Yondr Expands into Texas with 550MW Facility
August 20, 2025
Yondr Group
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
| Distance | Site | About |
|---|---|---|
| 0.07 miles | Yondr: Slough 2 |
This facility is part of Yondr's London Slough Campus.
|
| 0.07 miles | Equinix: Wexham Road |
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
| 0.13 miles | Yondr: Slough 3 |
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
|
| 0.56 miles | Gravity Edge: London LDN2 | |
| 1.53 miles | NTT Slough 2 |
|
| 1.59 miles | NTT Slough 3 |
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
| 1.59 miles | Kao Data Slough |
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
| 1.66 miles | Digital Realty: LHR26 |
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
|
| 1.67 miles | Segro: London Slough Campus |
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
|
| 1.70 miles | Digital Realty: LHR27 |
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
|
| 1.73 miles | GTR: Slough |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 1.74 miles | VIRTUS LONDON9 | |
| 1.76 miles | GTR: Slough 2 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 1.77 miles | Lumen Slough |
|
| 1.78 miles | GTR: Slough 3 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 1.78 miles | Rackspace London Slough (LON3) |
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
| 1.79 miles | Segro: Slough 2 |
This planned facility will be part of Segro's London Slough Campus.
|
| 1.80 miles | GoDaddy Slough (HEG) | |
| 1.82 miles | Iron Mountain: LON3 |
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
|
| 1.86 miles | VIRTUS LONDON10 | |
| 1.86 miles | Logicalis Slough | |
| 1.87 miles | Iron Mountain London LON-2 | |
| 1.96 miles | CyrusOne London I |
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
| 1.97 miles | Equinix Slough Campus LD4, LD5, LD6, LD10 |
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
| 1.97 miles | VIRTUS Slough London 3 and 4 |
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
| 2.00 miles | Equinix LD13x | |
| 2.01 miles | VIRTUS London 11 | |
| 2.03 miles | CyrusOne LON5 | |
| 2.04 miles | Equinix LD10 |
|
| 2.16 miles | China Mobile Slough | |
| 2.23 miles | Equinix LD5 |
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
| 2.23 miles | CyrusOne London III |
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
| 2.44 miles | Equinix LD14 | |
| 2.44 miles | Equinix LD12 | |
| 2.51 miles | Equinix LD6 | |
| 2.52 miles | Equinix LD7 |
|
| 2.52 miles | Equinix LD4 |
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
| 2.52 miles | Iron Mountain London LON-1 |
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
| 2.60 miles | Equinix LD11x | |
| 2.64 miles | Virgin Media O2 Slough |
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
| 2.65 miles | Thorney: Iver DC-F |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 2.66 miles | Thorney: Iver DC-E |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 2.67 miles | Thorney: Iver DC-D |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 2.85 miles | Thorney: Iver DC-C |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 2.86 miles | Segro: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 2.87 miles | Thorney: Iver DC-B |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 2.88 miles | Thorney Lane LLP: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 3.00 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
|
| 3.06 miles | Pinewood: Slough Campus |
Pinewood Group, owned by Aermont Capital, has revised its 2023 plans for a 1.4 million sqft film studio expansion west of London.
|
| 3.30 miles | Thorney: Iver DC-A |
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 3.47 miles | CorScale: Court Lane, Iver |
In December 2024, Corscale Data Centers received approval to develop a new campus in London.
|
| 3.57 miles | Tritax: London Slough (Phase 2) |
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
| 3.64 miles | Tritax: London Slough (Phase 1) |
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
| 3.66 miles | CyrusOne: London LON6 |
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
|
| 3.67 miles | CyrusOne: LON6 Bldg2 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 3.69 miles | CyrusOne: LON6 Bldg3 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 3.70 miles | CyrusOne: LON6 Bldg4 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 3.71 miles | CyrusOne: LON6 Bldg5 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 3.73 miles | CyrusOne: LON6 Bldg6 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 3.90 miles | Sequence: Iver, Buckinghamshire |
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
|
| 3.95 miles | West London Tech Bldg2 |
This facility is part of Greystoke's West London Tech Park.
|
| 3.98 miles | West London Tech Park |
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
|
| 4.06 miles | Link Park Heathrow Data Center |
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
|
| 5.28 miles | VIRTUS: London 8 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
| 5.29 miles | VIRTUS: London 7 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
| 5.40 miles | VIRTUS Stockley Park Campus |
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
| 5.42 miles | VIRTUS: London 6 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
| 5.53 miles | DRT London (West Drayton) |
|
| 5.59 miles | Pulsant: Maidenhead SE-2 |
|
| 5.75 miles | CyrusOne London II (Stockley Park) |
The London II datacenter was originally built by Infinity SDC.
|
| 5.86 miles | VIRTUS: London 14 |
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
|
| 6.36 miles | iomart DC5 Maidenhead |
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
|
| 6.54 miles | Rackspace: LON8 |
|
| 7.04 miles | ServerFarm London |
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
|
| 7.06 miles | DataBank: London Heathrow |
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
|
| 7.15 miles | Hyperscale Data Center Request Dataset |
Located in the Silverdale Industrial Estate, this new West London facility is a specialized two-story data center dedicated to AWS tape storage.
|
| 7.18 miles | Marvel: Hayes |
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
|
| 7.39 miles | Ark: Union Park |
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
| 7.63 miles | VIRTUS Hayes London2 |
|
| 7.92 miles | Colt: London 6 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 7.95 miles | Colt: London 5 |
This facility is a part of Colt's London Hayes Campus in West London.
|
| 7.96 miles | Colt: London 7 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 7.97 miles | Colt: London 8 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 7.99 miles | Colt: London Hayes LON4 |
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
| 8.19 miles | Verizon London UK4 | |
| 8.41 miles | QuickHostUK: High Wycombe |
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
|
| 8.42 miles | Stellanor: Hounslow |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 9.14 miles | Ark: Longcross 2 |
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
|
| 9.18 miles | Ark: Longcross |
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
|
| 9.55 miles | Kao Data: Northolt |
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
|
| 9.55 miles | Barclays Data Centre | |
| 10.08 miles | Hyperscale Data Center Request Dataset | |
| 10.16 miles | CentriLogic Berkshire |
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
| 10.40 miles | Level3 Bracknell | |
| 10.61 miles | Keppel: London Bracknell |
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
|
| 10.63 miles | Vodafone: London Bracknell |
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
|
| 11.05 miles | Hyperscale Data Center Request Dataset |
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
|
| 11.14 miles | Lunar 5 |
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
|
| 11.20 miles | CapitaLand: Chess Building |
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
|
| 11.32 miles | CapitaLand: Cressex Business Park |
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
|
| 11.34 miles | DRT London (Cresses Business Park) |
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
|
| 11.60 miles | Redwire: London |
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
|
| 11.78 miles | Wycombe Air Park |
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
|
| 12.20 miles | Stellanor: Byfleet |
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
|
| 13.01 miles | Stellanor: Woking TC3 |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 13.01 miles | NaviSite Woking | |
| 13.02 miles | Ark: Alliance Park |
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
| 13.04 miles | CyrusOne London Woking |
|
| 13.04 miles | Digital Realty Woking |
|
| 13.23 miles | Vision247: London |
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
|
| 13.24 miles | Equinix London LD3 | |
| 13.46 miles | Segro Pure Premier Park |
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
|
| 13.80 miles | Options West London | |
| 13.83 miles | Vantage London II |
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
|
| 13.91 miles | Hyperscale Data Center Request Dataset |
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
| 13.91 miles | Equinix London LD9 Powergate |
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
| 13.95 miles | Colt Powergate |
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
| 13.98 miles | Vantage London I Campus |
Vantage's LHR-1 data center spans 430,000 sq ft (40,000 sqm) across two multi-story data centers.
|
| 14.10 miles | Ark: Elstree Campus |
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
|
| 14.11 miles | Centersquare: Reading LHR3 |
Southern Electric provides power feeds
Power density minimum(W/sf) = 150
|
| 14.12 miles | Ark: Elstree Expansion | |
| 14.16 miles | Echelon LCY20 |
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
|
| 14.75 miles | Gravity Edge: London LDN1 |
Located in Camberley, Gravity Edge LDN1 is a mission-critical data center flagship that bridges the gap between traditional enterprise hosting and the high-density demands of modern AI.
|
| 15.18 miles | Pure DC: Brent Cross |
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
|
| 15.48 miles | iomart: DC12 North London |
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
|
| 15.62 miles | Abbots Langley Data Centre |
|
| 15.80 miles | Virtus: London 18 |
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
|
| 15.82 miles | Virtus: London 17 |
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
|
| 15.87 miles | Virtus: Saunderton Campus |
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings.
|
| 15.89 miles | Virtus: London 16 |
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
|
| 15.91 miles | Digital Realty: London (Chessington) LHR13 |
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
|
| 16.03 miles | Pulsant: Reading SE-4 |
|
| 16.16 miles | Intercity: Elstree |
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
|
| 17.17 miles | Visa United Kingdom | |
| 17.62 miles | Asanti: Farnborough |
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
|
| 17.90 miles | Asanti: Reading |
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
|
| 17.90 miles | Hyperscale Data Center Request Dataset | |
| 18.09 miles | Stellanor: Reading |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 18.12 miles | NTT Hempstead4 |
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
|
| 18.13 miles | Hyperscale Data Center Request Dataset | |
| 18.13 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services UK Limited has filed plans to develop a new tape library data center at Plot 3, Maylands Avenue, Hemel Hempstead, Hertfordshire (HP2 4FQ), outside London. The project covers a 0.6-hectare (1.48-acre) site and involves construction of a two-story, 1,935 sqm (20,840 sq ft) facility. The application was validated in February 2026 and is currently in the planning stage.
|
| 18.14 miles | Pulsant: Reading SE-3 |
|
| 18.16 miles | Amito Reading | |
| 18.25 miles | Northtree: Hemel Hempstead |
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
|
| 18.29 miles | NTT Hempstead 3 |
|
| 18.42 miles | NTT Hempstead 2 |
|
| 18.42 miles | NTT Hempstead 1 |
|
| 18.57 miles | Datum FRN1 |
|
| 18.63 miles | Zenium London One |
|
| 18.64 miles | Ark: Cody Park |
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
|
| 19.12 miles | Smallworld: Guildford |
|
| 19.29 miles | Verizon London UK5 | |
| 19.45 miles | Carrier-Neutral Data Center Request Dataset | |
| 19.45 miles | NTT: London LON2 |
NTT Data has acquired a 26.3-acre plot of land in London, UK, for its eighth data center in the market.
|
| 19.77 miles | Equinix: Hertfordshire Expansion | |
| 19.79 miles | Equinix: Hertfordshire Campus (DC01UK) |
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
|
| 19.80 miles | aptum London |
Yondr is a data center developer and operator that builds and operates dedicated capacity for hyperscale cloud and technology clients. The company’s markets include Northern Virginia and Toronto in the Americas; London, Frankfurt, Amsterdam, and Berlin in Europe; and Johor, Jakarta, and Tokyo in Asia.
DigitalBridge and La Caisse completed the acquisition of Yondr on July 1, 2025. Yondr exited its EverYondr joint venture in India later that month.
August 20, 2025
Yondr Group
July 16, 2025
Yondr Group
July 12, 2025
Yondr Group
November 19, 2024
Yondr Group
August 25, 2024
Yondr Group
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas