American Tower Boulder

Latest Podcast 9110 Interlocken Loop
Operational
Fully operational facility
Operated by:

American Tower Boulder

░░░ Request Dataset MW
Total Power
░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

9110 Interlocken Loop
American Tower Corporation Sites
Nearby Facilities

Sites within 15 miles of American Tower Boulder

Distance Site About
1.56 miles TIAA: Broomfield
2.28 miles DataBank Westminster DEN4
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.
3.77 miles RockyNet Louisville
6.03 miles 12121 Grant Street
6.19 miles Station OneInterested in this information?Contact us
6.65 miles JP Morgan Broomfield
7.55 miles Lockheed Martin Denver
7.84 miles 11:11 Systems: Thornton
This facility has a long history, having previously operated under the Sungard Availability Services and iland brands before being integrated into the 11:11 Systems portfolio.
10.50 miles Earthnet Denver
10.53 miles American Tower: Denver
11.41 miles CoreSite: DE3 DC3
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
11.43 miles CoreSite: Denver DE3
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
11.47 miles CoreSite: DE3 DC2
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
11.73 miles Iron Mountain DEN-1
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
12.41 miles NLR HPC DC: Golden, CO
NLR's High-Performance Computing (HPC) Data Center, situated within the Energy Systems Integration Facility (ESIF), operates with an annualized average power usage effectiveness (PUE) of 1.036.
12.58 miles 501 Wazee
900 kVA UPS system capacity Redundant battery strings Multiple redundant power distribution paths Branch Circuit Monitoring System
12.88 miles RockyNet Denver
12.88 miles VLEC Denver
12.88 miles Lumen Denver 2 & 3
12.88 miles Denver Gas & Electric Building (910 15th)
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
12.88 miles CoreSite Denver DE1
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
12.89 miles Handy Networks Denver
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
12.90 miles 1500 Champa
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
12.90 miles DataBank Denver DEN3
12.90 miles Flexential Denver (Champa)
12.90 miles Colorado Colo
13.13 miles Kyndryl: Boulder
13.30 miles Lumen Denver 1 (1850 North Pearl)
13.32 miles CoreSite DE2
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
15.70 miles Honda Longmont
Honda's North American Data Center in Longmont, Colorado has been awarded a Silver rating under the LEED standard from the U.S. Green Buildings Council.
15.96 miles DataCanopy: Denver
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.

Operating Company

Operated by:

American Tower Corporation (also referred to as American Tower or ATC) is an American publicly held company, owner and operator of wireless and broadcast communications infrastructure in several countries. American Tower is headquartered in Boston, Massachusetts and has local offices worldwide. The company was formed in 1995 as a unit of American Radio Systems, and was spun off from that company in 1998 when that company merged with CBS Corporation. Following the merger, American Tower began international expansion by establishing operations in Mexico in 1998 and Brazil in 1999. The company is structured as a real estate investment trust (REIT.) Source: Wikipedia

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read NV Energy Files Lawsuit Against Tract Over Nevada Data Center Costs
Nevada utility NV Energy has filed a lawsuit against Denver-based data center developer Tract, alleging the company failed to cover the costs of serving its facilities and instead shifted those exp...

NV Energy Files Lawsuit Against Tract Over Nevada Data Center Costs

August 04, 2026 Denver

Nevada utility NV Energy has filed a lawsuit against Denver-based data center developer Tract, alleging the company failed to cover the costs of serving its facilities and instead shifted those expenses to other utility customers across the state. “Most data center developers pursuing projects in...

Read more
Read Denver City Council Approves a One-year Moratorium on Data Centers
Denver City Council Approves a One-year Moratorium on Data Centers

Denver City Council Approves a One-year Moratorium on Data Centers

May 20, 2026 Denver

Denver City Council voted Monday to approve a one-year moratorium on new data center developments. The measure temporarily halts the acceptance, processing, and approval of zoning permits, site development plans, and amendment applications related to data centers. However, the moratorium excludes...

Read more
Read American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana
American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana

American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana

February 06, 2026 American Tower Corporation

US tower and data center firm American Tower has dropped plans to develop an Edge facility at a telecoms site in Indianapolis, Indiana.The single-story building would have totaled 4MW on seven acres of the 53-acre property. The company was planning to use a closed-loop cooling system and not...

Read more
Read American Tower Opens Edge Data Center in Raleigh, North Carolina
American Tower Opens Edge Data Center in Raleigh, North Carolina

American Tower Opens Edge Data Center in Raleigh, North Carolina

May 23, 2025 American Tower Corporation

American Tower Corporation has opened its Edge data center in Raleigh, North Carolina, marking the occasion with a ribbon-cutting ceremony at the site, the company's first data center in North Carolina’s Research Triangle region.The company notes that its Edge data centers are able to address the...

Read more
Read CoreSite seeks tax rebate for Denver data center
CoreSite seeks tax rebate for Denver data center

CoreSite seeks tax rebate for Denver data center

September 01, 2024 Denver

American Towner-owned company CoreSite is planning to “rehabilitate and activate” an abandoned industrial site in Denver as part of a proposed tax agreement. The data center campus will span 600,000 square feet and create up to 75 new trades and technology-oriented jobs, according to a...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?