CoreSite seeks tax rebate for Denver data center
September 01, 2024
Denver
This facility has a long history, having previously operated under the Sungard Availability Services and iland brands before being integrated into the 11:11 Systems portfolio.
| Distance | Site | About |
|---|---|---|
| 1.59 miles | Lockheed Martin Denver | |
| 4.12 miles | American Tower: Denver | |
| 4.27 miles | CoreSite: DE3 DC3 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 4.33 miles | CoreSite: Denver DE3 |
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
|
| 4.34 miles | CoreSite: DE3 DC2 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 4.81 miles | 12121 Grant Street |
|
| 4.87 miles | Iron Mountain DEN-1 |
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
|
| 5.18 miles | Hyperscale Data Center Request Dataset | |
| 5.91 miles | DataBank Westminster DEN4 |
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.
|
| 6.33 miles | TIAA: Broomfield |
|
| 6.91 miles | Handy Networks Denver |
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
|
| 7.07 miles | Flexential Denver (Champa) |
|
| 7.07 miles | DataBank Denver DEN3 |
|
| 7.07 miles | 1500 Champa |
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
|
| 7.07 miles | Lumen Denver 1 (1850 North Pearl) | |
| 7.09 miles | CoreSite DE2 |
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
|
| 7.09 miles | RockyNet Denver | |
| 7.09 miles | Denver Gas & Electric Building (910 15th) |
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
|
| 7.09 miles | CoreSite Denver DE1 |
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
|
| 7.09 miles | VLEC Denver | |
| 7.09 miles | Lumen Denver 2 & 3 |
|
| 7.29 miles | 501 Wazee |
900 kVA UPS system capacity
Redundant battery strings
Multiple redundant power distribution paths
Branch Circuit Monitoring System
|
| 7.84 miles | American Tower Boulder | |
| 10.00 miles | JP Morgan Broomfield |
|
| 10.21 miles | DataCanopy: Denver |
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
|
| 11.17 miles | RockyNet Louisville | |
| 11.20 miles | Colorado Colo | |
| 12.44 miles | NLR HPC DC: Golden, CO |
NLR's High-Performance Computing (HPC) Data Center, situated within the Energy Systems Integration Facility (ESIF), operates with an annualized average power usage effectiveness (PUE) of 1.036.
|
| 13.04 miles | 365 Aurora, CO |
|
| 14.21 miles | Hyde: HighPoint Elevated |
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.
|
| 14.21 miles | Lumen Denver 5 |
|
| 14.22 miles | Vantage: CO2 Expansion | |
| 14.40 miles | Vantage: Colorado CO21 |
Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.
|
| 14.61 miles | Flexential Aurora (Cornell) |
15,000 kVA UPS system capacity
Redundant battery strings with monitoring
Branch Circuit Monitoring
|
| 14.61 miles | 11900 E Cornell |
The Digital site is fully leased to Flexential
|
| 14.91 miles | Hyperscale Data Center Request Dataset |
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
|
| 16.20 miles | QTS: Denver DC2 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 16.25 miles | QTS: Denver DC3 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 16.42 miles | QTS: Denver Campus |
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
|
| 16.48 miles | JP Morgan Aurora |
|
| 16.53 miles | H5 Denver |
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
|
| 16.60 miles | Lumen Aurora 1 | |
| 18.30 miles | Earthnet Denver | |
| 18.31 miles | Charter Communications National Center West | |
| 18.79 miles | Verizon: 9706 Easter | |
| 18.79 miles | Aphorio Carter: Centennial, CO |
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
|
| 18.79 miles | Equinix Denver DE1 |
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
|
| 18.95 miles | Flexential Denver (Arapahoe) |
|
| 19.06 miles | DataBank Centennial (DEN2) |
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
|
| 19.14 miles | DataBank Centennial II (DEN5) |
|
| 19.16 miles | Carrier-Neutral Data Center Request Dataset | |
| 19.55 miles | Comcast Centennial |
|
| 19.79 miles | Expedient Centennial |
|
September 01, 2024
Denver
July 15, 2024
Denver
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas