Multi-phase construction project
Operated by:

IREN: Sweetwater

Year Planned: 2026
Lot Size: 1,300 acres

Iren is progressing with significant infrastructure projects, including the development of a 1.4 GW substation at its Sweetwater site, which is expected to be energized by April 2026.