
|
17.65 miles
|
Telehouse West Two
|
Telehouse West Two is a nine-storey data centre under construction on Telehouse's Docklands campus in East London, built for high-density AI and colocation workloads.
|
|
17.67 miles
|
Telehouse South
|
Telehouse is expanding its Telehouse South facility in London, UK.
|
|
17.67 miles
|
Global Switch: London East
|
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
|
17.68 miles
|
EXA: London GS2
|
|
|
17.76 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
|
17.76 miles
|
Global Switch: London North
|
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
|
17.77 miles
|
Carrier-Neutral (Telco-Owned) Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.78 miles
|
Colt: London East India Dock
|
|
|
17.78 miles
|
Telehouse: Inventory Estate
|
|
|
18.01 miles
|
Digital Sovereign House (227 Marsh Wall)
|
Sovereign House (LHR20) is a Digital Realty carrier-neutral colocation data centre at 227 Marsh Wall in London Docklands, one of the area's most connected interconnection sites.
|
|
18.03 miles
|
Digital Meridian Gate (215 Marsh)
|
Former Digital Realty LHR21 data centre at 215 Marsh Wall in London Docklands, also known as Meridian Gate, Memaco House and Pennine House. Digital Realty closed the facility around 2022 to 2023.
|
|
18.08 miles
|
Cloud RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.15 miles
|
Arelion: London HEX/A
|
|
|
18.15 miles
|
Equinix London LD8 Harbour Exchange (Docklands)
|
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
|
18.15 miles
|
Wavenet: Harbour Exchange
|
|
|
18.28 miles
|
Tritax: Blackwater BW1
|
Tritax Big Box is planning to develop a new hyperscale data center campus in Essex, located approximately 35 miles northeast of London.
|
|
18.30 miles
|
Echelon LCY10
|
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
|
|
18.31 miles
|
nLighten: London Citi
|
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
|
18.31 miles
|
Digital Docklands: Cloud House
|
Cloud House is a Digital Realty colocation data centre at 1 Muirfield Crescent in London Docklands, opened in 2019 and sold with Cloud House West as LHR19.
|
|
18.35 miles
|
DRT London (Bonnington House)
|
Bonnington House, now Cloud House West, is a Digital Realty colocation data centre at 47 Millharbour in London Docklands, sold together with Cloud House as LHR19.
|
|
18.35 miles
|
Telstra: London Hosting Centre
|
Telstra's London Hosting Centre is a carrier-dense colocation facility in the City Reach building at Greenwich View Place on the Isle of Dogs, opened in 1999 as one of the first alternatives to Telehouse North.
|
|
18.36 miles
|
City Reach London Docklands
|
City Reach is Ogden Group's eight-floor building at Greenwich View Place on the Isle of Dogs, home to Telstra's London Hosting Centre and Docklands Data Centre.
|
|
18.36 miles
|
Tritax: Blackwater BW2
|
This facility is part of Tritax's Blackwater project in Chelmsford, UK.
|
|
18.36 miles
|
DDCL: London
|
London’s Docklands site provides approximately 23,160 sq. ft. of net technical space divided into two primary data halls with a combined capacity for over 320 cabinets.
|
|
18.37 miles
|
Centersquare: Docklands LHR2
|
Former Savvis, later Cyxtera, colocation site at 7 Greenwich View Place in London Docklands, inside Keppel's GV7 building. Centersquare closed LHR2 at the end of Q1 2026.
|
|
18.37 miles
|
Keppel GV7 London
|
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
|
18.46 miles
|
Cogent: London LON13
|
|
|
18.68 miles
|
Infinity SDC HereEast
|
Infinity SDC planned a large data center inside Here East, the former Olympic broadcast centre on the Queen Elizabeth Olympic Park. Infinity sold the space to the V&A in 2018 before the data center was completed, and it now forms part of V&A East.
|
|
18.99 miles
|
Coreix Docklands
|
|
|
19.10 miles
|
Sota: F25 Kent Science Park
|
Sota: F25 is Sota Solutions' first colocation data centre, in building F25 at Kent Science Park, Sittingbourne.
|
|
19.22 miles
|
Sota 810 kent Science Park
|
Sota 810 is a small colocation data centre run by Sota Solutions at Kent Science Park, Sittingbourne.
|