In April 2024, nLighten acquired the site from Exa Infrastructure.
In May 2018, GTT acquired the London site in a $2.3 billion acquisition of Interoute. (TR PR Source)
ISO 27001
ISO 20000
PCI DSS
ISAE 3402 / SSAE 16
Distance | Site | About |
---|---|---|
0.33 miles | AIMES DC3 Mastmaker Road | |
0.37 miles | Digital Meridian Gate (215 Marsh) |
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
|
0.45 miles | Digital Sovereign House (227 Marsh Wall) |
|
0.45 miles | Equinix London LD8 Harbour Exchange (Docklands) |
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
0.50 miles | DRT London (Bonnington House) |
|
0.54 miles | Digital Docklands: Cloud House | |
0.63 miles | Echelon LCY10 |
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
|
0.65 miles | Cyxtera London LO3 & LO4 |
|
0.65 miles | Keppel GV7 London |
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
0.66 miles | City Reach London Docklands |
|
0.67 miles | Telehouse South |
Telehouse is expanding its Telehouse South facility in London, UK.
|
0.68 miles | Coreix Docklands | |
0.71 miles | Level3 London (E India Dock) | |
0.78 miles | Global Switch: London South |
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
0.79 miles | GTT London GS2 |
|
0.79 miles | Global Switch London Docklands Campus |
|
0.84 miles | Telehouse London Docklands (North, East, West) |
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
0.84 miles | Verizon London THW | |
1.26 miles | Kao Data: Bidder Street, Newham |
A new data center named as Bidder Street Data Center has been proposed in the Newham area of East London, UK. At full build out the multi-story data center will total approximately 60,510 sqm (651,325 sq ft).
|
1.35 miles | Netwise London East (NLE) |
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
1.73 miles | Colt London I | |
2.23 miles | Level3 London (120 Leman) | |
2.30 miles | Netwise London Central |
The Old Jamaica Road data center officially began operations in 2016. It features two data halls in 11,000 sq ft of space with a combined 6,000 sq ft of white space, accommodating 200 racks.
|
2.43 miles | Level3 London (Braham) | |
2.59 miles | Interxion London 2 | |
2.61 miles | Internap London | |
2.64 miles | Interxion LON1 LON3 |
|
2.97 miles | Colt House London | |
2.99 miles | Infinity SDC HereEast |
|
3.07 miles | Telehouse London Metro |
|
3.07 miles | Redcentric London |
|
3.13 miles | iomart DC2 London |
|
3.19 miles | Epsilon London Telephone House | |
3.26 miles | 1 Olivers Yard - Digital Realty |
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
3.74 miles | Level3 London (10 Fleet) | |
3.80 miles | Volta EC1 |
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
|
4.07 miles | Lumen: Goswell Rd |
|
4.37 miles | aptum London | |
5.39 miles | Verizon London UK5 | |
5.54 miles | Zenium London One |
|
7.05 miles | Visa United Kingdom | |
7.95 miles | OVH London LON-1 |
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
8.04 miles | Ark: Meridian Park | |
8.82 miles | NTT London 1 (Dagenham) |
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
9.78 miles | DRT London (Croydon) | |
9.79 miles | Infinity Romford North and South |
|
9.84 miles | Green Mountain: London East |
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
9.85 miles | Green Mountain: London East Bldg 2 |
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
10.18 miles | LDeX London LDeX1 | |
10.33 miles | Vantage London I Campus |
|
10.35 miles | VIRTUS London1 Enfield |
|
10.42 miles | Microsoft: Park Royal |
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
10.44 miles | Colt Powergate |
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
10.44 miles | Equinix London LD9 Powergate |
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
10.59 miles | Coreix Enfield | |
10.60 miles | Vantage London II |
|
10.64 miles | Options West London | |
11.09 miles | Equinix London LD3 | |
11.26 miles | Ark: Alliance Park |
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
11.28 miles | Pulsant South London | |
12.40 miles | Custodian Dartford DA2 | |
12.56 miles | Redwire | |
12.82 miles | Google: Purfleet |
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
|
13.40 miles | Google: Waltham Cross |
Google has started building a new data centre in Waltham Cross, Hertfordshire.
|
14.99 miles | DRT London (Chessington) |
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
|
15.13 miles | Barclays Data Centre | |
15.13 miles | Kao Data: Northolt |
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
|
16.17 miles | Colt: London 4 |
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
16.51 miles | Redcentric Hounslow | |
16.62 miles | VIRTUS Hayes London2 |
|
16.64 miles | Google: North Weald Airfield |
Google paid a£88.2 million for 52 acres (21 hectares) of land at a former RAF airbase.
|
16.80 miles | Ark: Union Park |
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
17.06 miles | Verizon London UK4 | |
18.31 miles | VIRTUS: London 14 |
The data center, currently under construction, will span two floors upon completion. It will offer 8,600 square meters of white space divided among 6 data halls.
|
18.44 miles | CyrusOne London II (Stockley Park) |
The London II datacenter was originally built by Infinity SDC.
|
18.54 miles | CyrusOne: London II | |
18.70 miles | Digital Redhill (Foxboro Park) |
1 Foxboro Park, Redhill is fully leased
2 Foxboro Park, Redhill is fully leased |
18.71 miles | LexisNexis Redhill UK |
|
18.73 miles | Digital Realty: LGW11 | |
18.73 miles | VIRTUS: London 6 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
18.75 miles | VIRTUS Stockley Park Campus |
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
18.86 miles | VIRTUS: London 7 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
18.88 miles | VIRTUS: London 8 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
19.09 miles | DRT London (West Drayton) |
|
19.18 miles | ServerFarm London |
3,000 m² of data hall expansion space available within 6 – 9 months
Concurrently maintainable standards
|
19.38 miles | Kao Data: Harlow |
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
19.44 miles | Kao Data: Harlow 2 |
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
19.46 miles | Kao Data: Harlow 3 |
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
19.53 miles | Kao Data: Harlow 4 |
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
nLighten is a digital infrastructure platform owned by I Squared Capital, a leading global infrastructure investor. The company is developing innovative edge data centers distributed across European key economic hubs to provide best-in-class network access to regional, national, and global enterprises, private users, and the mobile workforce. Through the strategic distribution of its edge data centers, nLighten is working towards establishing a pan-European presence in all major cities and providing access to low latency and proximity to end users across Europe.
The edge data centers developed by nLighten are designed to meet the increasing demand for faster and more reliable data processing and storage, while also being mindful of environmental impact. nLighten was founded in 2021 by a core team with many years of experience and wide-ranging expertise in the data center sector. The team's main motivation was to create the next step for the data center industry and align edge data centers with the green transition.
nLighten's goal is to build and operate the leading pan-European edge data center platform. The company's focus on strategic locations, low latency, and environmental consciousness positions it as an innovative player in the European digital infrastructure landscape.