Equinix Denver DE2

Latest Podcast 335 Inverness Drive South
Operational
Fully operational facility
Operated by:

Equinix Denver DE2

Short Code: DE2
Year Built: 2021
░░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Equinix acquired DE2 in Englewood as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DEN1.

In 2018, the facility expanded by 475 cabinets.

Quick Facts:


Constructed in 2001
Construction Type: Slab on grade, concrete
Certifications: SSAE
Floor Loading: 250 lbs/SqFt
Raise Floor Height: 24"
Power Density: 120 Watts/SqFt

Map and Nearby Locations

335 Inverness Drive South
Equinix Sites
Nearby Facilities

Equinix Denver DE2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix Denver DE2

Distance Site About
0.42 miles Verizon: 313 Inverness
The site is a previous XO Communications facility
0.54 miles DataBank Englewood (DEN1)
0.97 miles TerraCom Direct Denver
TerraCom Direct's Denver Colorado site is located in the ViaWest Compark Data Center Complex.
1.02 miles Flexential Englewood
The Englewood site is also known as Flexential's Compark Data Center. Englewood is Flexential's largest site in Denver.
1.33 miles US Signal Denver CO01
The Denver One Neck data center was built in 2015 at a cost of $20 million. Phase I provides 35,000 Square Feet, but facility can be built out to 160,000 Square Feet over 5 phases.
1.43 miles 8534 Concord - Digital Realty
Digital Realty has leased out the building to Cyxtera's DN3 site.
1.43 miles Centersquare: Denver DEN2
1.64 miles Expedient Centennial
1.65 miles EdgeConneX Denver
Capable of 20+kW per cabinet Capable of 600+ watts per sq ft Real-time branch circuit monitoring
2.11 miles Flexential: Parker, CO
Flexential is building its fifth data center in Denver, in the southern district of Parker.
2.11 miles Equinix Denver DE1
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
2.12 miles DataBank Centennial II (DEN5)
2.12 miles Aphorio Carter: Centennial, CO
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
2.12 miles Verizon: 9706 Easter
2.18 miles DataBank Centennial (DEN2)
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
2.34 miles Comcast Centennial
2.45 miles Flexential Denver (Arapahoe)
2.67 miles Charter Communications National Center West
4.37 miles H5 Denver
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
6.97 miles Flexential Aurora (Cornell)
15,000 kVA UPS system capacity Redundant battery strings with monitoring Branch Circuit Monitoring
6.97 miles 11900 E Cornell
The Digital site is fully leased to Flexential
7.41 miles Visa Central US Denver
8.51 miles Lumen Denver 5
9.39 miles Centersquare: Denver DEN1
11.84 miles DataCanopy: Denver
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
13.89 miles Lumen Aurora 1
13.91 miles JP Morgan Aurora
14.19 miles QTS: Denver DC3
This facility is part of QTS' Denver Campus in Colorado.
14.27 miles QTS: Denver DC2
This facility is part of QTS' Denver Campus in Colorado.
14.30 miles CoreSite DE2
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
14.32 miles Lumen Denver 1 (1850 North Pearl)
14.41 miles QTS: Denver Campus
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
14.73 miles Handy Networks Denver
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
14.73 miles Flexential Denver (Champa)
14.73 miles DataBank Denver DEN3
14.73 miles 1500 Champa
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
14.75 miles VLEC Denver
14.75 miles Lumen Denver 2 & 3
14.75 miles CoreSite Denver DE1
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
14.75 miles RockyNet Denver
14.75 miles Denver Gas & Electric Building (910 15th)
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
14.84 miles 365 Aurora, CO
Purpose-built by SunGard Availability Services in 2001 as DEN-3431; 150,000 sqft single-tenant facility now in 365's portfolio.
15.16 miles 501 Wazee
900 kVA UPS system capacity Redundant battery strings Multiple redundant power distribution paths Branch Circuit Monitoring System
16.11 miles Iron Mountain DEN-1
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
16.56 miles CoreSite: DE3 DC2
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
16.57 miles CoreSite: Denver DE3
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
16.62 miles CoreSite: DE3 DC3
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
17.19 miles American Tower: Denver
17.32 miles Vantage: CO2 Expansion
17.32 miles Vantage: Colorado CO21
Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.
18.25 miles Colorado Colo
18.73 miles Point OneInterested in this information?Contact us
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
18.80 miles Hyde: HighPoint Elevated
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.

Equinix Denver DE2 Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

318
Facilities
84
Markets
2093MW
Megawatts

News See all

Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Denver City Council Approves a One-year Moratorium on Data Centers
Denver City Council Approves a One-year Moratorium on Data Centers

Denver City Council Approves a One-year Moratorium on Data Centers

May 20, 2026 Denver

Denver City Council voted Monday to approve a one-year moratorium on new data center developments. The measure temporarily halts the acceptance, processing, and approval of zoning permits, site development plans, and amendment applications related to data centers. However, the moratorium excludes...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read Equinix Begins Construction on DB7x Data Center in Dublin
Equinix Begins Construction on DB7x Data Center in Dublin

Equinix Begins Construction on DB7x Data Center in Dublin

March 30, 2026 Equinix

Equinix has begun construction on a new $92 million data center in Dublin, Ireland. The DB7x facility will be located in Blanchardstown, near the company’s existing sites in the city. Equinix is allocating $78 million toward high-performance infrastructure for AI workloads and $14 million for its...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?