IREN: Woods County, Oklahoma

Latest Podcast Woods County
Land BankPlanned
Future facility in planning with land secured
Operated by:

IREN: Woods County, Oklahoma

Year Planned: 2028
Utility Provider: Southwest Power Pool (SPP)
Lot Size: 2,000 acres

The development in Woods County, Oklahoma, is centered on a secured 1.6 GW power allocation, positioning the site as a large-scale hub for AI and high-performance computing.

Spanning 2,000 acres, the project utilizes the Southwest Power Pool (SPP) grid to facilitate geographic diversification for IREN’s infrastructure portfolio. The facility is being designed to accommodate high-density hardware requirements, with the initial phase of power ramp-up and energization scheduled to commence in 2028.

Map and Nearby Locations

Woods County
IREN Sites
Nearby Facilities

IREN: Woods County, Oklahoma Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

IREN: Woods County, Oklahoma Data Center Photos See all

Operating Company

Operated by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.

15
Facilities
4
Markets

News See all

Read Oklahoma Passes Bill to Protect Ratepayers From Data Center-Related Cost Increases
Oklahoma Passes Bill to Protect Ratepayers From Data Center-Related Cost Increases

Oklahoma Passes Bill to Protect Ratepayers From Data Center-Related Cost Increases

May 16, 2026 Oklahoma

Oklahoma Governor Kevin Stitt has signed a bill to protect ratepayers from rising utility and infrastructure costs linked to data centers. Proposed by Rep. Brad Boles on January 3, 2026, it is expected to take effect in July. The law requires large-load customers—including data centers, crypto...

Read more
Read Iren Powers up Initial Phase of Sweetwater Data Center Campus
Iren Powers up Initial Phase of Sweetwater Data Center Campus

Iren Powers up Initial Phase of Sweetwater Data Center Campus

May 06, 2026 IREN

Data center and cloud firm Iren has energized a new campus in Texas. The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas. The firm’s two Sweetwater campuses, both located outside Sweetwater in Fisher County, are...

Read more
Read Oklahoma House Committee Moves Forward Bill on Data Center Grid Costs
Oklahoma House Committee Moves Forward Bill on Data Center Grid Costs

Oklahoma House Committee Moves Forward Bill on Data Center Grid Costs

February 17, 2026 Oklahoma

An Oklahoma House budget subcommittee has approved legislation aimed at protecting residential ratepayers from having to foot the bill for new infrastructure driven by rising data center demand.“This would make sure that regular ratepayers aren’t having to pay for those really high energy costs,...

Read more
Read Jericho and Comstock Partner to Launch AI Data Center Projects in Oklahoma
Jericho and Comstock Partner to Launch AI Data Center Projects in Oklahoma

Jericho and Comstock Partner to Launch AI Data Center Projects in Oklahoma

February 13, 2026 Oklahoma

Canadian energy company Jericho Energy Ventures has partnered with real estate developer Comstock Holding to form a joint venture focused on the development of AI data center campuses across Oklahoma."We are pleased to welcome Comstock, a leading real estate investor and developer, as a major...

Read more
Read Beale Infrastructure in Talks to Build Data Center Campus outside Tulsa, Oklahoma
Beale Infrastructure in Talks to Build Data Center Campus outside Tulsa, Oklahoma

Beale Infrastructure in Talks to Build Data Center Campus outside Tulsa, Oklahoma

January 07, 2026 Oklahoma

Data center developer Beale Infrastructure is planning another data center campus outside Tulsa in Oklahoma. Local press reports that the city of Claremore and Claremore Economic Development (CED) are in discussions with Beale over a data center development known as Project Mustang.“Over the past...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?