The site is directly connected to the ERCOT electricity grid via a 345kV transmission connection located on the 420-acres of freehold land owned by IREN.
The site is directly connected to the ERCOT electricity grid via a 345kV transmission connection located on the 420-acres of freehold land owned by IREN.
IREN's liquid-cooled data center at Childress is a high-performance facility specifically engineered to host demanding AI and High-Performance Computing (HPC) workloads.
The Canal Flats facility is located in the Canadian Rockies, 100km from Cranbrook regional airport (population 20,000) and 500km east of Vancouver.
The IREN facility is located in Mackenzie (population 4,000), historically a major lumber town with a regional airport located 670km North of Vancouver.
The facility is located in Prince George (population ~76,000), the largest city in northern British Columbia, located 500km north of Vancouver.
Iren has secured over 500 acres of land for the Sweetwater 2 project in Fisher County, West Texas.
Iren is progressing with significant infrastructure projects, including the development of a 1.4 GW substation at its Sweetwater site, which is expected to be energized by April 2026.