Iron Mountain DEN-1

Latest Podcast 4300 Brighton Boulevard
Operational
Fully operational facility
Operated by:

Iron Mountain DEN-1

Short Code: DEN-1
PUE: 2.2
Ownership: Iron Mountain does not own the real estate.
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Iron Mountain acquired the building from Fortrust in July 2017 for $130 million. (Source: PR)

Building:

» Tier III Certification of Constructed Facility from the Uptime Institute
» Modular “plug and play” infrastructure throughout the critical system’s design allows for expansion without interruption
» 50,000 square feet of operational raised-floor space and 65,000 square feet of data modules all on ground floor/slab
» Facility located outside the 100 and 500-year flood plains

Raised Floor and Data Modules:

» Cabinets, cages, and data modules ranging from 100 square feet and above
» 100 and 200kW @ 2N data modules
» Densities up to 35kW/rack in data modules
» Individual data module PUEs’ of <1.2

Power:

» 34 MW of data center infrastructure
» 2N (“A” & “B” side) electrical distribution to critical loads
» Multiple 1,000kVA and 750kVA uninterrupted power supply (UPS) systems in a 2N+1 configuration
» 2MW and 2.5MW generators in an N+1 configuration

HVAC:

» Closed-loop chilled water system; chillers, pumps, and computer room air handling units
» Dual path and bi-directional distribution
» 36 inch raised floor for optimum cooling
»High-density cooling in data modules >1000 watt/sq.ft. or 35kW/rack

Compliance:

» SSAE 16 Service Organization Control (“SOC”) 1 Type II
» SOC 2 Type II
» SOC 3 SysTrust Services Organization
» PCI/DSS (sections 9 &12)
» BBB A+ Accreditation
» HIPAA
» GLBA

Security:

» 7X24 on-site operations and customer support
» 7X24 on-site security guards
» Multiple layers and types of two-factor authentication and access control; including biometric, motion-sensor activated cameras and digital recording
» Additional off-site 3rd party security monitoring

Map and Nearby Locations

4300 Brighton Boulevard
Iron Mountain Sites
Nearby Facilities

Sites within 15 miles of Iron Mountain DEN-1

Distance Site
0.66 miles CoreSite: DE3 DC1
0.69 miles CoreSite: DE3 DC2
0.76 miles CoreSite: DE3 DC3
1.27 miles American Tower: Denver
2.32 miles Lumen Denver 1 (1850 North Pearl)
2.33 miles CoreSite DE2
2.36 miles Handy Networks Denver
2.60 miles Flexential Denver (Champa)
2.60 miles DataBank Denver DEN3
2.60 miles 1500 Champa
2.64 miles Massive Networks: Denver
2.64 miles CoreSite Denver DE1
2.65 miles Denver Gas & Electric Building (910 15th)
2.65 miles VLEC Denver
2.66 miles Lumen Denver 2 & 3
3.24 miles 501 Wazee
4.30 miles Lockheed Martin Denver
4.87 miles 11:11 Systems: Thornton
5.46 miles DataCanopy: Denver
8.88 miles Colorado Colo
9.49 miles DataBank Westminster DEN4
9.68 miles 12121 Grant Street
10.04 miles Ridge PrimeInterested in this information?Contact us
10.21 miles Lumen Denver 5
10.21 miles Flexential Aurora (Cornell)
10.21 miles 11900 E Cornell
10.41 miles TIAA: Broomfield
11.01 miles NLR HPC DC: Golden, CO
11.06 miles 365 Aurora, CO
11.73 miles American Tower Boulder
11.75 miles H5 Denver
13.05 miles Vantage: CO22
13.25 miles Vantage: CO21
13.27 miles Vantage: CO2 Expansion
13.54 miles Hyde: HighPoint Elevated
13.61 miles Charter Communications National Center West
13.90 miles QTS: DEN1-DC2
13.92 miles QTS: DEN1-DC3
14.01 miles Verizon: 9706 Easter
14.01 miles Aphorio Carter: Centennial, CO
14.02 miles Equinix Denver DE1
14.06 miles JP Morgan Aurora
14.12 miles Prime HubInterested in this information?Contact us
14.14 miles QTS: DEN1-DC1
14.17 miles Lumen Aurora 1
14.31 miles Flexential Denver (Arapahoe)
14.39 miles DataBank: Centennial (DEN2)
14.47 miles DataBank: Centennial (DEN5)
14.87 miles JP Morgan Broomfield
14.94 miles Comcast Centennial
15.12 miles Expedient Centennial
15.39 miles Massive Networks: CTC1
15.48 miles Visa Central US Denver
15.71 miles Verizon: 313 Inverness
15.71 miles DataBank Englewood (DEN1)
16.08 miles Centersquare: Denver DEN1
16.11 miles Equinix Denver DE2
16.53 miles TerraCom Direct Denver
16.57 miles EdgeConneX DEN02
16.60 miles Flexential Englewood
16.67 miles 8534 Concord - Digital Realty
16.67 miles Centersquare: Denver DEN2
16.71 miles US Signal Denver CO01
16.74 miles EdgeConneX Denver
17.09 miles Flexential: Parker, CO
18.16 miles Carrier-Neutral Data CenterInterested in this information?Contact us

Iron Mountain DEN-1 Data Center Photos See all

Electrical Room
Source: IRM
Cabling is done in the overhead trays
Source: IRM

Operating Company

Operated by:

Iron Mountain Data Centers is the data center business of Iron Mountain Incorporated and operates sites in the United States and Europe, with an India platform built through its partnership with Web Werks. In January 2018 it closed the acquisition of IO Data Centers, adding facilities in Phoenix and Scottsdale, Arizona, Edison, New Jersey, and Columbus, Ohio. In May 2018 it acquired EvoSwitch Netherlands, expanding into the Amsterdam market, and in 2019 it added capacity in Amsterdam and London. In India, Iron Mountain formed a joint venture with Web Werks in 2021 and in April 2025 it announced full ownership and a rebrand to Iron Mountain Data Centers India. Iron Mountain Incorporated was founded in 1951.

Iron Mountain Data Centers History:

  • In April 2025, acquired the remaining stake in Web Werks and rebranded the India business to Iron Mountain Data Centers.
  • 2021: Formed a joint venture with Web Werks to develop and operate data centers in India.
  • May 2018: Acquired EvoSwitch Netherlands, expanding into the Amsterdam market.
  • January 2018: Closed the acquisition of IO Data Centers’ U.S. operations.
  • 1951: Iron Mountain Incorporated was founded.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Vantage Drops 500MW Trident Data Center After Aurora Moratorium
Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov....

Vantage Drops 500MW Trident Data Center After Aurora Moratorium

November 25, 2026 Vantage Data Centers

Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov. 23 for Resolution R2026-146, which pauses new data center applications west and south of Interstate...

Read more
Read Colorado Regulators Allege QTS Built Aurora Data Centers Without Air Permits
Colorado's Air Pollution Control Division (APCD) alleges [QTS Data Centers](https://baxtel.com/data-centers/qts-data-centers) built new data centers at its Aurora campus without the required state ...

Colorado Regulators Allege QTS Built Aurora Data Centers Without Air Permits

November 11, 2026 QTS Data Centers

Colorado&#39;s Air Pollution Control Division (APCD) alleges QTS Data Centers built new data centers at its Aurora campus without the required state air permits. The October notice of violation, reported by CPR News on Nov. 10, covers the two buildings QTS is adding at 1160 North Gun Club Road in...

Read more
Read NV Energy Files Lawsuit Against Tract Over Nevada Data Center Costs
Nevada utility NV Energy has filed a lawsuit against Denver-based data center developer Tract, alleging the company failed to cover the costs of serving its facilities and instead shifted those exp...

NV Energy Files Lawsuit Against Tract Over Nevada Data Center Costs

August 04, 2026 Denver

Nevada utility NV Energy has filed a lawsuit against Denver-based data center developer Tract, alleging the company failed to cover the costs of serving its facilities and instead shifted those expenses to other utility customers across the state. “Most data center developers pursuing projects in...

Read more
Read Denver City Council Approves a One-year Moratorium on Data Centers
Denver City Council Approves a One-year Moratorium on Data Centers

Denver City Council Approves a One-year Moratorium on Data Centers

May 20, 2026 Denver

Denver City Council voted Monday to approve a one-year moratorium on new data center developments. The measure temporarily halts the acceptance, processing, and approval of zoning permits, site development plans, and amendment applications related to data centers. However, the moratorium excludes...

Read more
Read Iron Mountain Completes Structural Build of Chennai Data Center
Iron Mountain Completes Structural Build of Chennai Data Center

Iron Mountain Completes Structural Build of Chennai Data Center

April 13, 2026 Iron Mountain

Iron Mountain has topped out a new data center in Chennai, India.“We are thrilled to celebrate a recent major milestone in our global expansion: the official topping-out ceremony of our Chennai CHN-1 data center in Ambattur!” the company said on LinkedIn this week. “As the structural framework...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.