Colorado Proposes Tax Breaks for Data Centers
January 27, 2026
Colorado (CO)
NLR's High-Performance Computing (HPC) Data Center, situated within the Energy Systems Integration Facility (ESIF), operates with an annualized average power usage effectiveness (PUE) of 1.036. The facility utilizes warm-water liquid cooling to manage thermal loads, eliminating the requirement for traditional mechanical or compressor-based cooling systems.
| Distance | Site | About |
|---|---|---|
| 2.75 miles | Colorado Colo | |
| 8.43 miles | 501 Wazee |
900 kVA UPS system capacity
Redundant battery strings
Multiple redundant power distribution paths
Branch Circuit Monitoring System
|
| 9.30 miles | CoreSite Denver DE1 |
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
|
| 9.30 miles | Denver Gas & Electric Building (910 15th) |
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
|
| 9.30 miles | VLEC Denver | |
| 9.30 miles | RockyNet Denver | |
| 9.30 miles | Lumen Denver 2 & 3 |
|
| 9.36 miles | 1500 Champa |
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
|
| 9.36 miles | DataBank Denver DEN3 |
|
| 9.36 miles | Flexential Denver (Champa) |
|
| 9.61 miles | Handy Networks Denver |
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
|
| 10.15 miles | Lumen Denver 1 (1850 North Pearl) | |
| 10.16 miles | CoreSite DE2 |
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
|
| 10.20 miles | DataCanopy: Denver |
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
|
| 10.20 miles | American Tower: Denver | |
| 10.85 miles | Lockheed Martin Denver | |
| 10.90 miles | DataBank Westminster DEN4 |
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.
|
| 11.01 miles | Iron Mountain DEN-1 |
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
|
| 11.43 miles | CoreSite: Denver DE3 |
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
|
| 11.49 miles | CoreSite: DE3 DC2 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 11.51 miles | CoreSite: DE3 DC3 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 12.35 miles | TIAA: Broomfield |
|
| 12.41 miles | American Tower Boulder | |
| 12.44 miles | 11:11 Systems: Thornton |
This facility has a long history, having previously operated under the Sungard Availability Services and iland brands before being integrated into the 11:11 Systems portfolio.
|
| 15.18 miles | Centersquare: Denver DEN1 |
|
| 15.51 miles | 12121 Grant Street |
|
| 15.55 miles | RockyNet Louisville | |
| 15.89 miles | Hyperscale Data Center Request Dataset | |
| 15.97 miles | Visa Central US Denver | |
| 17.16 miles | H5 Denver |
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
|
| 17.97 miles | 11900 E Cornell |
The Digital site is fully leased to Flexential
|
| 17.97 miles | Flexential Aurora (Cornell) |
15,000 kVA UPS system capacity
Redundant battery strings with monitoring
Branch Circuit Monitoring
|
| 18.75 miles | JP Morgan Broomfield |
|
| 18.96 miles | Lumen Denver 5 |
|
| 18.97 miles | Verizon: 9706 Easter | |
| 18.97 miles | Aphorio Carter: Centennial, CO |
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
|
| 18.99 miles | Equinix Denver DE1 |
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
|
| 19.28 miles | Charter Communications National Center West | |
| 19.51 miles | Earthnet Denver |
January 27, 2026
Colorado (CO)
August 01, 2024
Colorado (CO)
March 08, 2024
Colorado (CO)
April 18, 2023
Colorado (CO)
June 29, 2022
Colorado (CO)
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas