CoreSite seeks tax rebate for Denver data center
September 01, 2024
Denver
| Distance | Site | About |
|---|---|---|
| 1.59 miles | 11:11 Systems: Thornton |
This facility has a long history, having previously operated under the Sungard Availability Services and iland brands before being integrated into the 11:11 Systems portfolio.
|
| 3.24 miles | American Tower: Denver | |
| 3.89 miles | CoreSite: DE3 DC3 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 3.92 miles | CoreSite: Denver DE3 |
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
|
| 3.95 miles | CoreSite: DE3 DC2 |
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
|
| 4.30 miles | Iron Mountain DEN-1 |
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
|
| 5.38 miles | DataBank Westminster DEN4 |
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.
|
| 5.84 miles | 12121 Grant Street |
|
| 5.97 miles | Handy Networks Denver |
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
|
| 6.08 miles | 1500 Champa |
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
|
| 6.08 miles | Flexential Denver (Champa) |
|
| 6.08 miles | DataBank Denver DEN3 |
|
| 6.09 miles | CoreSite Denver DE1 |
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
|
| 6.09 miles | Denver Gas & Electric Building (910 15th) |
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
|
| 6.09 miles | VLEC Denver | |
| 6.09 miles | RockyNet Denver | |
| 6.09 miles | Lumen Denver 2 & 3 |
|
| 6.13 miles | 501 Wazee |
900 kVA UPS system capacity
Redundant battery strings
Multiple redundant power distribution paths
Branch Circuit Monitoring System
|
| 6.16 miles | TIAA: Broomfield |
|
| 6.23 miles | Lumen Denver 1 (1850 North Pearl) | |
| 6.24 miles | Hyperscale Data Center Request Dataset | |
| 6.25 miles | CoreSite DE2 |
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
|
| 7.55 miles | American Tower Boulder | |
| 9.27 miles | DataCanopy: Denver |
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
|
| 9.63 miles | Colorado Colo | |
| 10.77 miles | JP Morgan Broomfield |
|
| 10.85 miles | NLR HPC DC: Golden, CO |
NLR's High-Performance Computing (HPC) Data Center, situated within the Energy Systems Integration Facility (ESIF), operates with an annualized average power usage effectiveness (PUE) of 1.036.
|
| 11.13 miles | RockyNet Louisville | |
| 13.80 miles | 365 Aurora, CO |
|
| 14.26 miles | Lumen Denver 5 |
|
| 14.44 miles | Flexential Aurora (Cornell) |
15,000 kVA UPS system capacity
Redundant battery strings with monitoring
Branch Circuit Monitoring
|
| 14.44 miles | 11900 E Cornell |
The Digital site is fully leased to Flexential
|
| 15.21 miles | Vantage: CO2 Expansion | |
| 15.32 miles | Hyde: HighPoint Elevated |
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.
|
| 15.39 miles | Vantage: Colorado CO21 |
Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.
|
| 16.00 miles | Hyperscale Data Center Request Dataset |
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
|
| 16.03 miles | H5 Denver |
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
|
| 16.91 miles | QTS: Denver DC2 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 16.94 miles | QTS: Denver DC3 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 17.13 miles | QTS: Denver Campus |
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
|
| 17.15 miles | JP Morgan Aurora |
|
| 17.27 miles | Lumen Aurora 1 | |
| 17.91 miles | Charter Communications National Center West | |
| 18.04 miles | Earthnet Denver | |
| 18.29 miles | Aphorio Carter: Centennial, CO |
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
|
| 18.29 miles | Verizon: 9706 Easter | |
| 18.30 miles | Equinix Denver DE1 |
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
|
| 18.61 miles | Flexential Denver (Arapahoe) |
|
| 18.69 miles | DataBank Centennial (DEN2) |
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
|
| 18.77 miles | DataBank Centennial II (DEN5) |
|
| 19.23 miles | Comcast Centennial |
|
| 19.28 miles | Visa Central US Denver | |
| 19.42 miles | Expedient Centennial |
|
| 19.63 miles | Centersquare: Denver DEN1 |
|
| 19.99 miles | DataBank Englewood (DEN1) |
|
| 19.99 miles | Verizon: 313 Inverness |
The site is a previous XO Communications facility
|
September 01, 2024
Denver
July 15, 2024
Denver
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas