Axiom Space to launch orbital data center
December 21, 2023
Houston
A switch and data center facility that serves as an interconnected transmission site for routing telecommunication traffic across the network.
| Distance | Site | About |
|---|---|---|
| 4.45 miles | Iozera: Houston, TX |
Iozera has acquired an operational enterprise data center in Houston, Texas, with plans to transform it into a cutting-edge, AI-ready multi-tenant hub capable of hosting Nvidia Blackwell GPUs.
|
| 8.06 miles | Prescott Realty Group-5959 Corporate | |
| 13.03 miles | LOGIX 4635 Southwest Fwy |
The site was previously operated by Alpheus Communications before it was acquired by Logix.
|
| 13.42 miles | DataBank Houston Galleria |
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
|
| 13.88 miles | EdgeConneX Houston |
Customer work spaces are available
Raised Floor: 30"
EdgeConnex has rights to adjacent space to accommodate expansion.
|
| 13.88 miles | ScaleMatrix Houston |
The Scalematrix site can expand by an additional 15,000 Square Feet
|
| 13.89 miles | LOGIX Primewest Pkw |
The site was operated by Alpheus before Logix acquired it in January 2018.
|
| 14.67 miles | Skybox Houston One |
Skybox is built to withstand them all with a 6″ concrete roof deck able to sustain winds up to 190+ mph.
The Skybox Houston Campus is fed by a large loop-fed 300 MVA substation.
|
| 14.71 miles | Element Critical Houston One |
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
|
| 14.76 miles | Element Critical: Houston One Bldg-2 |
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.
|
| 15.02 miles | Verizon: 2401 Portsmouth |
Former XO Communications site
|
| 16.01 miles | DataCanopy: Houston, TX | |
| 16.04 miles | Databank Westway Park III |
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
|
| 16.11 miles | DataBank Westway Park II |
|
| 16.15 miles | DataBank Westway Park I |
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
|
| 18.29 miles | Lumen: Houston 5 |
|
| 18.38 miles | 1301 Fannin - Netrality Houston |
1301 Fannin Street is a 25 story 1.1 million square building which was acquired in 2015 by Netrality. 1301 Fannin is the primary telecom hotel and interconnection point in Houston. Netrality operates as a carrier-neutral facility manages the Meet Me Room
|
| 18.38 miles | Verizon: 1301 Fannin | |
| 18.55 miles | Two Shell Plaza (777 Walker) |
|
| 18.55 miles | LOGIX Houston (777 Walker) |
The 777 Walker data center is only one city block from the Alpheus fiber network hub at 1010 Travis, and is interconnected with it on a high capacity DWDM system.
|
| 18.79 miles | Quasar Data Center Houston | |
| 19.78 miles | Lumen Houston 4 |
|
Windstream Enterprise was founded in 2004 and is based in Little Rock, Arkansas. It operates an advanced nationwide network with over 170,000 fiber route miles and a proprietary, scalable Cloud Core architecture. Its services include managed SD-WAN (including SD-WAN Concierge), Secure Access Service Edge (SASE) solutions, cloud on-ramps, unified communications (OfficeSuite UC), security and compliance tools, voice and communication offerings, and cloud connectivity.
December 21, 2023
Houston
July 07, 2023
Houston
May 15, 2023
Houston
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas