Vantage: Colorado CO21

Latest Podcast 48th Avenue and E-470
Planned
Future facility in planning stage
Operated by:

Vantage: Colorado CO21

Year Planned: 2028
Ownership: Vantage Data Centers owns the building.
Lot Size: 143 acres

Sites on this Campus:

Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.

Map and Nearby Locations

48th Avenue and E-470
Vantage Data Centers Sites
Nearby Facilities

Vantage: Colorado CO21 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: Colorado CO21

Distance Site About
0.18 miles Vantage: CO2 Expansion
1.43 miles BetaInterested in this information?Contact us
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
1.55 miles Hyde: HighPoint Elevated
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.
2.81 miles 365 Aurora, CO
Purpose-built by SunGard Availability Services in 2001 as DEN-3431; 150,000 sqft single-tenant facility now in 365's portfolio.
3.72 miles QTS: Denver DC2
This facility is part of QTS' Denver Campus in Colorado.
3.74 miles QTS: Denver Campus
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
3.81 miles QTS: Denver DC3
This facility is part of QTS' Denver Campus in Colorado.
4.19 miles JP Morgan Aurora
4.28 miles Lumen Aurora 1
4.95 miles Carrier-Neutral Data CenterInterested in this information?Contact us
8.72 miles Port Colorado: Aurora, CO
This Xcel Energy Certified MegaSite has 1,250-2,000+ acres of developable land available within a 6,500-acre master-planned industrial development.
9.20 miles Lumen Denver 5
11.14 miles 11900 E Cornell
The Digital site is fully leased to Flexential
11.14 miles Flexential Aurora (Cornell)
15,000 kVA UPS system capacity Redundant battery strings with monitoring Branch Circuit Monitoring
12.84 miles CoreSite: DE3 DC2
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
12.84 miles CoreSite: DE3 DC3
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
12.90 miles CoreSite: Denver DE3
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
13.20 miles Iron Mountain DEN-1
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
14.10 miles CoreSite DE2
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
14.11 miles Lumen Denver 1 (1850 North Pearl)
14.22 miles American Tower: Denver
14.40 miles 11:11 Systems: Thornton
This facility has a long history, having previously operated under the Sungard Availability Services and iland brands before being integrated into the 11:11 Systems portfolio.
14.60 miles Handy Networks Denver
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
14.85 miles H5 Denver
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
14.86 miles Flexential Denver (Champa)
14.86 miles DataBank Denver DEN3
14.87 miles 1500 Champa
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
14.89 miles Flexential Denver (Arapahoe)
14.93 miles Lumen Denver 2 & 3
14.93 miles CoreSite Denver DE1
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
14.93 miles VLEC Denver
14.93 miles RockyNet Denver
14.93 miles Denver Gas & Electric Building (910 15th)
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
15.02 miles Charter Communications National Center West
15.03 miles Comcast Centennial
15.19 miles DataBank Centennial (DEN2)
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
15.24 miles DataBank Centennial II (DEN5)
15.39 miles Lockheed Martin Denver
15.44 miles DataCanopy: Denver
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
15.69 miles Expedient Centennial
15.79 miles 501 Wazee
900 kVA UPS system capacity Redundant battery strings Multiple redundant power distribution paths Branch Circuit Monitoring System
16.14 miles Equinix Denver DE1
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
16.15 miles Verizon: 9706 Easter
16.15 miles Aphorio Carter: Centennial, CO
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
16.65 miles Flexential: Parker, CO
Flexential is building its fifth data center in Denver, in the southern district of Parker.
16.65 miles EdgeConneX Denver
Capable of 20+kW per cabinet Capable of 600+ watts per sq ft Real-time branch circuit monitoring
16.71 miles 12121 Grant Street
16.75 miles Centersquare: Denver DEN2
16.75 miles 8534 Concord - Digital Realty
Digital Realty has leased out the building to Cyxtera's DN3 site.
16.79 miles Valley ThreeInterested in this information?Contact us
16.88 miles US Signal Denver CO01
The Denver One Neck data center was built in 2015 at a cost of $20 million. Phase I provides 35,000 Square Feet, but facility can be built out to 160,000 Square Feet over 5 phases.
16.98 miles TerraCom Direct Denver
TerraCom Direct's Denver Colorado site is located in the ViaWest Compark Data Center Complex.
17.01 miles Flexential Englewood
The Englewood site is also known as Flexential's Compark Data Center. Englewood is Flexential's largest site in Denver.
17.11 miles Verizon: 313 Inverness
The site is a previous XO Communications facility
17.30 miles DataBank Englewood (DEN1)
17.32 miles Equinix Denver DE2
Equinix acquired DE2 in Englewood as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DEN1.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read NV Energy Files Lawsuit Against Tract Over Nevada Data Center Costs
Nevada utility NV Energy has filed a lawsuit against Denver-based data center developer Tract, alleging the company failed to cover the costs of serving its facilities and instead shifted those exp...

NV Energy Files Lawsuit Against Tract Over Nevada Data Center Costs

August 04, 2026 Denver

Nevada utility NV Energy has filed a lawsuit against Denver-based data center developer Tract, alleging the company failed to cover the costs of serving its facilities and instead shifted those expenses to other utility customers across the state. “Most data center developers pursuing projects in...

Read more
Read Denver City Council Approves a One-year Moratorium on Data Centers
Denver City Council Approves a One-year Moratorium on Data Centers

Denver City Council Approves a One-year Moratorium on Data Centers

May 20, 2026 Denver

Denver City Council voted Monday to approve a one-year moratorium on new data center developments. The measure temporarily halts the acceptance, processing, and approval of zoning permits, site development plans, and amendment applications related to data centers. However, the moratorium excludes...

Read more
Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read Vantage Refused Approval For Data Center Project Outside Frankfurt.
Vantage Refused Approval For Data Center Project Outside Frankfurt.

Vantage Refused Approval For Data Center Project Outside Frankfurt.

February 08, 2026 Vantage Data Centers

US data center firm Vantage has been denied the chance to develop a new campus outside Frankfurt, Germany. The Groß-Gerau city council this month voted against entering into contract negotiations with the company Vantage Data Centers regarding the establishment of a data center.SPD parliamentary...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?