Coreix Enfield

Refuge House

░░░ Contact Us to subscribe to our data service MW Total Power

Operated by:

Map and Nearby Locations:

Refuge House (4th Floor Refuge House)
Click Map to begin Search

Sites within 15 miles of Coreix Enfield

Show SqM
Distance Site About
0.96 miles VIRTUS London1 Enfield
2.77 miles Ark: Meridian Park
3.37 miles Google: Waltham Cross
Google has started building a new data centre in Waltham Cross, Hertfordshire.
7.65 miles Infinity SDC HereEast
8.41 miles Verizon London UK5
8.55 miles Lumen: Goswell Rd
8.78 miles LDeX London LDeX1
8.84 miles Epsilon London Telephone House
8.89 miles 1 Olivers Yard - Digital Realty
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
8.89 miles Colt House London
8.98 miles Redcentric London
8.98 miles iomart DC2 London
9.01 miles Volta EC1
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
9.03 miles Telehouse London Metro
9.06 miles Internap London
9.10 miles Interxion London 2
9.15 miles Interxion LON1 LON3
9.59 miles Level3 London (10 Fleet)
9.60 miles Level3 London (Braham)
9.73 miles Netwise London East (NLE)
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
9.80 miles Level3 London (120 Leman)
9.98 miles aptum London
10.01 miles Colt London I
10.01 miles Kao Data: Bidder Street, Newham
A new data center named as Bidder Street Data Center has been proposed in the Newham area of East London, UK. At full build out the multi-story data center will total approximately 60,510 sqm (651,325 sq ft).
10.18 miles Zenium London One
10.25 miles Visa United Kingdom
10.26 miles Level3 London (E India Dock)
10.28 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
10.28 miles Verizon London THW
10.29 miles GTT London GS2
10.31 miles Global Switch London Docklands Campus
10.32 miles Global Switch: London South
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
10.44 miles Coreix Docklands
10.57 miles Telehouse South
Telehouse is expanding its Telehouse South facility in London, UK.
10.59 miles nLighten: London Citi
In April 2024, nLighten acquired the site from Exa Infrastructure.
10.74 miles Netwise London Central
The Old Jamaica Road data center officially began operations in 2016. It features two data halls in 11,000 sq ft of space with a combined 6,000 sq ft of white space, accommodating 200 racks.
10.86 miles AIMES DC3 Mastmaker Road
10.89 miles Digital Meridian Gate (215 Marsh)
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
10.97 miles Digital Sovereign House (227 Marsh Wall)
11.03 miles Equinix London LD8 Harbour Exchange (Docklands)
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
11.07 miles DRT London (Bonnington House)
11.11 miles Digital Docklands: Cloud House
11.12 miles Google: North Weald Airfield
Google paid a£88.2 million for 52 acres (21 hectares) of land at a former RAF airbase.
11.13 miles INAP North London
INAP's North London data center is located within Colt's facility on Black Fan Road
11.13 miles Colt London North: Welwyn Garden City
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
11.19 miles Echelon LCY10
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
11.22 miles Cyxtera London LO3 & LO4
11.22 miles Keppel GV7 London
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
11.23 miles City Reach London Docklands
11.33 miles Options West London
11.35 miles Colt Powergate
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
11.44 miles Equinix London LD9 Powergate
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
11.47 miles Green Mountain: London East
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
11.50 miles Infinity Romford North and South
11.54 miles Vantage London I Campus
11.55 miles Microsoft: Park Royal
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
11.56 miles Green Mountain: London East Bldg 2
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
11.70 miles Vantage London II
11.97 miles Equinix London LD3
11.97 miles Kao Data: Harlow
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.01 miles Kao Data: Harlow 2
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.06 miles Kao Data: Harlow 3
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.10 miles Kao Data: Harlow 4
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.26 miles Ark: Alliance Park
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
13.05 miles NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
13.89 miles Redwire
14.35 miles Barclays Data Centre
14.36 miles Kao Data: Northolt
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
15.00 miles DRT London (Chess Building)
15.24 miles OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
16.78 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
16.81 miles Colt: London 4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
17.11 miles NTT Hempstead 1
17.12 miles NTT Hempstead 3
17.42 miles NTT Hempstead 2
17.66 miles Ark: Union Park
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
17.74 miles VIRTUS Hayes London2
18.76 miles DRT London (Croydon)
18.76 miles VIRTUS: London 14
The data center, currently under construction, will span two floors upon completion. It will offer 8,600 square meters of white space divided among 6 data halls.
18.79 miles Redcentric Hounslow
18.87 miles Google: Purfleet
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
18.90 miles VIRTUS: London 6
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
18.93 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
18.95 miles VIRTUS Stockley Park Campus
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
19.00 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
19.04 miles CyrusOne: London II
19.05 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
19.44 miles Verizon London UK4
19.95 miles Custodian Dartford DA2

Coreix Enfield Data Center Photos

Operating Company

Coreix Limited is a London based managed hosting, colocation and network services provider .

2 Facilities Owned
2 Markets Served
8.0 Megawatts
View Company

News

Read More News