DRT London (Cresses Business Park)

Latest Podcast Phoenix House
Operational
Fully operational facility
Operated by:

DRT London (Cresses Business Park)

Year Built: 2009
This site is leased from CapitaLand in the CapitaLand: Cressex Business Park building
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021. Digital Realty acquired the site in 2007 and opened the two-storey data centre in 2009.

Map and Nearby Locations

Phoenix House
Digital Realty Trust Sites
Nearby Facilities

DRT London (Cresses Business Park) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DRT London (Cresses Business Park)

Distance Site About
0.02 miles CapitaLand: Cressex Business Park
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
1.48 miles Wycombe Air Park
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
3.08 miles QuickHostUK: High Wycombe
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
4.67 miles Virtus: London 17
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
4.67 miles Virtus: London 18
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
4.74 miles Virtus: London 15
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings.
4.74 miles Virtus: London 16
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
6.71 miles iomart DC5 Maidenhead
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
8.13 miles SDC: M40 Campus
The SDC M40 Campus is a planned £2 billion hyperscale data center development in Buckinghamshire, UK, backed by a partnership between US-based SDC Capital Partners and environmental utilities giant Veolia.
8.81 miles Pulsant: Maidenhead SE-2
8.95 miles Virgin Media O2 Slough
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
8.97 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
9.00 miles Equinix LD7
9.03 miles Equinix LD11x
9.05 miles Equinix LD6
9.07 miles Equinix LD12
9.08 miles Equinix LD14
9.09 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
9.22 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
9.33 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
9.45 miles CyrusOne London I
CyrusOne London I (LON1) is the former Zenium London One at 12 Liverpool Road on the Slough Trading Estate: one two-storey building with about 4,300 sq m of technical space. CyrusOne acquired it with Zenium in 2018.
9.47 miles China Mobile Slough
9.47 miles Echelon LCY20
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
9.47 miles Equinix LD10
9.50 miles Equinix LD13x
9.54 miles VIRTUS: London 4
LONDON4 is the former Infinity SDC Slough data centre on Liverpool Road, which VIRTUS bought in 2015. It anchors the VIRTUS Slough campus and hosts the Jisc Shared Data Centre.
9.57 miles VIRTUS: London 3
LONDON3 is a SEGRO-built extension next to VIRTUS's LONDON4 on Liverpool Road, Slough, linked directly to it. VIRTUS signed a 20-year lease in 2017 and completed the fit-out in December 2018.
9.59 miles VIRTUS: London 11
9.62 miles VIRTUS: London 10
9.62 miles VIRTUS: London 19
VIRTUS Data Centres plans to add a new high-density, carrier-neutral facility at the Slough Trading Estate. SEGRO will develop the powered-shell building, while VIRTUS will complete the specialist data-centre fit-out and operate the facility.
9.63 miles VIRTUS: London 12
LONDON12 is VIRTUS's newest operating building on its Slough campus, at 485 Berkshire Avenue on the Slough Trading Estate. Fit-out finished in early 2026.
9.65 miles Iron Mountain: LON-2
LON-2 is a 269,000 square foot data center at 110 Buckingham Avenue in the Slough Trading Estate.
9.66 miles Logicalis Slough
9.67 miles Lumen Slough
9.69 miles Iron Mountain: LON-3
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
9.71 miles GoDaddy Slough (HEG)
9.71 miles CyrusOne LON5
9.72 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
9.81 miles VIRTUS: London 9
9.83 miles GTR: Slough 1
Building 1 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The western block, and the first one GTR fitted out.
9.89 miles GTR: Slough 2
Building 2 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The middle block.
9.90 miles Segro: 210 Bath Road
Planned data center by Segro at 210 Bath Road, Slough, on the site of the former UCB and Black & Decker offices. Outline planning permission granted in 2024; detailed design to follow.
9.92 miles Digital Realty: LHR27
LHR27 is building B of Digital Realty's Slough campus at 631 Ajax Avenue, Slough Trading Estate, 15 minutes from London Heathrow.
9.94 miles GTR: Slough 3
Building 3 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The eastern block.
9.96 miles Digital Realty: LHR26
LHR26 is building A of Digital Realty's Slough campus at 630 Ajax Avenue, Slough Trading Estate. Digital Realty acquired the former Cyxtera LHR1 site in 2024.
9.98 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
10.01 miles Segro: 200 Bath Road
Planned three-storey powered-shell data center by Segro at 200 Bath Road, Slough, on the site of the former Unatrac, Ipsen and BlackBerry offices. Full planning permission granted in 2024.
10.05 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
10.06 miles NTT Slough 2
11.34 miles Yondr: Slough 1
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
11.34 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
11.35 miles Yondr: Slough 2
This facility is part of Yondr's London Slough Campus.
11.40 miles Yondr: Slough 3
Yondr’s Slough 3 data center is the third facility on the company’s London campus, expanding its hyperscale presence on a former industrial site in one of the UK’s main data center markets.
11.86 miles Pinewood South: Buckinghamshire Campus
The Pinewood South Data Centre is a planned £1 billion ($1.3bn) hyperscale-ready campus located on a 19.5-hectare site directly south of Pinewood Studios in Iver Heath, Buckinghamshire.
12.06 miles CyrusOne: LON6 Bldg1
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
12.11 miles CyrusOne: LON6 Bldg2
This facility will be part of CyrusOne's LON6 Campus in London.
12.18 miles CyrusOne: LON6 Bldg3
This facility will be part of CyrusOne's LON6 Campus in London.
12.24 miles CyrusOne: LON6 Bldg4
This facility will be part of CyrusOne's LON6 Campus in London.
12.29 miles CyrusOne: LON6 Bldg5
This facility will be part of CyrusOne's LON6 Campus in London.
12.35 miles CyrusOne: LON6 Bldg6
This facility will be part of CyrusOne's LON6 Campus in London.
12.75 miles Thames Valley Park DC
A data center has been proposed to redevelop office space previously used by Microsoft at Thames Valley Park in Reading, UK.
12.81 miles Global HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.97 miles Mulberry: Denham, Uxbridge
Developer Mulberry Commercial Developments II is planning to build a hyperscale data center on a greenbelt site near the village of Denham in Buckinghamshire, UK.
13.25 miles Pulsant: Reading SE-4
13.37 miles Sequence: Iver, Buckinghamshire
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
13.44 miles Centersquare: Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
13.53 miles Thorney: Iver DC-F
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
13.57 miles Thorney: Iver DC-E
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
13.60 miles Thorney: Iver DC-D
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
13.62 miles West London Tech Bldg1
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
13.63 miles West London Tech Bldg2
This facility is part of Greystoke's West London Tech Park.
13.66 miles Thorney: Iver DC-C
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
13.70 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.72 miles Thorney: Iver DC-B
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
13.75 miles Segro: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
13.77 miles Thorney Lane LLP: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
13.82 miles Thorney: Iver DC-A
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
14.05 miles Keppel: London Bracknell
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
14.06 miles Vodafone: London Bracknell
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
14.08 miles CorScale: Court Lane 2
This is the second building at CorScale's Court Lane Campus in Iver, Buckinghamshire.
14.08 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
14.11 miles CorScale: Court Lane 1
In December 2024, Corscale Data Centers secured planning approval for its first UK project, the Corscale Court Lane Data Center in Iver, Buckinghamshire.
14.17 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.23 miles Level3 Bracknell
14.91 miles Tritax: Manor Farm (Phase 2)
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
14.93 miles Link Park Heathrow Data Center
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
14.98 miles Tritax: Manor Farm (Phase 1)
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
15.17 miles Lunar 5
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
15.18 miles CapitaLand: Chess Building
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
15.77 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
15.77 miles Asanti: Reading
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
15.79 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
15.82 miles Amito Reading
15.83 miles Pulsant: Reading SE-3
15.89 miles VIRTUS: London 6
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
15.91 miles VIRTUS: London 5
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
16.05 miles Stellanor: Reading
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
16.40 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
16.45 miles VIRTUS: London 14
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
16.67 miles DRT London (West Drayton)
17.02 miles Abbots Langley Data Centre
17.14 miles Rackspace: LON8
17.45 miles Hyperscale Data CenterInterested in this information?Contact us
17.50 miles Ridge ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.56 miles Northtree: Hemel Hempstead
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
17.57 miles NTT Hempstead 2
17.62 miles West PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.64 miles Marvel: Hayes
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
17.64 miles NTT Hempstead 3
17.70 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
17.72 miles Metro RidgeInterested in this information?Contact us
17.76 miles NTT Hempstead 1
17.90 miles Ark: Union Park
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
18.09 miles GTR: Southall 2
Data Centre 2 of GTR's GB Two campus in Southall, a four-storey building matching Data Centre 1 in the middle of the plot along the Grand Union Canal, in the first build phase.
18.09 miles Colt: London 8
This planned facility is part of Colt's London Hayes Campus in West London.
18.09 miles GTR: Southall 1
Data Centre 1 of GTR's GB Two campus in Southall, a four-storey building at the north end of the data centre plot next to the campus substations, in the first build phase.
18.10 miles GTR: Southall 4
Data Centre 4 of GTR's GB Two campus in Southall, the south-west half of the large southern building it shares with Data Centre 3, near Bulls Bridge, in the second build phase.
18.10 miles GTR: Southall 3
Data Centre 3 of GTR's GB Two campus in Southall, the north-east half of the large southern building it shares with Data Centre 4, in the second build phase.
18.12 miles Colt: London 6
This planned facility is part of Colt's London Hayes Campus in West London.
18.13 miles Colt: London 7
This planned facility is part of Colt's London Hayes Campus in West London.
18.17 miles Colt: London 5
This facility is a part of Colt's London Hayes Campus in West London.
18.22 miles Colt: London 4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
18.25 miles VIRTUS Hayes London2
18.35 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
18.38 miles ServerFarm London
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
18.39 miles Ark: Longcross 1
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
18.40 miles DataBank: London Heathrow
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
18.56 miles Kao Data: Northolt
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
18.57 miles Barclays Data Centre
18.59 miles Creslow Park
Creslow Park is a data center located in a rural area of Buckinghamshire, United Kingdom.
18.69 miles Ark: Elstree Campus
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
18.73 miles Ark: Elstree Expansion
18.92 miles Brixton Heathrow Estate DC
Heathrow Estate Data Centre is a planned facility at Haslemere Heathrow Estate in Cranford, Hounslow.
19.33 miles CyrusOne: Southall LON7
CyrusOne has secured planning permission from Ealing Council to transform the historic former "Honey Monster Factory" site in Southall, West London, into a state-of-the-art data center campus.
19.36 miles Verizon London UK4
19.47 miles Stellanor: Hounslow
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
19.82 miles Gravity Edge: London LDN1
Gravity Edge LDN1 is a 145,585 sq ft, 5.4-acre freehold data center campus in Yorktown Business Park, Camberley, west of London, with 36 MVA of secured SSEN grid supply, 8 MW operating and a brownfield expansion to 22 MW underway.
19.82 miles Gravity Edge: London LDN2
Gravity Edge LDN2 is a 2 MW HPC pod block on the LDN1 campus at Stanhope Road, Camberley, with a roadmap to 5 MW.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to build...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?