IREN: Guadalajara GUA1

Latest Podcast Polígono Industrial El Ruiseñor
Planned
Future facility in planning stage
Operated by:

IREN: Guadalajara GUA1

Year Planned: 2028

IREN plans a data center in the El Ruiseñor industrial area of Guadalajara, in Castilla-La Mancha. Nostrum Group, which IREN acquired in June 2026, developed the project, and the company has bought about two hectares of industrial land. The city of Guadalajara said the project has a granted grid connection, construction is planned to start at the end of 2026 and operation is expected in 2028.

Site History

  • February 2026: the city of Guadalajara announced the project.

Map and Nearby Locations

Polígono Industrial El Ruiseñor
IREN Sites
Nearby Facilities

IREN: Guadalajara GUA1 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of IREN: Guadalajara GUA1

Distance Site
8.91 miles Campus ThreeInterested in this information?Contact us
8.98 miles Pure DC: Madrid
10.39 miles Iridium: Carretera Nacional
10.68 miles Nabiax: ADC 1
10.68 miles Nabiax: ADC 2
10.68 miles Hyperscale Data CenterInterested in this information?Contact us
10.69 miles Nabiax: ADC 3
10.78 miles Adam MAD Alcala
11.82 miles Fortinet: Guadalajara
12.21 miles Box2bit: AXIS East
13.97 miles Templus: Alcala, Madrid
14.40 miles Vaultica: MAD01
14.86 miles Plaza PlusInterested in this information?Contact us
17.56 miles Avaio: Madrid Scorpio
18.53 miles Campus AlphaInterested in this information?Contact us
19.67 miles Iron Mountain MAD-1

Operating Company

Operated by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.

0
Facilities
0
Markets

News See all

Read IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured
IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional [New South Wales](https://baxtel.com/regions/new-south-wales). The Nasdaq-listed o...

IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured

October 14, 2026 IREN

IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional New South Wales. The Nasdaq-listed operator took the proposal to the local community ahead of a scoping report due to the state's Department of Planning, Housing and...

Read more
Read Iren Powers up Initial Phase of Sweetwater Data Center Campus
Iren Powers up Initial Phase of Sweetwater Data Center Campus

Iren Powers up Initial Phase of Sweetwater Data Center Campus

May 06, 2026 IREN

Data center and cloud firm Iren has energized a new campus in Texas. The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas. The firm’s two Sweetwater campuses, both located outside Sweetwater in Fisher County, are...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.