IREN: Childress, TX

Latest Podcast 620 FM1033
Under ConstructionOperationalPlanned
Operational facility with ongoing expansion and future phases planned
Operated by:

IREN: Childress, TX

Site was first built in 2025 and has expansions through 2027
Utility Provider: AEP Texas
Ownership: IREN owns the building.
Lot Size: 576 acres
░░░░ Request Dataset MW
Operational Power

IREN owns a 576-acre freehold campus on US 287 east of Childress, Texas. This record covers the campus's original air-cooled halls, which IREN built from 2022 to 2025 for Bitcoin mining.

IREN is converting 15 of these halls to AI cloud capacity in three groups. The first group will host NVIDIA Blackwell systems under a five-year, $3.4 billion AI cloud contract with NVIDIA, ramping from early 2027. IREN plans to wind down Bitcoin mining by the end of 2026.

Utility

The campus connects to the ERCOT grid at the Salvare 345 kV switchyard, owned by Electric Transmission Texas, on the Jim Treece to Tesla line. AEP Texas is the transmission provider. IREN owns the on-site 345 kV bulk substation. No behind-the-meter generation.

Site History

  • In May 2026, IREN signed a $3.4 billion AI cloud contract with NVIDIA for air-cooled capacity at Childress.
  • In July 2024, IREN expanded its grid connection agreement with AEP Texas after ERCOT network studies.
  • In April 2023, IREN energized the on-site 345 kV bulk substation.
  • In January 2022, IREN signed its grid connection agreement with AEP Texas.

Map and Nearby Locations

620 FM1033
IREN Sites
Nearby Facilities

IREN: Childress, TX Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of IREN: Childress, TX

Distance Site About
0.20 miles IREN: Horizon 6
Horizon 6 is one of two further liquid-cooled AI data centers IREN is building on its Childress campus in Texas.
0.29 miles IREN: Horizon 5
Horizon 5 is one of two further liquid-cooled AI data centers IREN is building on its Childress campus in Texas.
0.46 miles IREN: Horizon 4
Horizon 4 is one of four liquid-cooled AI data centers IREN is building at Childress, Texas, for Microsoft.
0.49 miles IREN: Horizon 1
Horizon 1 is the first liquid-cooled AI data center on IREN's Childress campus. It serves Microsoft with NVIDIA GB300 systems.
0.54 miles IREN: Horizon 3
Horizon 3 is one of four liquid-cooled AI data centers IREN is building at Childress, Texas, for Microsoft.
0.57 miles IREN: Horizon 2
Horizon 2 is one of four liquid-cooled AI data centers IREN is building at Childress, Texas, for Microsoft.
1.46 miles Crusoe: Project Hyper Childress Building 2
Building 2 of Crusoe's Project Hyper is a single-story AI data center under construction on Lancium's Clean Campus in Childress County, Texas.
1.47 miles Crusoe: Project Hyper Childress Building 1
Building 1 of Crusoe's Project Hyper is a single-story AI data center under construction on Lancium's Clean Campus in Childress County, Texas.
1.55 miles Lancium: Childress Campus
Lancium's Clean Campus in southeast Childress County, Texas, is powered land where Crusoe is building three AI data centers.
1.60 miles Crusoe: Project Hyper Childress Building 3
Building 3 of Crusoe's Project Hyper is a single-story AI data center under construction on Lancium's Clean Campus in Childress County, Texas.
2.87 miles Metro ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

IREN: Childress, TX Data Center Photos See all

CHILDRESS TX
Source: Baxtel
CHILDRESS TX 2023
Source: Baxtel

Operating Company

Operated by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.

0
Facilities
0
Markets

News See all

Read 19000-200 Holdings Files $8B Data Center Plan For Quanah, Texas
An affiliate of [Integra](https://baxtel.com/data-centers/integra) has registered $8 billion of new construction a![constructionreviewonline.com](/rails/active_storage/representations/proxy/eyJfcmF...

19000-200 Holdings Files $8B Data Center Plan For Quanah, Texas

November 10, 2026 Integra

An affiliate of Integra has registered $8 billion of new construction at a data center campus in Quanah, Texas. The filing with the Texas Department of Licensing and Regulation covers Building 5, a 288,355-square-foot single-story data center at 4628 Four Corners Road in Hardeman County. The TDLR...

Read more
Read Integra Files $8B Building at 756MW Quanah Data Center Campus in Texas
Integra Mission Critical has registered an $8 billion data center building at its planned 756-megawatt campus near Quanah, in Hardeman County, Texas. The [Texas Department of Licensing and Regulati...

Integra Files $8B Building at 756MW Quanah Data Center Campus in Texas

November 09, 2026 Integra

Integra Mission Critical has registered an $8 billion data center building at its planned 756-megawatt campus near Quanah, in Hardeman County, Texas. The Texas Department of Licensing and Regulation filing, dated Oct. 27, sets construction from Nov. 1, 2026 to Dec. 31, 2028. It assigns no tenant....

Read more
Read IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured
IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional [New South Wales](https://baxtel.com/regions/new-south-wales). The Nasdaq-listed o...

IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured

October 14, 2026 IREN

IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional New South Wales. The Nasdaq-listed operator took the proposal to the local community ahead of a scoping report due to the state's Department of Planning, Housing and...

Read more
Read Iren Powers up Initial Phase of Sweetwater Data Center Campus
Iren Powers up Initial Phase of Sweetwater Data Center Campus

Iren Powers up Initial Phase of Sweetwater Data Center Campus

May 06, 2026 IREN

Data center and cloud firm Iren has energized a new campus in Texas. The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas. The firm’s two Sweetwater campuses, both located outside Sweetwater in Fisher County, are...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.