American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana
February 06, 2026
American Tower Corporation
| Distance | Site | About |
|---|---|---|
| 1.27 miles | Iron Mountain DEN-1 |
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
|
| 1.33 miles | CoreSite: Denver DE3 |
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
|
| 1.38 miles | CoreSite: DE3 DC3 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 1.39 miles | CoreSite: DE3 DC2 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 2.80 miles | Handy Networks Denver |
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
|
| 2.95 miles | Flexential Denver (Champa) |
|
| 2.95 miles | DataBank Denver DEN3 |
|
| 2.95 miles | 1500 Champa |
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
|
| 2.97 miles | VLEC Denver | |
| 2.97 miles | Lumen Denver 2 & 3 |
|
| 2.97 miles | RockyNet Denver | |
| 2.97 miles | Denver Gas & Electric Building (910 15th) |
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
|
| 2.97 miles | CoreSite Denver DE1 |
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
|
| 3.00 miles | Lumen Denver 1 (1850 North Pearl) | |
| 3.02 miles | CoreSite DE2 |
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
|
| 3.24 miles | Lockheed Martin Denver | |
| 3.25 miles | 501 Wazee |
900 kVA UPS system capacity
Redundant battery strings
Multiple redundant power distribution paths
Branch Circuit Monitoring System
|
| 4.12 miles | 11:11 Systems: Thornton |
This facility has a long history, having previously operated under the Sungard Availability Services and iland brands before being integrated into the 11:11 Systems portfolio.
|
| 6.10 miles | DataCanopy: Denver |
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
|
| 8.27 miles | Colorado Colo | |
| 8.28 miles | DataBank Westminster DEN4 |
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.
|
| 8.90 miles | 12121 Grant Street |
|
| 9.25 miles | TIAA: Broomfield |
|
| 9.28 miles | Hyperscale Data Center Request Dataset | |
| 10.20 miles | NLR HPC DC: Golden, CO |
NLR's High-Performance Computing (HPC) Data Center, situated within the Energy Systems Integration Facility (ESIF), operates with an annualized average power usage effectiveness (PUE) of 1.036.
|
| 10.53 miles | American Tower Boulder | |
| 11.44 miles | 11900 E Cornell |
The Digital site is fully leased to Flexential
|
| 11.44 miles | Flexential Aurora (Cornell) |
15,000 kVA UPS system capacity
Redundant battery strings with monitoring
Branch Circuit Monitoring
|
| 11.47 miles | Lumen Denver 5 |
|
| 12.18 miles | 365 Aurora, CO |
|
| 12.81 miles | H5 Denver |
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
|
| 13.98 miles | JP Morgan Broomfield |
|
| 14.06 miles | Vantage: CO2 Expansion | |
| 14.22 miles | RockyNet Louisville | |
| 14.22 miles | Vantage: Colorado CO21 |
Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.
|
| 14.47 miles | Hyde: HighPoint Elevated |
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.
|
| 14.73 miles | Charter Communications National Center West | |
| 15.08 miles | Hyperscale Data Center Request Dataset |
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
|
| 15.08 miles | Aphorio Carter: Centennial, CO |
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
|
| 15.08 miles | Verizon: 9706 Easter | |
| 15.08 miles | QTS: Denver DC2 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 15.08 miles | Equinix Denver DE1 |
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
|
| 15.10 miles | QTS: Denver DC3 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 15.25 miles | JP Morgan Aurora |
|
| 15.32 miles | QTS: Denver Campus |
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
|
| 15.37 miles | Lumen Aurora 1 | |
| 15.45 miles | Flexential Denver (Arapahoe) |
|
| 15.53 miles | DataBank Centennial (DEN2) |
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
|
| 15.60 miles | DataBank Centennial II (DEN5) |
|
| 16.09 miles | Comcast Centennial |
|
| 16.15 miles | Visa Central US Denver | |
| 16.25 miles | Expedient Centennial |
|
| 16.62 miles | Centersquare: Denver DEN1 |
|
| 16.77 miles | DataBank Englewood (DEN1) |
|
| 16.78 miles | Verizon: 313 Inverness |
The site is a previous XO Communications facility
|
| 17.19 miles | Equinix Denver DE2 |
Equinix acquired DE2 in Englewood as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DEN1.
|
| 17.64 miles | TerraCom Direct Denver |
TerraCom Direct's Denver Colorado site is located in the ViaWest Compark Data Center Complex.
|
| 17.70 miles | Flexential Englewood |
The Englewood site is also known as Flexential's Compark Data Center. Englewood is Flexential's largest site in Denver.
|
| 17.79 miles | Centersquare: Denver DEN2 |
|
| 17.79 miles | 8534 Concord - Digital Realty |
Digital Realty has leased out the building to Cyxtera's DN3 site.
|
| 17.83 miles | US Signal Denver CO01 |
The Denver One Neck data center was built in 2015 at a cost of $20 million. Phase I provides 35,000 Square Feet, but facility can be built out to 160,000 Square Feet over 5 phases.
|
| 17.88 miles | EdgeConneX Denver |
Capable of 20+kW per cabinet
Capable of 600+ watts per sq ft
Real-time branch circuit monitoring
|
| 18.23 miles | Flexential: Parker, CO |
Flexential is building its fifth data center in Denver, in the southern district of Parker.
|
| 19.17 miles | Carrier-Neutral Data Center Request Dataset |
American Tower Corporation (also referred to as American Tower or ATC) is an American publicly held company, owner and operator of wireless and broadcast communications infrastructure in several countries. American Tower is headquartered in Boston, Massachusetts and has local offices worldwide. The company was formed in 1995 as a unit of American Radio Systems, and was spun off from that company in 1998 when that company merged with CBS Corporation. Following the merger, American Tower began international expansion by establishing operations in Mexico in 1998 and Brazil in 1999. The company is structured as a real estate investment trust (REIT.) Source: Wikipedia
February 06, 2026
American Tower Corporation
May 23, 2025
American Tower Corporation
September 01, 2024
Denver
July 15, 2024
Denver
December 06, 2023
American Tower Corporation
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas