CoreSite seeks tax rebate for Denver data center
September 01, 2024
Denver
This Xcel Energy Certified MegaSite has 1,250-2,000+ acres of developable land available within a 6,500-acre master-planned industrial development. With unique access to Denver’s tech talent, Port Colorado Data is well-suited for disaster recovery, co-location, hyper-scale computing, and enterprise data center space.
| Distance | Site | About |
|---|---|---|
| 3.91 miles | Carrier-Neutral Data Center Request Dataset | |
| 8.15 miles | Hyperscale Data Center Request Dataset |
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
|
| 8.43 miles | QTS: Denver Campus |
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
|
| 8.67 miles | QTS: Denver DC2 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 8.70 miles | QTS: Denver DC3 |
This facility is part of QTS' Denver Campus in Colorado.
|
| 8.71 miles | Lumen Aurora 1 | |
| 8.72 miles | Vantage: Colorado CO21 |
Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.
|
| 8.77 miles | JP Morgan Aurora |
|
| 8.87 miles | Hyde: HighPoint Elevated |
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.
|
| 8.89 miles | Vantage: CO2 Expansion | |
| 10.85 miles | 365 Aurora, CO |
|
| 15.48 miles | Lumen Denver 5 |
|
| 17.34 miles | 11900 E Cornell |
The Digital site is fully leased to Flexential
|
| 17.34 miles | Flexential Aurora (Cornell) |
15,000 kVA UPS system capacity
Redundant battery strings with monitoring
Branch Circuit Monitoring
|
| 19.38 miles | Comcast Centennial |
|
| 19.55 miles | Flexential Denver (Arapahoe) |
|
| 19.87 miles | DataBank Centennial (DEN2) |
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
|
| 19.89 miles | DataBank Centennial II (DEN5) |
|
September 01, 2024
Denver
July 15, 2024
Denver
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas