Data Center Campus

CoreSite: Santa Clara Campus

Operational
Fully operational facility
Operated by:

Campus at a Glance

7 data centers on this campus
First built in 2011
Total building size: 856,580 SqFt
Coordinates: 37.37599, -121.97077
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

CoreSite's Santa Clara Campus contains seven datacenter buildings. (SV3, SV4, SV5, SV6, SV7, SV8, SV9)

SV3

SV3 was first building on the campus, but was completely leased out to a single tenant, Facebook. The social network has since ended their lease and CoreSite has since backfilled the facility. (Source: DCK)

SV4

SV4 was CoreSite's first multi tenant building on the campus was completed in 2011. Total capital invested in the building has been $93 million.

SV6

In 2016, CoreSite delivered SV6, a 136,580 SF powered shell building, to tenant Amazon Web Services. SV6 is a two-story data center built utilizing a modular structural steel system. The exterior facade features approximately 44,000 sf of terra-cotta rain screen system manufactured in Germany.

SV7

CoreSite SV7 Data Center is a new four-story, 246,000 sf, fully built-out data center built utilizing a modular structural steel system. Electrical and HVAC systems support upto 18 MW of critical IT load. Highlights of the build include ten 2.5 MW emergency generators, a 60,000-gallon underground fuel storage tank, raised floor systems and a 10,000-pound-capacity freight elevator. The exterior facade features a terracotta rain screen system manufactured in Germany.

SV8

SV8 is currently under construction. The building will be four stories with 175,000 sqft. The first phase will be 58,000 square feet with 6 MW of critical power. When fully built out SV8 will support 18 MWs.

SV9

In April 2019, Coresite acquired a 3.8-acre land parcel with a single-story office building located adjacent to our Santa Clara campus, for a purchase price of $26 million. CoreSite expects to develop SV9 after the existing office leases expire.

Data Center Address Building SqFt Gross SqFt Power (MW) Notes
SV3 2901 Coronado Drive 50,000 25,000 Built in 2010
SV4 2972 Stender Way 100,000 50,000 Built in 2011
SV5 2900 Stender Way 100,000 50,000 Built in 2013
SV6 3001 Coronado Drive 136,580 65,000 Data Center built for private client
SV7 3020 Coronado Drive 230,000 75,000 Built in 2016
SV8 3045 Stender Way 175,000 100,000 6 58,000 sqft under construction with expected Q3 2019 opening
Total 791,580 365,000

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
CoreSite SV4 CoreSite
Operational
░░░ Request Dataset MW — 2011
CoreSite SV5 CoreSite
Operational
░░░ Request Dataset MW 100,000 SqFt 2013
CoreSite SV6 CoreSite
Operational
░░░ Request Dataset MW 136,580 SqFt 2016
CoreSite SV7 CoreSite
Operational
░░░░ Request Dataset MW 230,000 SqFt 2016
CoreSite SV9 CoreSite
Operational
░░░░ Request Dataset MW 228,000 SqFt 2025
CoreSite SV3 CoreSite
Operational
░░░ Request Dataset MW — —
CoreSite SV8 CoreSite
Operational
░░░░ Request Dataset MW 162,000 SqFt —

Map and Nearby Locations

CoreSite: Santa Clara Campus Power Growth Over Time

+101% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

CoreSite Realty is a data center REIT with a focus on network dense buildings. The company operates the Any2 Peering Exchange, which is the largest Internet Exchange in the Western US.

CoreSite History

CoreSite Realty Corporation was founded in 2001 as CRG West, a portfolio company of The Carlyle Group. CRG West initially started with two data center buildings; One Wilshire in Los Angeles and 55 South Market in San Jose. The buildings were popular network interconnection and peering points. Although 55 S Market has declined as an interconnection point, One Wilshire continues to be a popular building for network interconnection.

2007: Sold the Company's Jewel to Fuel Expansion

In August, the company sold the One Wilshire Building to Hines REIT for $287 million. The large transaction gave CRG West additional capital to fund the company's growth into new markets.

In May, CRG West acquires buildings in Chicago (for $34 million) and Sommerville just outside of Boston. The Chicago building at 427 S LaSalle was originally designed and built by Western Union. Western Union buildings have traditionally been converted into Carrier Hotels because the telegraph infrastructure with their risers of conduits works well for the telecom industry. The facility is situated across from One Financial Plaza and adjacent to the Chicago Board of Trade.

CoreSite Boston at 70 Innerbelt Road, Somerville, MA is located less than two miles from downtown Boston and Cambridge. The large building has SunGard and Internap as significant tenants also offering colocation

2008: Added Reston

CRG West acquired their Reston facility at 12100 Sunrise Valley.

2009: Rebranded

CRG West rebranded as CoreSite.

2010: IPO added More Capital to Expand

In September, CoreSite became publicly traded on the New York Stock Exchange (NYSE: COR). The Carlyle Group still owned ~50% of the newly public company at the time of the IPO. The Carlyle Group has since reduced their ownership to less than 30%.

2012 Added Denver

In April, CoreSite acquired Comfluent and their two Denver data centers. The data centers were small, but pivotal to the Denver Interconnection and Peering Market. DE1 is located in 910 15th Street, Denver's Telecom Hotel, the Denver Gas & Electric Building (DGEB.) Comfluent was the defacto meet me room for the building. DE2 was 639 E 18th Ave, which was adjacent to Level 3's Denver Gateway site.

CoreSite was headquarted in Denver, but until 2012 did not have any data centers in Colorado.

2013

SV5 was built and leased to a single tenant

2014: New Buildings

  • VA2 launched with an initial build of 50,000 of 198,000 sqft
  • NY2 launched with an initial build of 65,000 of 283,000 sqft

2016: Change at the Top

Tom Ray, CoreSite's CEO since inception retired. Paul Szurek became CoreSites new CEO.

In August, Sunrise Technology Park (STP) was acquired for $60 million with a plan to significantly expand the campus.

Reston Campus Expansions

12100 Sunrise Valley was first acquired in 2008 and CoreSite has since turned the Reston site into a campus. The company constructed a building (VA2) in the parking lot. In 2018, Coresite acquired a 22-acre lot a few blocks away at 12379 Sunrise Valley Drive. The lot will serve to virtually expand the Reston Campus.

The development has four phases and involves building new 3-story data centers and demolishing the old buildings. CoreSite has begun work on VA3 on the new lot.

0
Facilities
0
Markets
0MW
Megawatts

News

Read CoreSite Expands Denver Facility and Opens Santa Clara Data Center
CoreSite Expands Denver Facility and Opens Santa Clara Data Center

CoreSite Expands Denver Facility and Opens Santa Clara Data Center

May 24, 2023 CoreSite SV9

CoreSite, a US-based data center company, has broadened in California with a new Silicon Valley data center and increasing the capacity of an existing facility in Denver, Colorado. California's Santa Clara will become the site of CoreSite's ninth data center. The new 240,000-square-foot SV9...

Read more
Read More News

Documents

Ready to Level up Your
Data Center Strategy?