IREN: Canal Flats, BC

Latest Podcast 9018 Grainger Rd
Operational
Fully operational facility
Operated by:

IREN: Canal Flats, BC

Ownership: IREN owns the building.
Lot Size: 10 acres
░░░░ Request Dataset MW
Total Power

The Canal Flats facility is located in the Canadian Rockies, 100km from Cranbrook regional airport (population 20,000) and 500km east of Vancouver.

Situated on a 10-acre freehold site owned by IREN, the facility has full fiber connectivity and a fabrication workshop that supports our other facilities.

The site is connected to the BC Hydro network (69kV) via a 30MW on-site substation owned by IREN.

The highly skilled management team has significant experience in the management and operation of the data centers. The facility supports approximately 20 full-time local jobs in Canal Flats.

Map and Nearby Locations

9018 Grainger Rd
IREN Sites
Nearby Facilities

IREN: Canal Flats, BC Data Center Photos See all

CANAL FLATS
Source: Baxtel
CANAL FLATS, BC
Source: Baxtel

Operating Company

Operated by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.

15
Facilities
4
Markets

News See all

Read Iren Powers up Initial Phase of Sweetwater Data Center Campus
Iren Powers up Initial Phase of Sweetwater Data Center Campus

Iren Powers up Initial Phase of Sweetwater Data Center Campus

May 06, 2026 IREN

Data center and cloud firm Iren has energized a new campus in Texas. The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas. The firm’s two Sweetwater campuses, both located outside Sweetwater in Fisher County, are...

Read more
Read Bell Canada Plans AI 'Data Center Supercluster'
Bell Canada Plans AI 'Data Center Supercluster'

Bell Canada Plans AI 'Data Center Supercluster'

May 29, 2025 British Columbia

Canadian telecoms operator Bell Canada has launched 'Bell AI Fabric,' a plan to help build AI data centers across the country, starting with six data centers in British Columbia, supported by 500MW of hydroelectric power. The very first facility is set to come online this June, operated by AI...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?