LightEdge Altoona 1

Latest Podcast
1435 Northridge Circle
Operational
Fully operational facility
Operated by:

LightEdge Altoona 1

Year Built: 2012
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Lightedge Facility:

  • Four separate modular 5,000 square feet data centers
  • 12” reinforced pre-cast concrete walls with joints reinforced and tested to 200+ MPH winds
  • Dry membrane, double concrete roofing system to maximize tear off resistance, no roof penetrations in machine occupied areas
  • Build to suit up to 20,000 square feet of additional data center space on property
  • Fire Suppression - FM200 (DC1 and DC2), Dry Pipe (DC3 and DC4)

Power:

  • S+1 diversified electrical within the building utilizing five distinct UPS, Generator and ATS systems
  • On-site diesel generators (24 hour capacity) with 4.5 MW of on-site power generation capability
  • Iowa power costs among the lowest in the nation
  • Substation diversity
  • Primary’s capacity = 33 MVA
  • Secondary’s capacity = 66 MVA
  • Underground redundant feeds
  • Power diversity up to 225 watts/sq ft
  • HVACs support 1200kW per DC
  • S+1 diversied electrical:
  • 5 UPS, generators & ATS systems

HVAC:

  • Cooling through packaged HVAC units located at the side of the facility to minimize roof penetrations
  • 600 tons yields 2.4 MW
  • Up to 240 tons of cooling capacity per data center in an N+1 configuration
  • Data Centers 1 and 2 - Hot aisle / Cold aisle design, down-draft cooling
  • Data Centers 3 and 4 - Raised floor
  • Future build-outs will take advantage of Iowa’s annual 1,100 Cooling Degree Days to lower power costs and offer some of the lowest PUEs in the nation.
  • Future build-outs will take advantage of Iowa’s annual 1,100 Cooling Degree Days to lower power costs and offer some of the lowest PUEs in the nation.
  • Dual power fed HVAC units with Variable Speed Fans
  • Humidity set point of 44
  • Building Management System to ensure conformance with ASHRAE TC 9.9 standards for A1 environments

Network:

  • Carrier Agnostic connectivity through partnerships with:
  • Sprint, CenturyLink, WindStream, Cox, AT&T, Mediacom, TW Telecom, XO Communications, Level 3, INS and Bandwidth.com
  • Data Center is located within 1 mile of major telecommunication highway. Dark Fiber and Lit Services are available from a multitude of providers including:
  • Verizon, Sprint, ATT, Century Link, Windstream, Unite, PinPoint, Level 3, Iowa Network Services, Mediacom, US Networks, Cogent and more
  • Private fiber services linking LightEdge Data Center to Denver, CO and Chicago, IL (Cermac) for large scale Internet and carrier network integration

Compliance:

  • Data center physical security complies with PCI-DSS v2.0, HIPAA / HITECH guidelines and is audited annually using SSAE-16 SOC I Type II
  • ISO 20000 certified
  • Bulletproof glass at main entrance, secure check-in desk, Man traps, biometrics and tailgate sensors for all data center entrances
  • Closed-circuit TV monitored 24/7/365 with video archiving
  • 24x7 manned Network Operations Center with engineering staff performing hourly walk-arounds

Map and Nearby Locations:

1435 Northridge Circle
LightEdge Solutions Sites
Nearby Facilities

Sites within 15 miles of LightEdge Altoona 1

Distance Site About
0.06 miles Lightedge Altoona 2
2.63 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
2.65 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
2.71 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
2.72 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
2.86 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
3.06 miles Hyperscale Data Center Request Dataset
Meta Platforms, formerly known as Facebook, operates a large data center campus in Altoona, Iowa, located at 100 Share Way NW.
3.14 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
3.15 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
3.17 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
3.17 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
4.09 miles Tract: Altoona Tech Park
Tract is planning Altoona Technology Park, a 468-acre development in the Des Moines data center region with close proximity to hyperscale and wholesale data center providers.
5.63 miles Edged Energy: Des Moines DSM01
Data center firm Edged is developing a new 105,000-square-foot (9,755 sqm) facility, known as Edged Des Moines, on a 17.5-acre site outside Des Moines, Iowa.
8.44 miles Lumen Des Moines
10.29 miles Consolidated Des Moines
10.42 miles Cologix: Des Moines DSM3
10.45 miles Cologix DSM1
DSM1 occupies 4,000 square feet of space and enables connectivity to 26 unique networks in the Cologix Meet-Me-Room with direct access to the DesMoinesIX internet exchange.
14.78 miles Connect Data Centers: Des Moines
US investment firm Oppidan's Des Moines data center spans 60,589 sq ft.
16.65 miles Hyperscale Data Center Request Dataset
In July 2023, Microsoft gained a permit for a data center at 3655 S.E. Soteria Ave. Issued to Microsoft's contractor, the Weitz Company, the permit was for a 184,600 sq ft facility under the description DSM 14.
16.68 miles Hyperscale Data Center Request Dataset
17.17 miles Hyperscale Data Center Request Dataset
This building will be a part of Microsoft Corp.'s Ginger East data center campus.
17.18 miles Hyperscale Data Center Request Dataset
The first phase of the Ginger East project, which sits on a 146-acre plot east of Veterans Parkway at SE Maffitt Lake Road, consists of a 250,000 sq ft (23,200 sqm) data center building located near the company's existing Alluvion data center.
17.25 miles Hyperscale Data Center Request Dataset
In 2023, a permit valued at $358 million was issued for a 245,000-square-foot data center in Microsoft’s Ginger East campus.
17.31 miles Hyperscale Data Center Request Dataset
In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.
17.38 miles Hyperscale Data Center Request Dataset
In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.

LightEdge Altoona 1 Data Center Photos (See all)

Operating Company

Operated by:

Founded in 1996, LightEdge is a enterprise-grade cloud service provider, colocation and consulting company.

LightEdge is ISO 20000-1, SSAE 16 SOC 1 and SSAE 16 SOC 2 certified with Data Center operations meeting the stringent PCI-DSS and HIPAA compliance requirements.

LightEdge is privately held with the Anschutz Corporation being the largest investor.

16
Facilities
6
Markets
37MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?