The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London. The facility, and adjacent available land, is operated by Green Mountain - its first data center outside of Norway.

  • Total space in building: 11.000m2
  • Land footprint: 8.6 acres
  • Grid supplies: 2N
  • Power source: 100% certified renewable power

Map and Nearby Locations:

3 King George Cl
Click Map to begin Search

Sites within 15 miles of Green Mountain: London East

Show SqM
Distance Site About
0.09 miles Infinity Romford North and South
0.11 miles Green Mountain: London East Bldg 2
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
2.76 miles NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
6.49 miles Netwise London East (NLE)
6.56 miles OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
8.05 miles Google: Purfleet
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
8.59 miles Kao Data: Bidder Street, Newham
A new data center named as Bidder Street Data Center has been proposed in the Newham area of East London, UK. At full build out the multi-story data center will total approximately 60,510 sqm (651,325 sq ft).
8.69 miles Infinity SDC HereEast
9.00 miles Verizon London THW
9.00 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
9.05 miles Global Switch London Docklands Campus
9.05 miles GTT London GS2
9.06 miles Global Switch: London South
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
9.06 miles Google: North Weald Airfield
Google paid a£88.2 million for 52 acres (21 hectares) of land at a former RAF airbase.
9.13 miles Level3 London (E India Dock)
9.20 miles Telehouse South
Telehouse is expanding its Telehouse South facility in London, UK.
9.25 miles Ark: Meridian Park
9.76 miles Digital Meridian Gate (215 Marsh)
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
9.77 miles Digital Sovereign House (227 Marsh Wall)
9.84 miles GTT London Citi
9.96 miles Equinix London LD8 Harbour Exchange (Docklands)
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
10.02 miles Custodian Dartford DA2
10.12 miles AIMES DC3 Mastmaker Road
10.15 miles Digital Docklands: Cloud House
10.16 miles DRT London (Bonnington House)
10.23 miles Echelon LCY10
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
10.24 miles City Reach London Docklands
10.25 miles Keppel GV7 London
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
10.25 miles Cyxtera London LO3 & LO4
10.39 miles Coreix Docklands
10.58 miles VIRTUS London1 Enfield
11.11 miles Colt London I
11.24 miles Internap London
11.27 miles Interxion London 2
11.36 miles Interxion LON1 LON3
11.44 miles Level3 London (120 Leman)
11.47 miles Coreix Enfield
11.48 miles Colt House London
11.50 miles Level3 London (Braham)
11.65 miles Redcentric London
11.66 miles Epsilon London Telephone House
11.69 miles Telehouse London Metro
11.72 miles iomart DC2 London
11.76 miles 1 Olivers Yard - Digital Realty
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
11.90 miles Google: Waltham Cross
Google has started building a new data centre in Waltham Cross, Hertfordshire.
11.97 miles Netwise London Central
12.29 miles Level3 London (Goswell)
12.37 miles Volta EC1
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
12.68 miles Level3 London (10 Fleet)
12.69 miles Kao Data: Harlow
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.75 miles Kao Data: Harlow 3
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.75 miles Kao Data: Harlow 2
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
12.82 miles Kao Data: Harlow 4
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
13.38 miles Verizon London UK5
13.41 miles aptum London
13.61 miles NYSE Basildon
14.47 miles Zenium London One
15.69 miles Visa United Kingdom
17.18 miles LDeX London LDeX1
18.63 miles Colt Powergate
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
18.64 miles Vantage London I Campus
18.68 miles Equinix London LD9 Powergate
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
18.71 miles Microsoft: Park Royal
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
18.76 miles Options West London
18.90 miles Vantage London II
19.25 miles DRT London (Croydon)
19.35 miles Equinix London LD3
19.60 miles Ark: Alliance Park
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.

Green Mountain: London East Data Center Photos

Operating Company

Green Mountain AS design build and operate high security, robust wholesale colocation data centres.

The companyhas two data centres in Norway with plans to develop in other regions. The data centres operate on 100% low cost renewable power and use of free cooling creating unique power efficiency. Both data centres, DC1-Stavanger and DC2-Telemark have achieved Uptime Institute Tier III certification as the only Nordic colocation provider. In addition both data centres have the ISO 9001 and ISO 14001 certifications in place.

The data centre near Stavanger (DC1-Stavanger) is built deep inside a mountain in a former high security NATO ammunition store.

The data centre in Telemark (DC2-Telemark) is in the ‘cradle of hydro power’ in Norway with multiple local hydro power plants.

Smedvig is the majority owner of Green Mountain.

10 Facilities Owned
4 Markets Served
View Company

News