Equinix: SV19

Latest Podcast Great Oaks Blvd
Planned
Future facility in planning stage
Operated by:

Equinix: SV19

Site: Equinix: SV1
Year Planned: 2028
Floors: 2
Ownership: Equinix owns the building.

Map and Nearby Locations

Great Oaks Blvd
Equinix Sites
Nearby Facilities

Equinix: SV19 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix: SV19

Distance Site About
0.07 miles Equinix: SV18
Equinix has opened the first phase of its SV18 data center in Silicon Valley.
0.15 miles Prime: San Jose
0.16 miles RICloud: 6580 Via del Oro
In 2017, RiCloud Corp acquired from Briggs Development and spent about $100 million renovating the property.
0.16 miles Equinix: SV12x
0.23 miles SC Zeus: San Jose
The site can support 5KW to 10KW per Rack. If support for Liquid Cooled Server is required, additional work needs to be completed, which will take around 4 months.
0.25 miles China Mobile San Jose
In 2023, after many delays, the building was commissioned
0.49 miles Lightedge: San Jose, CA
LightEdge acts as a colocation and hybrid cloud provider operating within Equinix’s Silicon Valley campus.
0.52 miles Equinix SV10
0.55 miles Equinix: SV1
The four building Equinix campus in Silicon Valley lies to the far south in San Jose, yet it is one of the best-connected data centers in the Bay Area.
0.58 miles Equinix SV5
0.64 miles Equinix SV11
1.72 miles Prologis: Silver Creek Valley
Prologis has filed plans to replace a previously approved warehouse project in South San Jose with a three-story data center, including a new substation, backup generation and dedicated transmission infrastructure.
8.91 miles Rackspace San Jose SJC2
Colocated within the Digital Reality's building
8.97 miles 150 S 1st
9.10 miles HostPapa SJ1
SJ1 is located within CoreSite's 55 S Market building which is a legacy telecom and Internet hub.
9.10 miles CoreSite SV1 55 S Market
55 S Market is a legacy Carrier Hotel in San Jose
9.10 miles Hurricane San Jose
Multiple racks in cages in the same building as CoreSite Any2 San Jose 20+ Carriers with Diverse Fiber In Building
9.55 miles Fibernet San Jose
9.56 miles Cerulean San Jose
9.64 miles Arena Investors: Bassett AI R&D
Spanning 281,800 sq ft, the development will feature lab and office spaces, three floors of data halls, IT white space, an on-site substation, generators, and a rooftop cooling plant.
10.00 miles Evocative: SJC7
10.01 miles 365 San Jose
12.10 miles Equinix San Jose SV3
12.27 miles CloudHQ: Santa Clara SJC1
CloudHQ's SJC1 data center will be a multi-story facility designed to accommodate various deployment types.
12.44 miles Santa Clara (SC1) Digital Realty
12.54 miles HPC Data CenterInterested in this information?Contact us
12.58 miles 2045 & 2055 Lafayette - Digital Realty
Digital Realty acquired the facility in 2004 and fully leased it to Savvis. In 2007, Microsoft acquired that lease and is now the sole tenant of the facility.
12.64 miles Vantage: CA23
CA23 is the easternmost and largest of three four-story data centers on Vantage's Santa Clara II (CA2) campus, with more than 200,000 sq ft.
12.68 miles Vantage: CA22
CA22 is the center building of three four-story data centers on Vantage's Santa Clara II (CA2) campus on Mathew Street.
12.70 miles Vantage: CA21
CA21 is the westernmost of three four-story data centers on Vantage's Santa Clara II (CA2) campus on Mathew Street. The 175,000 sq ft building shares the campus Silicon Valley Power substation.
12.71 miles Tishman Speyer: Santa Clara
In July 2026, global real estate firm Tishman Speyer acquired CyrusOne’s 23.6-acre Santa Clara data center site for $65.4 million.
12.80 miles Skybox Santa Clara
12.85 miles STACK SVY02A
STACK Infrastructure is constructing a new data center facility at 1200 Memorex Drive, located in an industrial corner of Santa Clara. The four-story data center will contain 472,920 square feet.
12.90 miles Central TowerInterested in this information?Contact us
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
13.01 miles Equinix San Jose SV13
Former Verizon data center in San Jose that Equinix acquired in 2017. Equinix closed SV13 in Q2 2023.
13.02 miles Digital Realty: SJC37
13.05 miles Stack: SVY01B
Three-story data center that STACK built at 2001 Fortune Drive in San Jose, next to SVY01A on the original Fortune Drive parcel.
13.07 miles EdgeConneX: 1600 Memorex
Expansion site
13.08 miles Goodman Innovation Bldg2
13.09 miles Overton Moore Properties: 2334 Lundy Place
Currently leased to a Triple Net customer, NTT Communications.
13.09 miles Stack: SVY01C
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
13.11 miles ECL CSJ1
ECL CSJ1 is EdgeCloudLink's planned San Jose colocation site at 350 W Trimble Road, inside the Goodman Innovation Centre San Jose campus. The single-story, rack-ready facility is designed for liquid-cooled AI inference and low-latency workloads, about a mile from San Jose International Airport.
13.11 miles Goodman Innovation Bldg1
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
13.11 miles Stack: SVY01A
Former Seagate fab at 2001 Fortune Drive in North San Jose, rebuilt by Fortune Data Centers with seismic upgrades to FEMA essential-facility standards and later run by Infomart and STACK. It shares its 9-acre parcel with SVY01B.
13.15 miles EdgeConneX Santa Clara
13.17 miles Digital Realty: SJC31
13.18 miles Stack: SVY01D
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
13.26 miles Connect Data Centers: Santa Clara, CA
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
13.33 miles Cologix Santa Clara
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
13.34 miles NTT Silicon Valley SV1
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
13.36 miles Digital Realty: SJC11
13.41 miles East CenterInterested in this information?Contact us
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
13.43 miles Prime Santa Clara (Martin)
13.46 miles Prime Santa Clara
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
13.47 miles Prime: 2225 Martin
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
13.47 miles NaviSite Santa Clara
13.50 miles Digital Realty: SJC15
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
13.50 miles Tata San Francisco
13.50 miles Digital Realty: Silicon Valley SJC10
Digital Realty acquired the 3 story facility in 2006. Telx formerly operated the building MMR. Digital Realty acquired Telx in 2015.
13.52 miles Lumen Santa Clara
13.52 miles Prime: 1231 Comstock
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
13.54 miles Colovore: SJC01
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
13.56 miles Digital Realty: SJC16
13.57 miles Evocative Santa Clara SJC14
13.57 miles Digital Realty: SJC14
13.57 miles Colovore: SJC02
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
13.57 miles StratCap: 3205 Bassett
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
13.58 miles Csquare: SFO4-A
Csquare SFO4-A is a two-story colocation building at 1500 Space Park Drive in Santa Clara, leased from Digital Core REIT. Digital Realty retrofitted it as a data center for Savvis in 2008, and it earned LEED Gold in 2009.
13.61 miles Csquare: SFO4-B
Csquare SFO4-B is a colocation building at 1550 Space Park Drive in Santa Clara, next to SFO4-A, owned by Csquare. Cyxtera built it out for an anchor customer in two phases starting in 2021.
13.65 miles Evocative: Santa Clara, SJC3
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
13.65 miles Digital Realty: SJC29
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
13.65 miles Astound: Santa Clara
13.71 miles Equinix Santa Clara SV2
13.76 miles OpenColo
13.81 miles 2950 Zanker
The building is 100% leased on a long-term basis to a major telecommunications company.
13.81 miles Digital Realty: SJC30
13.85 miles Digital Realty: SJC35
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
13.89 miles Csquare: SFO1-B
Csquare SFO1-B is a two-story colocation building at 2403 Walsh Avenue in Santa Clara, next to SFO1-A. Exodus converted it into its SC5 data center in 2000, and Csquare now owns it.
13.91 miles CoreSite Milpitas SV2
13.92 miles Csquare: SFO1-A
Csquare SFO1-A is a two-story colocation building at 2401 Walsh Avenue in Santa Clara, the larger of the two SFO1 buildings. Exodus converted it into its SC4 data center in 2001, and Csquare now owns it.
14.07 miles Vantage: CA12
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
14.10 miles Vantage: Santa Clara CA3
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
14.11 miles CoreSite SV9
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
14.11 miles Vantage: CA16
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
14.12 miles Vantage: CA15
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
14.13 miles Vantage: CA14
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
14.14 miles Digital Realty: SJC34
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
14.15 miles Vantage: CA11
CA11 (formerly V1) is the largest of six data centers on Vantage's Santa Clara I (CA1) campus at 2820 Northwestern Parkway. The 216,000 sq ft building houses the campus interconnection suite, now Digital Realty SJC34 (ex-Telx).
14.16 miles CoreSite SV5
14.17 miles Vantage: CA13
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
14.19 miles CoreSite SV3
14.20 miles CoreSite SV4
14.25 miles CoreSite SV6
14.26 miles Bowers Data Center
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
14.28 miles CoreSite SV7
14.30 miles CoreSite SV8
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
14.36 miles EdgeCore: Silicon Valley SV01
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
14.44 miles EdgeCore: SV02
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
14.49 miles Intel Santa Clara D2P3
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
14.52 miles Evocative Santa Clara SJC11
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
14.64 miles Csquare: Sunnyvale SFO3
Csquare SFO3 is a colocation data center at 1400 Kifer Road in Sunnyvale, leased from Mapletree Industrial Trust. Built in 1992 and fitted out as a data center in 1998 (Cyxtera SN1), it is served by PG&E.
14.69 miles H5: Silicon Valley
14.69 miles ColoXchange Sunnyvale
14.71 miles Center TwoInterested in this information?Contact us
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
14.74 miles Element Critical SV1
14.74 miles Point GammaInterested in this information?Contact us
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
14.78 miles Lumen Sunnyvale 1
14.86 miles Equinix Santa Clara SV14
14.89 miles Equinix Santa Clara SV15
14.90 miles Equinix Santa Clara SV16
14.94 miles Equinix Santa Clara SV17
Former Terremark NAP West facility in Santa Clara that Equinix acquired from Verizon in 2017. Equinix closed SV17 in Q4 2025.
15.30 miles China Telecom Santa Clara
15.36 miles QTS Santa Clara
QTS's Santa Clara campus has two distinct data center buildings
15.43 miles GlobalInterested in this information?Contact us
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
15.45 miles 400 Holger Way, San Jose
15.56 miles Menlo: 300 Holger Way
A proposal has been approved for a data center at 300 Holger Way in North San Jose, California, though the official permit filings do not explicitly name the developer or operator.
15.60 miles DataBank Santa Clara SFO1
15.64 miles Csquare: SFO2-B
Csquare SFO2-B is a colocation building at 4650 Old Ironsides Drive in Santa Clara, next to SFO2-A. Exodus converted it into its SC9 data center in 2000, Digital Realty expanded it in 2012, and Csquare now owns it.
15.67 miles Point TwoInterested in this information?Contact us
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
15.69 miles 4700 Old Ironsides
15.69 miles Csquare: SFO2-A
Csquare SFO2-A is a one-story colocation building at 4700 Old Ironsides Drive in Santa Clara, on the SFO2 campus. Exodus converted it into its SC8 data center in 2000, and Csquare now owns it.
15.75 miles Prologis: San Jose 1
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
15.81 miles Prologis: San Jose 2
This facility is part of Prologis' data center campus in San Jose, California.
15.88 miles Prologis: San Jose 3
This facility is part of Prologis' data center campus in San Jose, California.
15.94 miles Prologis: San Jose 4
This facility is part of Prologis' data center campus in San Jose, California.
16.38 miles Vantage: Nortech Parkway
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
16.65 miles MicroLink: Bay Area, CA
MicroLink is planning to build a data center in San Jose, California.
16.77 miles Terra Ventures: San Jose, CA
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
17.06 miles Equinix Sunnyvale SV6
Former Switch and Data facility in Sunnyvale that Equinix acquired in 2010. Equinix closed SV6 in Q3 2022.
17.76 miles Equinix Sunnyvale SV4
17.87 miles Menlo: MD-SV1 (Sunnyvale)
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
18.04 miles Hurricane Electric Fremont 2
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX) 70 Internet Networks 7 Carriers with Diverse Fiber
18.26 miles HPC Data CenterInterested in this information?Contact us
18.32 miles Verizon: Fremont
The site is a previous XO Communications facility
19.46 miles Hurricane Electric Fremont 1
2 Internet Exchange Points (SFMIX and AMS-IX Bay) 20 Internet Networks 6 Carriers with Diverse Fiber
19.48 miles Center PlusInterested in this information?Contact us
Amazon is building a data center campus on a 56-acre plot along highway 101, between Leavesly Road and Gilman Road in the City of Gilroy, California.
19.49 miles Point OneInterested in this information?Contact us
Amazon is planning to build a data center campus on a 56-acre plot along highway 101, between Leavesly Road and Gilman Road in the City of Gilroy, California.

Equinix: SV19 Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read NetworkOcean Runs Solar-Powered GPU Data Center on San Francisco Bay
San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered...

NetworkOcean Runs Solar-Powered GPU Data Center on San Francisco Bay

October 03, 2026 San Francisco Bay Area

San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered by a 20kW solar array during a trial in San Francisco Bay. The customer was not disclosed....

Read more
Read Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers
Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed...

Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers

September 30, 2026 Equinix

Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed to reduce the need for specialized cabling and hardware in data centers. Schneider said the...

Read more
Read Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer
Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryo...

Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer

September 03, 2026 Equinix

Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryogenic cooling and control electronics. The chip can be replaced to increase the qubit count without...

Read more
Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?