365 Alpharetta

Latest Podcast 11650 Great Oaks Way
Operational
Fully operational facility
Operated by:

365 Alpharetta

Year Built: 1999
Utility Provider: Georgia Power
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

This Alpharetta, Georgia data center was purpose-built in 1999 as SunGard Availability Services' ATL-11650 single-tenant disaster-recovery and colocation facility. Unlike many of SunGard's East Coast sites, ATL-11650 did not come through the November 2001 Comdisco Availability Solutions acquisition — SunGard operated it from inception.

In 2021, the underlying real estate was sold to Mapletree Industrial Trust for $27M; 365 Data Centers continues to operate the facility as the tenant. The site transferred into 365's portfolio as part of the broader SunGard colocation portfolio acquisition.

  • (2) Conference rooms
  • (2) Break rooms
  • 24/7 Network operations center

Power

  • (4) redundant 1500 kVA UPS banks (4.15 MW total capacity)
  • (2) redundant 750 kVA UPS banks
  • (2) redundant 500 kVA UPS banks
  • 1,500 kVA Cummins Synergy generator with 4,000 gallon fuel tank
  • 1,600 kVA Baldor generator with 3,600 gallon fuel tank
  • 1,250 kVA CAT generator with 2,000 gallon fuel tank
  • 2,000 kVA Cummins Synergy generators with 4,000 gallon tanks
  • (2) 2000 kVA CAT generators with (2) 4000 gallon tanks
  • (4) independent loop-fed utility power feeds

Map and Nearby Locations

11650 Great Oaks Way
365 Data Centers Sites
Nearby Facilities

365 Alpharetta Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of 365 Alpharetta

Distance Site
0.20 miles AT&T: Alpharetta (Great Oaks Way)
0.46 miles GI Partners: Alpharetta
0.98 miles Stack: ATL01A
1.08 miles Stack: ATL01B
1.33 miles Lincoln: Alpharetta, GA
1.60 miles Apotech: Atlanta 1
1.80 miles AT&T: Alpharetta (North Point)
2.01 miles Flexential Atlanta-Alpharetta
2.44 miles ADP: Alpharetta DC1
3.03 miles Strategic Datasphere: Alpharetta, Georgia
3.08 miles PureColo: Alpharetta (1001 Windward)
4.30 miles NTT DATA: Alpharetta (ex-UPS Windward)
6.47 miles Fiserv: Johns Creek
6.94 miles TwoInterested in this information?Contact us
8.60 miles Flexential Atlanta-Norcross 2
8.62 miles Flexential Atlanta-Norcross 1
9.03 miles Equinix Atlanta AT5
9.93 miles Internap Atlanta: 40 Perimeter Center
9.95 miles Alembic: Dunwoody (40 Perimeter Center)
10.63 miles OneInterested in this information?Contact us
10.95 miles Lumen Doraville 1
12.11 miles Server Farm Atlanta
12.27 miles QTS: Suwanee 1 DC1
12.36 miles QTS: Suwanee 1 Expansion
12.45 miles QTS: Suwanee 1 DC2
15.30 miles CoreSite: Atlanta AT2
15.46 miles Prime Group: Edge GA10, Marietta
15.54 miles Equinix Atlanta AT4
16.31 miles Coloblox: ATL1
16.52 miles Coloblox: ATL2
16.71 miles Grindcap: Marietta 2
16.79 miles Grindcap: Marietta 1

365 Alpharetta Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

365 Leadership

365’s CEO is Bob DeSantis, who co-founded Xand, a data center provider acquired in 2014 by TierPoint

365 Exited Markets

In 2016 and 2017, the company exited Western Markets: Phoenix, Emeryville, Seattle, San Jose,

365 Overview

365 Data Centers is a leading provider of hybrid data center solutions in ten strategic edge markets. With data centers in Boca Raton, Buffalo, Chicago, Detroit, Fort Lauderdale, Indianapolis, Nashville, Philadelphia, New York and Tampa, the company offers a combined 195,000 square feet and 13 MW of power in place to serve clients. The company is carrier-neutral and offers Colocation, Network, IP, DRaaS, Cloud compute and storage, and Business Continuity services. 365 Data Centers is headquartered in Norwalk, Connecticut.

In September 2017, 365 Data Centers acquired hybrid data center and cloud services provider Host.net. The acquisition added Boca Raton and Fort Lauderdale facilities to 365 Data Center’s locations and allowed the company to offer enhanced services, including nationwide Metro Ethernet, long haul, and MPLS network/transport services, robust blended IP choices, direct, low latency connectivity to the NAP of the Americas and cloud/colocation hybrid solutions.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read DC BLOX Files For Third Atlanta West Building, 80MW Due In 2029
DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, [Data Center Dynamics reported](https://www.datacenterdynamics.com/en/news/dc-blox-...

DC BLOX Files For Third Atlanta West Building, 80MW Due In 2029

November 19, 2026 DC BLOX

DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, Data Center Dynamics reported. The filing with the Georgia Department of Community Affairs covers ATL1-C, a 500,000-square-foot data center at 1800 North River Road in Douglasville....

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

November 18, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read 365 Data Centers CEO Bob DeSantis to Retire
365 Data Centers CEO Bob DeSantis to Retire

365 Data Centers CEO Bob DeSantis to Retire

October 07, 2025 365 Data Centers

Bob DeSantis, the co-founder and CEO of US operator 365 Data Centers, is to retire. The company announced the news this week, and DeSantis has initiated the transition of his responsibilities to the company’s chief revenue officer, Derek Gillespie, and CFO Steve Amelio, who has been promoted to...

Read more
Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.