Lumen Minnetonka

5480 Feltl Road

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

The Facility was a previously TW Telecom site.

Power:


  • Power densities: 250 watts/sq. foot
    AC and DC power options available
  • Utility Capacity: 2 MW or 3000A (with initial phase)
  • Critical Power Capacity: Up to 1 MW of critical load
    capability, isolated 2N UPS configuration delivered
    through independent 1000 amp buses. All UPSs are
    double conversion units in 2N architecture providing
    separated and isolated A and B power paths to critical
    loads.
  • UPS Energy Storage: Battery energy storage system
  • Emergency Power: One 2MW Diesel Generator with
    stand-by generator connection for second generator

Certifications:


  • SSAE 16

Floor System and Floor Load


  • High-density floor: Raised floor 24 inches
  • Floor load: 300 lbs./sf uniform load, 1250 lbs. point load

Campus Details:


  • Campus: Single Story Building
  • Parking: 25+ stalls
  • Shipping: Street level loading dock
  • Access: Facility accessible to customers 24 x 7
  • Flood Plain: Outside 100-year flood plain
  • Seismic: Meets 1997 UBC Zone 1 standards
  • Nearest Airports: Minneapolis – St. Paul International
  • Storage: Secure storage room available for customer use
  • Customer temporary office space and conference room

Map and Nearby Locations:

5480 Feltl Road
Click Map to begin Search

Sites within 15 miles of Lumen Minnetonka

Show SqM
Distance Site About
1.96 miles EdgeConnex Minneapolis
2.01 miles OneNeck Eden Prairie
5.28 miles Consolidated Edina
5.28 miles Databank Minneapolis Edina MSP1
8.68 miles T5@Minneapolis
8.78 miles Level3 Minneapolis (222 South 9th)
8.84 miles Cyxtera Minneapolis MP2
9.11 miles XO: 1200 Washington
9.13 miles Cogent: 250 Marquette
9.15 miles XO: 250 Marquette
9.32 miles DataBank Minneapolis MSP4
9.32 miles Cologix MIN1, MIN2, and MIN3
Cologix's Minnesota's 3 data centers are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved MIN1 is the Building's MMR
9.32 miles Level3 Minneapolis (511 11th)
9.32 miles Lumen Minneapolis 2
9.33 miles 511 Building - Minnesota Technology Center
9.51 miles Flexential Minneapolis
12.40 miles UnitedHealth Chaska
12.44 miles CloudHQ: Chaska MN
The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.
12.49 miles US Bank Chaska (Stream DC2)
12.50 miles Stream Minneapolis
13.02 miles Unisys Eagan
14.15 miles H5 Minneapolis
14.21 miles DataBank Minneapolis Eagan MSP2
16.51 miles OneNeck Saint Paul
16.65 miles DataBank Brooklyn Park MSP3

Lumen Minnetonka Data Center Photos

Operating Company

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
281 Facilities Owned
121 Markets Served
93.8 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
minnetonka-mn-data-center September 2020

Minnetonka Data Sheet (PDF)