Iozera: Houston, TX

Site was first built in 2008 and has expansions through 2027
░░░ Request Dataset MW
Total Power

Iozera has acquired an operational enterprise data center in Houston, Texas, with plans to transform it into a cutting-edge, AI-ready multi-tenant hub capable of hosting Nvidia Blackwell GPUs.

The modernized facility will feature ZutaCore's HyperCool waterless, direct-to-chip liquid cooling, supporting densities up to 140kW per rack. Taiwan's Pegatron will supply the GPU servers. The site is currently operating under a short-term leaseback agreement with Men's Wearhouse (Tailored Brands).

Map and Nearby Locations

11631 Roark Rd
Iozera.ai Sites
Nearby Facilities

Iozera: Houston, TX Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Iozera: Houston, TX

Distance Site About
4.45 miles Windstream: Sugar Land, TX
A switch and data center facility that serves as an interconnected transmission site for routing telecommunication traffic across the network.
4.51 miles Prescott Realty Group-5959 Corporate
8.65 miles LOGIX 4635 Southwest Fwy
The site was previously operated by Alpheus Communications before it was acquired by Logix.
9.01 miles DataBank Houston Galleria
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
10.59 miles Verizon: 2401 Portsmouth
Former XO Communications site
13.44 miles DataCanopy: Houston, TX
13.46 miles Databank Westway Park III
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
13.48 miles DataBank Westway Park II
13.49 miles DataBank Westway Park I
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
13.94 miles Verizon: 1301 Fannin
13.94 miles 1301 Fannin - Netrality Houston
1301 Fannin Street is a 25 story 1.1 million square building which was acquired in 2015 by Netrality. 1301 Fannin is the primary telecom hotel and interconnection point in Houston. Netrality operates as a carrier-neutral facility manages the Meet Me Room
14.12 miles Two Shell Plaza (777 Walker)
14.12 miles LOGIX Houston (777 Walker)
The 777 Walker data center is only one city block from the Alpheus fiber network hub at 1010 Travis, and is interconnected with it on a high capacity DWDM system.
14.36 miles Quasar Data Center Houston
14.77 miles EdgeConneX Houston
Customer work spaces are available Raised Floor: 30" EdgeConnex has rights to adjacent space to accommodate expansion.
14.77 miles ScaleMatrix Houston
The Scalematrix site can expand by an additional 15,000 Square Feet
14.77 miles LOGIX Primewest Pkw
The site was operated by Alpheus before Logix acquired it in January 2018.
15.35 miles Lumen Houston 4
15.58 miles Lumen: Houston 5
15.60 miles Lumen Houston 3
15.64 miles Element Critical Houston One
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
15.67 miles Element Critical: Houston One Bldg-2
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.

Iozera: Houston, TX Data Center Photos See all

Operating Company

Operated by:
1
Facilities
1
Markets
5MW
Megawatts

News See all

Read Axiom Space to launch orbital data center
Axiom Space to launch orbital data center

Axiom Space to launch orbital data center

December 21, 2023 Houston

Space infrastructure business Axiom Space has planned to develop an 'orbital data center.' The company is currently developing the world’s first commercial space station, which will initially be a part of the International Space Station, but is planned to separate and remain in orbit, once the...

Read more
Read University of Houston will establish a new energy-focused data facility
University of Houston will establish a new energy-focused data facility

University of Houston will establish a new energy-focused data facility

July 07, 2023 Houston

On Friday, July 7, UH Energy will host an educational symposium with a focus on hydrocarbon basin analysis, policy changes, and hydrocarbon opportunities in India to mark the opening of the new University of Houston (UH) - Directorate General for Hydrocarbon (DGH) Center for Hydrocarbon...

Read more
Read Netrality Data Centers to expand capacity in Houston
Netrality Data Centers to expand capacity in Houston

Netrality Data Centers to expand capacity in Houston

May 15, 2023 Houston

Netrality Data Centers has announced that it is expanding capacity at its Houston data center at 1301 Fannin Street. The company has shared that it will add two new data center halls spanning 17,000 square feet and offering over 2.5 megawatts of critical capacity.Due to come online at the end of...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?