US Signal Des Moines IA01

Latest Podcast
390 NE Alices Road
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

US Signal Des Moines IA01

Short Code: IA01
Site was first built in 2009 and has expansions through 2026
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The site is a former OneNeck facility that was acquired in 2024.

Facility

  • Year Built 2009
  • Size 20,000 square feet; facility can be built out to 60,000 square feet
  • Tier Concurrently maintainable; 2N electrically
  • Building Access Customer access 24/7
  • Loading Area Grade-level loading dock

Power

  • Utility MidAmerican Energy
  • Utility Feeds Two 2500 kVA utility transformers with diverse substation access
  • Critical Load 1600 kW
  • Generators Three 1.5 MW
  • UPS 2N

Data Center

  • Services Types Private suite, cage or cabinet
  • Fire Detection VESDA (Very Early Smoke Detection Apparatus)
  • Fire Suppression FM200 clean agent
  • HVAC N+1

Connectivity

  • Type Carrier neutral facility
  • Carriers CenturyLink, Enventis, Fiber Utilities, INS, Mediacom, NexGen, SageNet, Windstream
  • Entrance Facilities Dual entrances to telecommunications room
  • Internet Bandwidth Managed bandwidth with BGP routing across redundant
  • backbone connections with multiple Tier 1 carriers

Security

  • Access Control Two factor authentication: Biometric and proximity card
  • Surveillance System Recorded and monitored digital video at 50+ points
  • Security Officers Patrol facility 24/7

Map and Nearby Locations:

390 NE Alices Road
US Signal Sites
Nearby Facilities

Sites within 15 miles of US Signal Des Moines IA01

Distance Site About
3.64 miles Hyperscale Data Center Request Dataset
The construction in Waukee has been long delayed and finally was restarted in 2022.
3.65 miles Hyperscale Data Center Request Dataset
This facility is part of Apple's Des Moines data center campus development project, located at 2995 W. Hickman Road in northwest Waukee, Iowa.
3.65 miles Hyperscale Data Center Request Dataset
This facility is part of Apple's Des Moines data center campus development project, located at 2995 W. Hickman Road in northwest Waukee, Iowa.
3.66 miles Hyperscale Data Center Request Dataset
This facility is part of Apple's Des Moines data center campus development project, located at 2995 W. Hickman Road in northwest Waukee, Iowa.
3.66 miles Hyperscale Data Center Request Dataset
This facility is part of Apple's Des Moines data center campus development project, located at 2995 W. Hickman Road in northwest Waukee, Iowa.
3.67 miles Hyperscale Data Center Request Dataset
This facility is part of Apple's Des Moines data center campus development project, located at 2995 W. Hickman Road in northwest Waukee, Iowa.
5.77 miles Hyperscale Data Center Request Dataset
5.91 miles Hyperscale Data Center Request Dataset
Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa.
5.98 miles Hyperscale Data Center Request Dataset
Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa.
6.04 miles Hyperscale Data Center Request Dataset
This planned data center building will be an addition to Microsoft's existing Ginger West Campus.
6.12 miles Hyperscale Data Center Request Dataset
This data center building is an addition to Microsoft's existing Ginger West Campus.
6.22 miles Hyperscale Data Center Request Dataset
This planned data center building will be an addition to Microsoft's existing Ginger West Campus.
7.06 miles COPT: Des Moines
COPT Defense Properties plans to develop a large data center campus near Des Moines on a 365-acre plot, which they acquired for $32 million in late September 2024.
7.06 miles COPT: Des Moines Expansion
8.52 miles Hyperscale Data Center Request Dataset
Microsoft has acquired 377 acres of farmland for $40 million for a data center in Van Meter's Vision Park, Des Moines, Iowa.
8.84 miles Hyperscale Data Center Request Dataset
In May 2024, The West Des Moines City Council approved a development agreement with Microsoft for another data center in Des Moines.
9.07 miles Hyperscale Data Center Request Dataset
The SW Kerry Street site, also known as Project Osmium, was announced in 2016 and will span 1.7 million sq ft (158,000 sq m) of land once fully built out.
9.13 miles Hyperscale Data Center Request Dataset
The SW Kerry Street site, also known as Project Osmium, was announced in 2016 and will span 1.7 million sq ft (158,000 sq m) of land once fully built out.
9.21 miles Hyperscale Data Center Request Dataset
The company was granted permission for the third of five planned buildings on the site in 2021.
9.26 miles Hyperscale Data Center Request Dataset
In December 2022, Microsoft was issued a permit valued at $255 million for the fourth building.
9.33 miles Hyperscale Data Center Request Dataset
A $345 million permit was issued in 2023 for a 250,000-square-foot facility at 5855 S.W. Kerry St. This data center building is the final one for the Osmium Campus.
9.38 miles Connect Data Centers: Des Moines
US investment firm Oppidan's Des Moines data center spans 60,589 sq ft.
9.85 miles Hyperscale Data Center Request Dataset
In July 2023, Microsoft gained a permit for a data center at 3655 S.E. Soteria Ave. Issued to Microsoft's contractor, the Weitz Company, the permit was for a 184,600 sq ft facility under the description DSM 14.
9.95 miles Hyperscale Data Center Request Dataset
The first phase of the Ginger East project, which sits on a 146-acre plot east of Veterans Parkway at SE Maffitt Lake Road, consists of a 250,000 sq ft (23,200 sqm) data center building located near the company's existing Alluvion data center.
9.98 miles Hyperscale Data Center Request Dataset
In 2023, a permit valued at $358 million was issued for a 245,000-square-foot data center in Microsoft’s Ginger East campus.
10.01 miles Hyperscale Data Center Request Dataset
In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.
10.03 miles Hyperscale Data Center Request Dataset
In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.
10.25 miles Hyperscale Data Center Request Dataset
This building will be a part of Microsoft Corp.'s Ginger East data center campus.
10.64 miles Hyperscale Data Center Request Dataset
12.05 miles Cologix DSM1
DSM1 occupies 4,000 square feet of space and enables connectivity to 26 unique networks in the Cologix Meet-Me-Room with direct access to the DesMoinesIX internet exchange.
12.12 miles Cologix: Des Moines DSM3
12.17 miles Consolidated Des Moines
15.20 miles Edged Energy: Des Moines DSM01
Data center firm Edged is developing a new 105,000-square-foot (9,755 sqm) facility, known as Edged Des Moines, on a 17.5-acre site outside Des Moines, Iowa.
17.23 miles Tract: Altoona Tech Park
Tract is planning Altoona Technology Park, a 468-acre development in the Des Moines data center region with close proximity to hyperscale and wholesale data center providers.
17.40 miles Lumen Des Moines
17.73 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
17.75 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
17.76 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
17.78 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
17.78 miles Hyperscale Data Center Request Dataset
Meta Platforms, formerly known as Facebook, operates a large data center campus in Altoona, Iowa, located at 100 Share Way NW.
18.13 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
18.19 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
18.21 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
18.33 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.
18.41 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Altoona Campus in Iowa.

US Signal Des Moines IA01 Data Center Photos (See all)

Operating Company

Operated by:

US Singal Data Centers are:

  • Audited for compliance with HIPAA/HITECH, PCI DSS, and SOC 1, TYPE 2
  • Scalable and customizable
  • Powered by US Signal's wholly owned, robust network

US Signal rings the Midwest with its fiber-optic network. The network connects subscribers in the metropolitan areas of Indianapolis, Detroit, Chicago, and 12 other cities. US Signal provides telecommunications services to institutional, enterprise, and wholesale customers in Illinois, Indiana, Michigan, and Wisconsin. It also provides Internet access, dark fiber capacity, and colocation services. The company's related infrastructure services include network design and construction. US Signal has supply partnerships with equipment manufacturers including ADTRAN and Cisco Systems. Source: hoovers.com

21
Facilities
11
Markets
33MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?