IREN: Galicia Green DC

Latest Podcast Polígono Industrial Teixeiro
Under ConstructionPlanned
Multi-phase construction project
Operated by:

IREN: Galicia Green DC

Year Planned: 2026

The Galicia Green Data Center is a strategic €400 million infrastructure project set to be built in the Curtis-Teixeiro industrial park of Galicia, Spain. Conceived under the Impulsa Galicia public-private partnership and developed by Ingenostrum, its primary mission is to serve as a pivotal turning point for the digitalization of the autonomous community's business and institutional sectors.

The facility will occupy a site of 40,154 m² and represents a significant financial commitment: €130 million is allocated to the construction of the center, while the larger sum of €270 million will be invested in the essential Information Technology (IT) servers. With an initial phase investment of €51 million, the entire data center is projected to become fully operational in 2026.

Map and Nearby Locations

Polígono Industrial Teixeiro
IREN Sites
Nearby Facilities

IREN: Galicia Green DC Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.

0
Facilities
0
Markets

News See all

Read IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured
IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional [New South Wales](https://baxtel.com/regions/new-south-wales). The Nasdaq-listed o...

IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured

October 14, 2026 IREN

IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional New South Wales. The Nasdaq-listed operator took the proposal to the local community ahead of a scoping report due to the state's Department of Planning, Housing and Infrastructure...

Read more
Read Spain Proposes Rules Requiring Data Centers To Source 80% Of Power From New Renewables
Spain is preparing legislation that would require data centers of 1MW or more to source at least 80% of their electricity from new renewable generation on an hourly basis. The draft rules, approved...

Spain Proposes Rules Requiring Data Centers To Source 80% Of Power From New Renewables

August 26, 2026 Spain

Spain is preparing legislation that would require data centers of 1MW or more to source at least 80% of their electricity from new renewable generation on an hourly basis. The draft rules, approved for fast-track legislation, would apply only to new data centers and undergo public consultation...

Read more
Read Iren Powers up Initial Phase of Sweetwater Data Center Campus
Iren Powers up Initial Phase of Sweetwater Data Center Campus

Iren Powers up Initial Phase of Sweetwater Data Center Campus

May 06, 2026 IREN

Data center and cloud firm Iren has energized a new campus in Texas. The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas. The firm’s two Sweetwater campuses, both located outside Sweetwater in Fisher County, are...

Read more
Read Solaria Launches European Data Center Platform
Solaria Launches European Data Center Platform

Solaria Launches European Data Center Platform

November 25, 2025 Spain

Spanish energy firm Solaria Energia has formally launched its European sustainable data center platform. The platform includes approximately 3.4GW of secured grid power across 400 hectares (990 acres) spanning Spain, Italy, Germany, and the UK. In addition, the company has reportedly requested...

Read more
Read Sierra DC Plans New Data Center in Granada, Spain
Sierra DC Plans New Data Center in Granada, Spain

Sierra DC Plans New Data Center in Granada, Spain

October 08, 2025 Spain

Sierra DC has confirmed plans for the construction of a new AI-focused data center in the Industrial and Technological City and Innovation Area (CITAI) of Escúzar, Granada. The investment, for what the company says will be one of the largest facilities of its kind in Spain, is estimated at €1...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?