IREN: Bundey, South Australia

Latest Podcast
Bundey Substation
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

IREN: Bundey, South Australia

Site planned for 2028 and has expansions through 2033
Utility Provider: ElectraNet

IREN has finalized a transmission connection agreement with ElectraNet to develop a high-performance computing and AI data center campus in Bundey, South Australia.

Located 125 kilometers northeast of Adelaide, the site will connect directly to a 330kV substation hub via four feeder exits, eliminating the need for major network upgrades. Pre-construction planning and procurement are underway, with the first phase scheduled to come online in 2028. The facility is designed to support high-density GPU clusters using South Australia's renewable grid and regional subsea fiber links to connect with Asia-Pacific tech hubs.

Map and Nearby Locations:

Bundey Substation
IREN Sites
Nearby Facilities

IREN: Bundey, South Australia Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

IREN: Bundey, South Australia Data Center Photos (See all)

Operating Company

Operated by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.