Data Center Campus

Vantage: Trident at Windler Campus

Vantage Data Centers' planned Trident campus covers 143 acres at E-470 and East 48th Avenue in Aurora, Colorado, next to the Windler community. First building planned for 2028, with expansion planned through 2029.

3 sites Denver
PlannedLand BankProspective Expansion
Future facility in planning stagefacility with additional land secured and prospective expansion planned
Operated by:

Campus at a Glance

3 data centers on this campus
First built in 2028 with expansions through 2029
Coordinates: 39.78604, -104.72024
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Vantage Data Centers is developing the Trident campus in northeast Aurora, Colorado, on the northwest and southwest corners of E-470 and East 48th Avenue in Adams County. The site is about six miles southwest of the Denver International Airport terminal.

Land. Vantage Data Centers CO21 LLC bought two lots in Windler Subdivision Filing No. 3 on January 15, 2025, for $109.3 million. One lot is 108 acres north of 48th Avenue; the other is 35 acres south of it. The land was part of the 850-acre Windler master plan. Aurora rezoned it to Airport District in 2022, where data centers are a use by right.

Site plan. Vantage filed "Trident Data Center at Windler" (City of Aurora case DA-1707-46) on August 25, 2025. The plan shows two two-story data center buildings of about 860,000 square feet on the north lot. It keeps at least a 350-foot buffer, a brick wall and landscaping toward nearby homes. The design includes 28 emergency diesel generators, battery energy storage and closed-loop chillers. The south lot has no filed plan.

Power. Xcel Energy serves the site. Vantage completed an Xcel load study by mid-2025.

Approvals. In June 2025, Aurora approved a business incentive agreement worth up to $38.9 million over 10 years, tied to 50 jobs. No tenant has been announced. Residents of The Reserve, Windler and Green Valley Ranch oppose the project. Mayor Mike Coffman said he will call the site plan up for a council vote once staff approve it.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Vantage: CO21 Vantage Data Centers
Planned
— — 2028
Vantage: CO22 Vantage Data Centers
Planned
— — 2029
Vantage: CO2 Expansion Vantage Data Centers
Land BankProspective Expansion
— — —

Map and Nearby Locations

Vantage: Trident at Windler Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.